Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 4:5 — Write the ratio pounds : dollars as 1 : 1.25. Multiply both parts by 4 to clear the decimal: 1 × 4 = 4 and 1.25 × 4 = 5, giving 4 : 5. (5:4 comes from writing the ratio the wrong way round, dollars to pounds. 1:1 comes from rounding 1.25 dollars down to the nearest whole dollar. 1:5 comes from multiplying only the dollars by 4 to clear the decimal and leaving the pounds as 1 — both parts of a ratio must be multiplied by the same number.)
- (c) £22.50 — Method: find the cost of 1 kg, then multiply by the mass wanted. Working: £36 ÷ 2.4 = £15 per kilogram, and 1.5 × £15 = £22.50. Answer: £22.50. The distractors: £15 is the price of 1 kg, which is the first step and not what the question asks for; £54 comes from multiplying the £36 by 1.5 without first reducing it to a price per kilogram; £57.60 comes from using the scale factor upside down, multiplying £36 by 2.4 ÷ 1.5 = 1.6 instead of by 1.5 ÷ 2.4.
- (a) 2.5 — Method: the factor by which the SIZE of one rate is greater than the size of another is found by dividing the larger magnitude by the smaller magnitude, ignoring their signs, so here the two magnitudes to work with are 8.75 and 3.5. Working: 8.75 ÷ 3.5 = 2.5, so the size of the instantaneous rate of change at t = 2 hours was 2.5 times the size of the instantaneous rate of change at t = 8 hours. Subtracting the two magnitudes, 8.75 − 3.5 = 5.25, gives how many thousand litres per hour greater one rate is than the other, not how many times greater — that is a difference, not a factor. Dividing the magnitudes the wrong way round, 3.5 ÷ 8.75 = 0.4, gives the factor by which the rate at t = 8 hours is smaller than at t = 2 hours, the reciprocal of what was asked for. Adding the magnitudes, 8.75 + 3.5 = 12.25, combines the two rates instead of comparing them, and does not answer a 'by what factor' question at all. A question that asks 'by what factor' is always answered by a division, in the order the question states it — check which rate is on top before you divide.
- (a) 45% — Method: percentage increase = increase ÷ original amount × 100. Working: the increase is £116 − £80 = £36, and 36 ÷ 80 = 0.45, so 0.45 × 100 = 45%. Answer: 45%. The distractors: 36% comes from quoting the £36 increase as though pounds and per cent were the same thing; 31% comes from dividing the £36 increase by the new price £116 instead of by the original £80, which gives 31% to the nearest per cent; 145% is the new price written as a percentage of the original price, which is the whole of the new price rather than the increase.
- (c) 16% — Method: scale each concentration to its own mass to find the salt it contains, add the two masses of salt, then write the ratio of salt to mixture per 100 g. Working: 10:100 = x:300 gives 30 g of salt, and 25:100 = y:200 gives 50 g of salt; the mixture holds 30 + 50 = 80 g of salt in 300 + 200 = 500 g of solution; 80:500 = 16:100. Answer: 16%. The distractors: 17.5% is the mean of 10% and 25%, which ignores that there is more of the weaker solution than of the stronger one; 19% comes from swapping the two concentrations over, working out (300 × 25% + 200 × 10%) ÷ 500; 26.7% comes from dividing the 80 g of salt by the 300 g of the first solution rather than by the 500 g of mixture.
- (a) 12 m² — Real length = 8 × 50 = 400 cm = 4 m. Real width = 6 × 50 = 300 cm = 3 m. Real area = 4 × 3 = 12 m². Scaling the plan area (8 × 6 = 48 cm²) by 50 instead of by 50 squared gives 48 × 50 = 2400 cm² = 0.24 m² — area scales by the square of the length scale factor, not the scale factor itself. Multiplying the real dimensions in centimetres, 400 × 300 = 120 000, and calling the result 120 000 m² mistakes square centimetres for square metres. Converting only the length to metres and leaving the width as 6 (treating centimetres as metres), 4 × 6 = 24, gives 24 m², from a scaling that was never finished.
- (d) 60 km/h — Method: use the formula v = d ÷ t with the distance and time given. Working: 180 ÷ 3 = 60 km/h. So the average speed is 60 km/h. Distractor 540 km/h comes from multiplying the distance and time instead of dividing. Distractor 90 km/h comes from dividing by 2 instead of 3. Distractor 18 km/h comes from dividing by 10 instead of 3, a decimal-point slip.
- (b) Day 3 to Day 4 — Method: the average rate of increase between two consecutive days is the difference in the number of orders divided by the number of days between them, which here is just the difference itself, since each gap is one day; comparing all four differences finds which is greatest. Working: the differences are 1,509 − 1,284 = 225 (Day 1 to Day 2), 1,830 − 1,509 = 321 (Day 2 to Day 3), 2,296 − 1,830 = 466 (Day 3 to Day 4), and 2,510 − 2,296 = 214 (Day 4 to Day 5); 466 is the greatest of the four, so the rate of increase was greatest from Day 3 to Day 4. Choosing Day 4 to Day 5 comes from picking the interval that ends on the highest total number of orders, 2,510, confusing the SIZE of the total with the RATE at which it grew. Choosing Day 1 to Day 2 comes from assuming the rate must be greatest at the very start, without working out any of the four differences. Choosing Day 2 to Day 3 comes from comparing only the first two differences, 225 and 321, and stopping there without checking Day 3 to Day 4 or Day 4 to Day 5. Finding the greatest rate of change from a table always means computing every difference between consecutive values and comparing them all — the day with the highest total, or the first pair you check, is not a shortcut.
- (a) 1/9 — The ratio copper : tin is 9:1, so write tin over copper: 1/9. (9/1 comes from writing the ratio the wrong way round, copper over tin. 1/10 comes from comparing the tin to the total mass of the alloy, 1 part out of 10. 9/10 comes from comparing the copper to the total mass of the alloy, 9 parts out of 10.)
- (a) 80 km/h — Average speed = total distance ÷ total time. Total distance = 45 + 75 = 120 km. Total time = 30 minutes + 1 hour = 1.5 hours. 120 ÷ 1.5 = 80 km/h. 60 km/h comes from treating the 30 minutes as a whole hour, giving a total time of 2 hours instead of 1.5 (120 ÷ 2). 82.5 km/h comes from averaging the two separate speeds (45 ÷ 0.5 = 90 km/h and 75 ÷ 1 = 75 km/h, then (90 + 75) ÷ 2) instead of using total distance over total time. 75 km/h comes from using only the second part of the journey (75 km in 1 hour) and ignoring the first part.
- (d) 24 — Method: split 60 into 3 + 7 = 10 equal parts, find the value of one part, then use the difference in ratio parts. Working: 60 ÷ 10 = 6, so the numbers are 3 × 6 = 18 and 7 × 6 = 42, and their difference is 42 − 18 = 24. Answer: 24. 4 comes from finding the difference between the ratio numbers, 7 − 3, but forgetting to multiply by the value of one part. 60 comes from adding the two numbers back together instead of subtracting, which just repeats the given sum. 80 comes from dividing 60 by the first ratio number, 3, instead of by the total number of parts, 10, giving a part value of 20 and a difference of 7 × 20 − 3 × 20 = 80.
- (b) £250 — Since cost is proportional to the cube of the radius, C = kr³. Using r = 3, C = 54: 3³ = 27, so 54 = k × 27, giving k = 54 ÷ 27 = 2. The equation is C = 2r³. When r = 5: 5³ = 125, so C = 2 × 125 = 250. Treating the relationship as proportional to r² instead of r³ gives k = 54 ÷ 9 = 6 and then C = 6 × 25 = 150, which models area scaling, not volume scaling. Treating it as proportional to r itself gives k = 54 ÷ 3 = 18 and then C = 18 × 5 = 90. Finding k correctly from the cube but then multiplying it by the radius instead of by the cube of the radius gives 2 × 5 = 10, which applies the right constant to the wrong power of r. The cost of a container of radius 5 cm is £250.
- (d) 2:5 — The ratio of the y-values equals the ratio of the coefficients of x, since x cancels: 2x : 5x = 2 : 5.
- (c) 14 litres — Method: find the amount of fuel used per km first, then use it to find the fuel needed for 175 km. Working: 24 ÷ 300 = 0.08 litres per km, and 0.08 × 175 = 14 litres. So 14 litres are needed. Distractor 24 litres comes from assuming the same amount of fuel is used no matter the distance, without scaling. Distractor 21 litres comes from misreading the original distance as 200 km instead of 300 km. Distractor 1.4 litres comes from a decimal-point slip, giving an answer ten times too small.
- (a) The gradient is 3; the candidate's method is right. — The gradient of a tangent, like any straight line, is the change in y divided by the change in x between two points on it. Here the tangent passes through (1, 2) and (5, 14), so the change in y is 14 − 2 = 12 and the change in x is 5 − 1 = 4. The gradient is 12 ÷ 4 = 3, so the candidate's calculation is correct. Subtracting in the wrong order, (2 − 14) ÷ (5 − 1), gives −12 ÷ 4 = −3, the wrong sign. Adding the two changes instead of dividing them, 12 + 4 = 16, does not find a gradient at all. Dividing the change in x by the change in y instead of the other way round, 4 ÷ 12 = 1/3, inverts the calculation completely. Before accepting or rejecting a claimed gradient, always redo the calculation yourself in the same order — change in y over change in x — rather than trusting the arithmetic as given.
Build your own mix at the worksheet builder.