Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) £3.60 per component — The gradient of a cost-against-components graph has units of pounds per component, since cost is measured in pounds and the horizontal axis counts components. So 3.60 means it costs an extra £3.60 to produce one more component at that point. Calling it '£3.60 total cost' confuses the gradient, a rate, with the y-value on the graph, which is the total cost itself. Giving it as 3.60 components per pound swaps which axis is on top, giving the units of the reciprocal gradient, not the gradient itself. Turning 3.60 into a percentage invents a unit that has no basis in the graph's axes — a gradient here is a number of pounds, not a percentage. Always build the gradient's units from the two axes' own units, in the order y-axis over x-axis.
- (b) 25 m/s — Convert km/h to m/s by multiplying by 1000 (km to m) and dividing by 3600 (hours to seconds): 90 × 1000 ÷ 3600 = 25 m/s. Working out 90 ÷ 60 = 1.5 converts using 60, as if going from hours to minutes rather than to seconds. Working out 90 × 3.6 = 324 multiplies by 3.6 instead of dividing by it, going the wrong way between the units. Working out 90 × 1000 = 90000 converts kilometres to metres but forgets to convert hours to seconds at all. The train's speed is 25 m/s.
- (a) 10 — Since y is directly proportional to x², y = kx². Using x = 4, y = 32: 32 = k × 16, so k = 32 ÷ 16 = 2. The equation is y = 2x². When y = 200: x² = 200 ÷ 2 = 100, so x = 10, taking the positive root because the question states that x is positive. Stopping at x² = 100 without taking the square root leaves 100, not the value of x itself. Treating the relationship as if y were proportional to x itself gives k = 32 ÷ 4 = 8 and then x = 200 ÷ 8 = 25, which is a different relationship entirely. Multiplying by k instead of dividing when rearranging gives x² = 200 × 2 = 400 and x = 20, which is not this equation rearranged correctly. The value of x when y = 200 is 10.
- (c) 2:3 — The white paint is 5 − 2 = 3 litres. The ratio of blue paint to white paint is 2 : 3, which has no common factor, so it is already in simplest form. Getting 2 : 5 compares the blue paint to the total amount of shade instead of to the white paint. Getting 3 : 2 has the two parts the wrong way round. Getting 5 : 3 uses the total amount of shade instead of the blue paint as the first part.
- (d) 4.7 km — Multiply the map length by the scale factor: 9.4 × 50 000 = 470 000 cm. Convert to kilometres: 470 000 cm = 4700 m = 4.7 km. Converting only to metres and calling the answer 4700 kilometres mistakes metres for kilometres. Misreading the scale as 1 : 5000 instead of 1 : 50 000, 9.4 × 5000 = 47 000 cm = 0.47 km, is ten times too small. Misplacing the decimal point in 9.4 and effectively using 94, 94 × 50 000 = 4 700 000 cm = 47 km, is ten times too big.
- (c) 2/7 — Method: each number in a ratio counts parts, so the whole is all the parts added together, and the fraction wanted is the cement parts over that total. Working: the mix has 5 + 2 = 7 parts altogether, and 2 of those parts are cement, so the cement is 2/7 of the mix. Answer: 2/7. The distractors: 2/5 comes from writing the cement parts over the sand parts, comparing one part with the other part instead of with the whole; 5/7 comes from writing the sand parts over the total, which answers about the wrong material; 7/2 comes from writing the total over the cement parts, turning the fraction upside down.
- (b) £52 — Method: the difference between the two ratio numbers tells you how many parts the £39 difference represents. Working: the difference in parts is 7 − 4 = 3, and this represents £39, so one part is £39 ÷ 3 = £13. Josh's savings are 4 × £13 = £52. So Josh has £52. Distractor £91 is Mia's savings, not Josh's. Distractor £39 comes from using the given £39 difference as the final answer, without scaling it to Josh's number of parts. Distractor £13 is the value of one part, found correctly but never multiplied by 4.
- (d) 26.6 — Find the constant multiplier — the mass of each metre of pipe: 12.6 ÷ 4.5 = 2.8, so the mass is always 2.8 times the length. For a length of 9.5 m, the mass is 9.5 × 2.8 = 26.6 kg. 17.6 comes from assuming an additive relationship instead of a multiplicative one — adding the increase in length (9.5 − 4.5 = 5) onto 12.6. 3.4 comes from using the multiplier the wrong way round (4.5 ÷ 12.6, rounded to 1 d.p.), then multiplying by 9.5. 12.6 comes from simply repeating the given mass, without applying the multiplier to the new length.
- (b) Takings rise about £14 per 1°C rise — The gradient here is positive, so as temperature rises, takings rise too: near 22°C, takings increase by about £14 for every 1°C rise in temperature. Reversing this to say takings rise for every 1°C FALL gets the direction of the independent variable backwards — a positive gradient means both quantities move the same way. Saying 'takings are £14 at 22°C' confuses the gradient, a rate of change, with the y-value on the graph, which is the takings itself. Saying takings 'rose £14 in total' from 0°C to 22°C treats the gradient at a single point as if it applied over the whole range from 0°C to 22°C, when it only describes the instant at 22°C. Always keep a rate, a total change and a single reading separate.
- (b) 48 m² — Method: lengths are multiplied by the scale factor, but areas are multiplied by its square. Working: 1 cm on the plan stands for 200 cm = 2 m, so 1 cm² on the plan stands for 2 × 2 = 4 m², and 12 × 4 = 48. Answer: 48 m². The distractors: 24 m² comes from scaling the area by the length factor 2 instead of by its square; 2400 m² comes from multiplying the area by the scale 200 as though it were a length; 4800 m² comes from working in centimetres, 12 × 200² = 480 000 cm², and then dividing by 100 instead of by 10 000 to reach square metres.
- (b) Day 3 to Day 4 — Method: the average rate of increase between two consecutive days is the difference in the number of orders divided by the number of days between them, which here is just the difference itself, since each gap is one day; comparing all four differences finds which is greatest. Working: the differences are 1,509 − 1,284 = 225 (Day 1 to Day 2), 1,830 − 1,509 = 321 (Day 2 to Day 3), 2,296 − 1,830 = 466 (Day 3 to Day 4), and 2,510 − 2,296 = 214 (Day 4 to Day 5); 466 is the greatest of the four, so the rate of increase was greatest from Day 3 to Day 4. Choosing Day 4 to Day 5 comes from picking the interval that ends on the highest total number of orders, 2,510, confusing the SIZE of the total with the RATE at which it grew. Choosing Day 1 to Day 2 comes from assuming the rate must be greatest at the very start, without working out any of the four differences. Choosing Day 2 to Day 3 comes from comparing only the first two differences, 225 and 321, and stopping there without checking Day 3 to Day 4 or Day 4 to Day 5. Finding the greatest rate of change from a table always means computing every difference between consecutive values and comparing them all — the day with the highest total, or the first pair you check, is not a shortcut.
- (b) €230.00 — Multiply the amount in pounds by the exchange rate: 200 × 1.15 = 230, so £200 = €230.00. Working out 200 + 1.15 = 201.15 treats the exchange rate as an amount to add rather than a multiplier. Working out 200 × 0.15 = 30 finds only the extra amount earned for every pound and forgets to add it back to the original £200. Working out 200 × 11.5 = 2300.00 misplaces the decimal point in the exchange rate, multiplying by 11.5 instead of 1.15. £200 converts to €230.00.
- (b) 1:1.6 — To write 5 : 8 in the form 1 : n, divide both parts by 5, the first number, so that it becomes 1: 5 ÷ 5 = 1 and 8 ÷ 5 = 1.6, giving 1 : 1.6. Dividing both parts by 8 instead gives 0.6 : 1 (5 ÷ 8 = 0.625, rounded to 0.6) — the first part is no longer 1, so this is not in the required form. Dividing 5 by 8 but writing the result after the 1 gives 1 : 0.6, which divides in the wrong direction: n must come from 8 ÷ 5, not 5 ÷ 8. A slip in the division 8 ÷ 5, rounding it to 1.5 instead of the correct 1.6, gives 1 : 1.5.
- (a) 4 hours — This is inverse proportion: more pumps take less time. Multiply the original numbers to find the total pump-hours needed: 2 × 10 = 20 pump-hours. Divide by the new number of pumps: 20 ÷ 5 = 4 hours. Working out 10 × 5 ÷ 2 = 25 hours treats it as direct proportion, as if more pumps needed more time. Stopping at 20 gives the total pump-hours, not the number of hours. Working out 10 − (5 − 2) = 7 hours subtracts the extra number of pumps straight from the number of hours, treating pumps and hours as the same kind of quantity. 5 pumps take 4 hours.
- (b) 10000 cm² — Method: an area conversion factor is the square of the length conversion factor, because both sides of the square are scaled. Working: a square metre is a square of side 100 cm, so its area is 100 × 100 = 10000 cm². Answer: 10000 cm². The distractors: 100 cm² comes from using the length factor without squaring it; 200 cm² comes from doubling the length factor instead of squaring it; 1000000 cm² comes from cubing the factor, which is the conversion for a volume, not an area.
Build your own mix at the worksheet builder.