Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 4 km — Since signal strength is inversely proportional to the square of the distance, S = k/d². Using d = 2, S = 20: 2² = 4, so 20 = k ÷ 4, giving k = 20 × 4 = 80. The equation is S = 80/d². When S = 5: d² = 80 ÷ 5 = 16, so d = 4 (taking the positive root, since distance cannot be negative). Stopping at d² = 16 without taking the square root leaves 16, the square of the distance, not the distance itself. Treating the relationship as inversely proportional to distance itself, rather than to its square, gives k = 20 × 2 = 40 and then d = 40 ÷ 5 = 8, a different relationship. Multiplying by S instead of dividing by it when isolating d² gives d² = 80 × 5 = 400 and d = 20, the wrong operation. The distance at which the signal strength is 5 units is 4 km.
- (b) 48 m² — Method: lengths are multiplied by the scale factor, but areas are multiplied by its square. Working: 1 cm on the plan stands for 200 cm = 2 m, so 1 cm² on the plan stands for 2 × 2 = 4 m², and 12 × 4 = 48. Answer: 48 m². The distractors: 24 m² comes from scaling the area by the length factor 2 instead of by its square; 2400 m² comes from multiplying the area by the scale 200 as though it were a length; 4800 m² comes from working in centimetres, 12 × 200² = 480 000 cm², and then dividing by 100 instead of by 10 000 to reach square metres.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (d) 7/3 — The ratio cranberry : apple is 3:7, so apple juice is 7 parts and cranberry juice is 3 parts. Write apple over cranberry: 7/3. (3/7 comes from writing the ratio the wrong way round, cranberry over apple. 7/10 comes from comparing the apple juice to the total amount of the mixture, 7 parts out of 10. 3/10 comes from comparing the cranberry juice to the total amount of the mixture, 3 parts out of 10.)
- (b) 1500 m — Method: multiply the map length by the scale to get the real length in centimetres, then divide by 100 to change centimetres into metres. Working: 3 × 50 000 = 150 000 cm, and 150 000 ÷ 100 = 1500. Answer: 1500 m. The distractors: 15000 m comes from dividing the 150 000 cm by 10 instead of 100; 150 m comes from dividing by 1000, the conversion for kilometres; 50000 m comes from writing the scale itself as the answer and ignoring the 3 cm measured on the map.
- (a) 10 — Since y is directly proportional to x², y = kx². Using x = 4, y = 32: 32 = k × 16, so k = 32 ÷ 16 = 2. The equation is y = 2x². When y = 200: x² = 200 ÷ 2 = 100, so x = 10, taking the positive root because the question states that x is positive. Stopping at x² = 100 without taking the square root leaves 100, not the value of x itself. Treating the relationship as if y were proportional to x itself gives k = 32 ÷ 4 = 8 and then x = 200 ÷ 8 = 25, which is a different relationship entirely. Multiplying by k instead of dividing when rearranging gives x² = 200 × 2 = 400 and x = 20, which is not this equation rearranged correctly. The value of x when y = 200 is 10.
- (b) 450.00 kg — 1 m³ = 100 × 100 × 100 = 1,000,000 cm³, so 0.5 m³ = 500,000 cm³. Mass = density × volume = 0.9 × 500,000 = 450,000 g. Converting to kilograms by dividing by 1000 gives 450,000 ÷ 1000 = 450.00 kg. Skipping the m³-to-cm³ conversion and multiplying 0.9 × 0.5 = 0.45 treats the volume as if it were already 0.5 cm³, giving 0.45 kg. Finding the mass correctly in grams, 450,000 g, but not converting to kilograms leaves 450000.00 kg, out by a factor of 1000. Using the area conversion factor of 10,000, as if converting m² to cm², instead of the volume factor of 1,000,000 gives 0.5 × 10,000 = 5,000 'cm³', and a mass of 0.9 × 5,000 = 4,500 g, which is 4.50 kg.
- (b) 19.0 g/cm³ — Density = mass ÷ volume. 342.6 ÷ 18 = 19.0333…, which rounds to 19.0 g/cm³ (1 d.p.). 6166.8 g/cm³ comes from multiplying the mass by the volume instead of dividing (342.6 × 18). 324.6 g/cm³ comes from subtracting the volume from the mass (342.6 − 18) instead of dividing. 0.1 g/cm³ comes from dividing the volume by the mass instead of the mass by the volume (18 ÷ 342.6 = 0.0525…, rounded to 1 d.p.).
- (d) Faster at t = 8s — still accelerating — The gradient of a tangent on a distance-time graph is the instantaneous speed, in m/s. At t = 2 seconds the speed is 6 m/s; at t = 8 seconds it is 9.5 m/s, which is faster, so the sprinter is still accelerating between these two times. Saying the sprinter is slower at t = 8s reverses the comparison — 9.5 is greater than 6, not less. Writing 9.5 − 6 = 3.5 and calling this 'metres further covered' turns the difference of two speeds into a distance, which the units do not support: a difference of two speeds is itself a speed, not a distance. Taking 9.5 m/s, the larger of the two instantaneous speeds, as the average speed for the whole race confuses a speed at one instant with an average over the whole distance, which would need the total distance and total time, not two tangent gradients.
- (d) £117.60 — Add the hours worked over the two days: 6 + 4.5 = 10.5 hours. Multiply by the rate of pay: 10.5 × £11.20 = £117.60. (£67.20 is Monday's pay only. £50.40 is Tuesday's pay only. £106.40 comes from mistakenly adding the hours as 6 + 3.5 = 9.5 — misreading Tuesday's 4.5 hours as 3.5 — and then multiplying by £11.20.)
- (c) 1 : 3 — n : P = 15 : 45. Dividing both parts by their highest common factor, 15, gives 1 : 3. Inverting the ratio, 3 : 1, swaps profit and number of items. Dividing only the n-part by 15, getting 1, but leaving the P-part as 45 gives 1 : 45 — only one side has been simplified. Dividing only the P-part by 15, getting 3, but leaving the n-part as 15 gives 15 : 3, the opposite partial mistake.
- (a) 3/2 — Find each average speed: car = 180 ÷ 3 = 60 mph; lorry = 160 ÷ 4 = 40 mph. Put the car's speed over the lorry's speed: 60/40. Divide both numbers by their highest common factor, 20: 60÷20 = 3, 40÷20 = 2, giving 3/2. (2/3 comes from writing the speeds the wrong way round. 9/8 comes from comparing the distances travelled, 180/160, without working out the speeds. 3/4 comes from comparing the times taken, 3/4, instead of the speeds.)
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
- (b) 75 — The exchange rate is constant: k = 46 ÷ 40 = 1.15 euros per pound. For £65, the number of euros is 1.15 × 65 = 74.75, which rounds to 75 euros. Getting 74 comes from rounding 74.75 down instead of to the nearest whole number. Getting 57 comes from using the reciprocal rate (40 ÷ 46) instead of 46 ÷ 40. Getting 71 comes from adding the difference between 65 and 40 (25) onto 46 instead of using the proportional rate.
- (d) 64 — Since y is directly proportional to √x, y = k√x. Using x = 25, y = 20: √25 = 5, so 20 = k × 5, giving k = 20 ÷ 5 = 4. The equation is y = 4√x. When y = 32: √x = 32 ÷ 4 = 8, and x = 8² = 64. Stopping at √x = 8 without squaring leaves the square root of x, not x itself. Treating the relationship as if y were proportional to x itself gives k = 20 ÷ 25 = 0.8 and then x = 32 ÷ 0.8 = 40, which is a different relationship entirely. Multiplying instead of dividing when isolating √x gives √x = 32 × 4 = 128, far too large to be a square root here. When y = 32, x = 64.
Build your own mix at the worksheet builder.