Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 500 — Pressure = force ÷ area = 250 ÷ 0.5 = 500 pascals. Getting 125 comes from multiplying the force by the area instead of dividing (250 × 0.5 = 125). Getting 249.5 comes from subtracting the area from the force instead of dividing. Getting 50 comes from misreading the area as 5 m² instead of 0.5 m² and dividing 250 by 5.
- (a) 4:3 — Multiply both parts by the lowest common denominator, 6: (2/3) × 6 = 4 and (1/2) × 6 = 3, giving the ratio 4 : 3, which is already in simplest form.
- (d) 125 — Since y is directly proportional to x², y = kx² for a constant k. Using x = 3, y = 45: 45 = k × 9, so k = 45 ÷ 9 = 5. The equation is y = 5x². When x = 5: 5² = 25, and 5 × 25 = 125, so y = 125. Reporting 5² = 25 on its own, without multiplying by the constant k, gives only the square of the new x-value, not the value of y. Treating the proportion as if y were proportional to x itself, rather than to x², gives k = 45 ÷ 3 = 15 and then y = 15 × 5 = 75, which is not this relationship. Squaring the new x-value as though squaring meant doubling it instead gives 5 × 10 = 50, not the true square. When x = 5, y = 125.
- (d) £82.50 — Find the hourly rate: £52.50 ÷ 7 = £7.50 per hour. For 11 hours: 11 × £7.50 = £82.50. £30 comes from working out the pay for only the extra 4 hours (4 × £7.50), and forgetting to include the original £52.50. £99 comes from misremembering the hourly rate as £9 instead of £7.50, then 11 × £9. £56.50 comes from adding the extra number of hours (4) straight onto the pay in pounds (52.5 + 4), confusing hours with pounds.
- (b) Car A, 50 km/h — Method: speed = distance ÷ time for each car, then compare. Working: Car A = 150 ÷ 3 = 50 km/h. Car B = 180 ÷ 4 = 45 km/h. Since 50 > 45, Car A is faster, travelling at 50 km/h. Wrong options: Car B, 45 km/h correctly finds Car B's speed but wrongly names the slower car as faster; Car A, 45 km/h picks the correct car but uses Car B's speed by mistake; Car B, 50 km/h picks the wrong car but uses Car A's correct speed value.
- (b) 5:8 — The mix has 5 parts sand and 3 parts cement, so 5 + 3 = 8 parts in total. Sand to total is 5 : 8, and since the highest common factor of 5 and 8 is 1, this is already in its simplest form. Giving 5 : 3 answers sand to cement, not sand to the total mix. Giving 3 : 8 is cement to total, the wrong part of the mix. Giving 8 : 5 has the total and the sand swapped round.
- (a) 7 — The average rate of change of y with respect to x over an interval is the change in y divided by the change in x between its two endpoints — the gradient of the chord joining them, not a rate at a single point. At x = 1: 2 × 1 = 2, so y = 1 + 2 = 3. At x = 4: 2 × 4 = 8, so y = 16 + 8 = 24. The change in y is 24 − 3 = 21 and the change in x is 4 − 1 = 3, so the average rate of change is 21 ÷ 3 = 7. Reporting the change in y, 21, on its own is not a rate of change, because it has not been divided by the 3 units of x over which it happened. Reporting 3 is not a rate either — 3 is the width of the interval, and also the value of y at x = 1, and neither of those measures how fast y is changing. Subtracting in the wrong order gives −21 ÷ 3 = −7, the wrong sign. The average rate of change of y with respect to x over the interval is 7.
- (d) 250 cm³/s — Method: first change litres per minute into cm³ per minute, then change per minute into per second. Working: 15 × 1000 = 15000 cm³ per minute, then 15000 ÷ 60 = 250 cm³ per second. So the tank fills at 250 cm³ per second. Distractor 15000 cm³/s comes from stopping after the first step and forgetting to change minutes into seconds. Distractor 900000 cm³/s comes from multiplying by 60 instead of dividing. Distractor 2500 cm³/s comes from dividing by 6 instead of 60.
- (d) The 750 g box, at 36p per 100 g — Work out the cost per 100 g of each box. 750 g box: 270p ÷ 7.5 = 36p per 100 g. 500 g box: 195p ÷ 5 = 39p per 100 g. The lower cost per 100 g is the better value, so the 750 g box at 36p per 100 g is the answer. Choosing the 500 g box at 39p per 100 g gets the maths right but picks the higher unit price, not realising a smaller cost per 100 g is the better deal. Choosing the 500 g box because £1.95 is lower than £2.70 compares the total prices without allowing for the different pack sizes at all. Working out 270 ÷ 5 = 54p divides the 750 g box's price by the wrong number of hundred-grams (the 500 g box's), giving a rate that belongs to neither box. The 750 g box, at 36p per 100 g, is the better value.
- (c) 135 g — Find the ratio of butter to sugar in the first batch: 240:160, which simplifies to 3:2. For the second batch, sugar = 90 g, so butter = 90 × 3/2 = 135 g. (60 g comes from using the ratio the wrong way round, 90 × 2/3. 170 g comes from subtracting the drop in sugar, 160 − 90 = 70 g, from the original butter amount, 240 − 70, instead of scaling. 240 g comes from not scaling the butter amount at all.)
- (a) 15.3 litres — Squash : water = 2 : 9, so water is 9 ÷ 2 = 4.5 times the amount of squash. Multiply: 3.4 × 4.5 = 15.3 litres. Using the multiplier upside down — treating squash as 9 ÷ 2 times water, when it is water that is 9 ÷ 2 times squash — and calculating 3.4 × (2 ÷ 9) gives about 0.8 litres (to 1 d.p.); that would be the squash needed for 3.4 litres of water, not the water needed for 3.4 litres of squash. Adding the difference between the ratio parts, 9 − 2 = 7, to the squash amount, 3.4 + 7 = 10.4, mistakes a ratio for a fixed extra amount. Using the total number of parts, 2 + 9 = 11, so the multiplier 11 ÷ 2 = 5.5, gives 3.4 × 5.5 = 18.7 litres — that finds the total mix from the squash amount, not the water alone.
- (d) £8262 — A fall of 15% is a multiplier of 0.85 and a fall of 10% is a multiplier of 0.9, and each multiplier acts on the value at the start of its own year. After year 1: 12000 × 0.85 = 10200. After year 2: 10200 × 0.9 = 9180. After year 3: 9180 × 0.9 = 8262. The value 3 years after the car was bought is £8262. Adding the percentages to make a single fall of 35% would be wrong, because the later falls are taken from smaller values.
- (c) 1.05 litres — Method: find the value of one part of the ratio from the total volume, then find the share for pineapple juice. Working: the ratio 5:3:2 has 5 + 3 + 2 = 10 parts, so one part is 3.5 ÷ 10 = 0.35 litres, and the pineapple juice is 3 × 0.35 = 1.05 litres. So 1.05 litres of pineapple juice is needed. Distractor 1.75 litres is the volume of orange juice, not pineapple juice. Distractor 0.7 litres is the volume of lemonade, not pineapple juice. Distractor 0.35 litres is the value of one part, found correctly but never multiplied by 3.
- (d) 4 years — Apply the recurrence repeatedly. V_1 = 0.85 × 18000 = 15300. V_2 = 0.85 × 15300 = 13005. V_3 = 0.85 × 13005 = 11054.25. V_4 = 0.85 × 11054.25 = 9396.1125. V_3 = £11054.25 is still above £10000, but V_4 = £9396.11 has dropped below it, so the answer is 4 years. Stopping at V_3 and calling it '3 years' misreads £11054.25 as already below £10000, or comes from wrongly modelling the fall as a flat £2700 a year (15% of the original value each time, without compounding), which crosses £10000 a year too early. Continuing one extra step to V_5 = 0.85 × 9396.1125 = 7986.70 and calling it '5 years' overshoots, since the value had already dropped below £10000 at V_4. Doubling the percentage decrease to 30% by mistake gives V_1 = 0.7 × 18000 = 12600, then V_2 = 0.7 × 12600 = 8820, which is already below £10000 after only 2 years — the wrong rate crosses the threshold too fast.
- (b) 1.5 km — Multiply the map length by the scale factor: 6 × 25000 = 150000 cm. Convert to kilometres, using 100 cm = 1 m and 1000 m = 1 km, so 100000 cm = 1 km: 150000 ÷ 100000 = 1.5 km. (1500 km comes from converting only as far as metres, 150000 ÷ 100 = 1500 m, and then writing kilometres on the end. 15 km comes from dividing by 10000 instead of 100000. 0.15 km comes from dividing by 1000000 instead of 100000.)
Build your own mix at the worksheet builder.