Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 27 : 64 — For similar solids, the ratio of volumes is the ratio of lengths cubed: 3³ : 4³ = 27 : 64. 3 : 4 comes from using the height ratio itself as the volume ratio, without cubing it at all. 9 : 16 comes from squaring each part instead of cubing (3² : 4²) — squaring is the rule for area, not volume. 27 : 4 comes from cubing only the first part of the ratio (3³ = 27), and leaving the second part uncubed.
- (c) 500 — Pressure = force ÷ area = 250 ÷ 0.5 = 500 pascals. Getting 125 comes from multiplying the force by the area instead of dividing (250 × 0.5 = 125). Getting 249.5 comes from subtracting the area from the force instead of dividing. Getting 50 comes from misreading the area as 5 m² instead of 0.5 m² and dividing 250 by 5.
- (c) a decrease of 25% — Method: use multipliers. An increase of 50% is × 1.5 and a decrease of 50% is × 0.5. Working: 1.5 × 0.5 = 0.75, so the final price is 75% of the original. Answer: a decrease of 25%. The distractors: no change comes from assuming +50% and −50% cancel; a decrease of 50% comes from applying only the second change; an increase of 25% has the direction wrong.
- (a) 2 km — Method: multiply the map distance by the scale to get the real distance in centimetres, then convert centimetres to kilometres using 100 cm = 1 m and 1000 m = 1 km. Working: 4 × 50 000 = 200 000 cm; 200 000 ÷ 100 = 2000 m; 2000 ÷ 1000 = 2. Answer: 2 km. The distractors: 200 km comes from dividing the 200 000 cm by 1000 in a single step, as if a kilometre were 1000 cm rather than the 100 000 cm it is; 20 km comes from converting to metres correctly, 200 000 ÷ 100 = 2000 m, and then dividing those metres by 100 instead of by 1000; 0.2 km comes from dividing by 1000 to reach metres, as if a metre were 1000 cm, and then dividing by 1000 again, so 200 000 is divided by 1 000 000 altogether.
- (d) 25 — Gradient = (60 − 20) ÷ (15 − 5) = 40 ÷ 10 = 4 litres per minute. Since the butt is empty at t = 0, V = 4t. Setting V = 100 gives t = 100 ÷ 4 = 25 minutes.
- (c) 5 hours — Method: measure the job in decorator-hours, which is in the same ratio as the number of rooms, then share the decorator-hours between the decorators available. Working: 5 decorators × 6 hours = 30 decorator-hours for 3 rooms, so one room takes 30 ÷ 3 = 10 decorator-hours; 5 rooms take 5 × 10 = 50 decorator-hours; shared between 10 decorators that is 50 ÷ 10 = 5 hours. Answer: 5 hours. The distractors: 3 hours comes from halving the 6 hours because the number of decorators doubles, while forgetting that there are also more rooms to paint; 10 hours comes from scaling the 6 hours up for the rooms only, 6 × 5 ÷ 3, and leaving the workforce at 5 decorators; 6 hours comes from assuming that doubling the decorators and increasing the rooms cancel each other out, which they do not, because the rooms rise by a factor of 5/3 and the workforce by a factor of 2.
- (b) Day 3 to Day 4 — Method: the average rate of increase between two consecutive days is the difference in the number of orders divided by the number of days between them, which here is just the difference itself, since each gap is one day; comparing all four differences finds which is greatest. Working: the differences are 1,509 − 1,284 = 225 (Day 1 to Day 2), 1,830 − 1,509 = 321 (Day 2 to Day 3), 2,296 − 1,830 = 466 (Day 3 to Day 4), and 2,510 − 2,296 = 214 (Day 4 to Day 5); 466 is the greatest of the four, so the rate of increase was greatest from Day 3 to Day 4. Choosing Day 4 to Day 5 comes from picking the interval that ends on the highest total number of orders, 2,510, confusing the SIZE of the total with the RATE at which it grew. Choosing Day 1 to Day 2 comes from assuming the rate must be greatest at the very start, without working out any of the four differences. Choosing Day 2 to Day 3 comes from comparing only the first two differences, 225 and 321, and stopping there without checking Day 3 to Day 4 or Day 4 to Day 5. Finding the greatest rate of change from a table always means computing every difference between consecutive values and comparing them all — the day with the highest total, or the first pair you check, is not a shortcut.
- (d) 20 litres — The ratio of concentrate to water is 2 : 5, so water = concentrate × 5 ÷ 2. 8 × 5 ÷ 2 = 20, so Priya needs 20 litres of water. Giving 40 litres multiplies by 5 but forgets to divide by 2 (8 × 5 = 40). Giving 3.2 litres uses the ratio inverted, multiplying by 2 ÷ 5 instead of 5 ÷ 2 (8 × 2 ÷ 5 = 3.2). Giving 11 litres uses additive reasoning instead of multiplicative: it adds the difference between the ratio parts, 5 − 2 = 3, onto the amount of concentrate (8 + 3 = 11), but ratios scale by multiplying, not by adding a fixed amount.
- (b) 5 litres — Method: adding water changes the total volume but adds no salt, so work out the volume of salt, then the total volume that makes that salt 20% of the mixture, then the extra water. Working: 30% of 10 litres is 0.3 × 10 = 3 litres of salt. For the same 3 litres to be 20% of the new mixture, the new total volume is 3 ÷ 0.2 = 15 litres. The water added is the extra volume, 15 − 10 = 5 litres. Answer: 5 litres. The distractors: 3 litres is the volume of salt in the solution, which is the first step and not what the question asks for; 15 litres is the total volume of the new mixture, which counts the 10 litres already in the container as water that was poured in; 2 litres comes from taking 20% of the original 10 litres, applying the new percentage to the old volume instead of to the new one.
- (c) £310 — Gradient = (210 − 130) ÷ (7 − 3) = 80 ÷ 4 = 20, so the monthly rate is £20. Using C = 20m + c with the point (3, 130): 130 = 60 + c, so c = 70. After 12 months: C = 20 × 12 + 70 = 240 + 70 = £310.
- (c) 1.25 cm — Method: find the real length using the first map's scale, then use the second map's scale to find its drawn length. Working: real length = 5 × 20 000 = 100 000 cm. On the second map: 100 000 ÷ 80 000 = 1.25 cm. Wrong options: 20 cm comes from inverting the ratio of the two scales (5 × 80 000 ÷ 20 000); 5 cm comes from wrongly assuming the length looks the same on both maps; 12.5 cm comes from dropping a zero from the second scale factor and dividing by 8 000 instead of 80 000 (100 000 ÷ 8 000).
- (b) 25 m/s — Convert km/h to m/s by multiplying by 1000 (km to m) and dividing by 3600 (hours to seconds): 90 × 1000 ÷ 3600 = 25 m/s. Working out 90 ÷ 60 = 1.5 converts using 60, as if going from hours to minutes rather than to seconds. Working out 90 × 3.6 = 324 multiplies by 3.6 instead of dividing by it, going the wrong way between the units. Working out 90 × 1000 = 90000 converts kilometres to metres but forgets to convert hours to seconds at all. The train's speed is 25 m/s.
- (d) 35 — Method: in direct proportion the ratio y : x is the same for every pair, so find the constant and substitute the new value of x. Working: k = 20 ÷ 8 = 2.5, so y = 2.5x; when x = 14, y = 2.5 × 14 = 35. Answer: 35. The distractors: 26 comes from additive thinking — x rises by 6, so 6 is added to y — which would keep the difference constant rather than the ratio; 28 comes from rounding the constant 2.5 down to 2 and working out 2 × 14, which loses the half in the constant; 5.6 comes from using the constant upside down, 8 ÷ 20 = 0.4, and working out 0.4 × 14.
- (b) 20 — The gradient is the change in p divided by the change in t: (90 − 30) ÷ (5 − 2) = 60 ÷ 3 = 20. Choosing 0.05 comes from dividing the change in t by the change in p, the wrong way round (3 ÷ 60). Choosing −20 comes from subtracting the coordinates in the wrong order for one part of the calculation, for example (30 − 90) ÷ (5 − 2), giving a negative value. Choosing 18 comes from dividing the second p-coordinate by the second t-coordinate directly (90 ÷ 5) instead of using the change between the two points.
- (c) 2.5 — x : y = 2 : 5 means that for every matching pair of values, y ÷ x = 5 ÷ 2 = 2.5. So y = 2.5x, and comparing with y = kx gives k = 2.5. Dividing the other way round, 2 ÷ 5 = 0.4, gives x in terms of y — that is the constant for x = 0.4y, not for y = kx. Taking the y-part of the ratio on its own, 5, reads one number off the ratio instead of dividing the y-part by the x-part; 5 would only be right if the x-part were 1. Subtracting the two parts, 5 − 2 = 3, treats the ratio as a difference, but a ratio compares two quantities by multiplication, not by subtraction. The constant is k = 2.5.
Build your own mix at the worksheet builder.