Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 64 — Since y is directly proportional to √x, y = k√x. Using x = 25, y = 20: √25 = 5, so 20 = k × 5, giving k = 20 ÷ 5 = 4. The equation is y = 4√x. When y = 32: √x = 32 ÷ 4 = 8, and x = 8² = 64. Stopping at √x = 8 without squaring leaves the square root of x, not x itself. Treating the relationship as if y were proportional to x itself gives k = 20 ÷ 25 = 0.8 and then x = 32 ÷ 0.8 = 40, which is a different relationship entirely. Multiplying instead of dividing when isolating √x gives √x = 32 × 4 = 128, far too large to be a square root here. When y = 32, x = 64.
- (a) 2 — Since y is inversely proportional to x², y = k/x². Using x = 2, y = 8: 2² = 4, so 8 = k ÷ 4, giving k = 8 × 4 = 32. The equation is y = 32/x². When x = 4: 4² = 16, so y = 32 ÷ 16 = 2. Treating the relationship as inversely proportional to x itself, rather than to x², gives k = 8 × 2 = 16 and then y = 16 ÷ 4 = 4, a different relationship. Using x instead of x² in the new calculation gives y = 32 ÷ 4 = 8, skipping the square. Multiplying by x² instead of dividing by it gives y = 32 × 16 = 512, the wrong operation for an inverse relationship. When x = 4, y = 2.
- (a) 4 hours — This is inverse proportion: more pumps take less time. Multiply the original numbers to find the total pump-hours needed: 2 × 10 = 20 pump-hours. Divide by the new number of pumps: 20 ÷ 5 = 4 hours. Working out 10 × 5 ÷ 2 = 25 hours treats it as direct proportion, as if more pumps needed more time. Stopping at 20 gives the total pump-hours, not the number of hours. Working out 10 − (5 − 2) = 7 hours subtracts the extra number of pumps straight from the number of hours, treating pumps and hours as the same kind of quantity. 5 pumps take 4 hours.
- (d) 7/3 — The ratio cranberry : apple is 3:7, so apple juice is 7 parts and cranberry juice is 3 parts. Write apple over cranberry: 7/3. (3/7 comes from writing the ratio the wrong way round, cranberry over apple. 7/10 comes from comparing the apple juice to the total amount of the mixture, 7 parts out of 10. 3/10 comes from comparing the cranberry juice to the total amount of the mixture, 3 parts out of 10.)
- (d) £4 — The gradient of the tangent gives the instantaneous rate of change of cost with respect to the number of passengers, in pounds per passenger. The tangent passes through (16, 184) and (24, 216), so the change in cost is 216 − 184 = 32 and the change in passengers is 24 − 16 = 8. The gradient is 32 ÷ 8 = 4. Stopping after finding the change in cost, without dividing by the change in passengers, leaves 32, not a rate. Adding the two changes instead of dividing gives 32 + 8 = 40, which is not a rate either. Reading off only the change in passengers, 8, is not a rate at all — a rate needs the change in cost as well. The instantaneous rate is £4 per extra passenger.
- (b) No — rate fell by 3.7 thousand/month — Each tangent gradient is the instantaneous growth rate, in thousand subscribers per month. To compare them, subtract the later rate from the earlier one: 4.8 − 1.1 = 3.7. Since 1.1 is less than 4.8, the growth rate has fallen by 3.7 thousand subscribers per month, so the manager is wrong — the app is growing more slowly at 18 months, not faster. Subtracting the other way round and calling the result a rise, 'rate rose by 3.7 thousand/month', gets the direction backwards: the later gradient is the smaller of the two. Adding the two gradients, 4.8 + 1.1 = 5.9, and calling this a combined rate that shows speeding up, is the wrong operation for comparing two rates. Treating the difference 3.7 as a total number of subscribers lost, rather than a rate in thousands per month, confuses a rate with a count. Always subtract the two rates in a sensible order and keep the units in thousands per month.
- (d) 250 cm³/s — Method: first change litres per minute into cm³ per minute, then change per minute into per second. Working: 15 × 1000 = 15000 cm³ per minute, then 15000 ÷ 60 = 250 cm³ per second. So the tank fills at 250 cm³ per second. Distractor 15000 cm³/s comes from stopping after the first step and forgetting to change minutes into seconds. Distractor 900000 cm³/s comes from multiplying by 60 instead of dividing. Distractor 2500 cm³/s comes from dividing by 6 instead of 60.
- (c) £840 — Method: find the total amount raised using the reverse percentage, then subtract the entry fees to find the donations. Working: £1,260 is 60% of the total, so the total is £1,260 ÷ 0.6, and subtracting the entry fees from this total leaves £840 raised through donations. Answer: £840. £2,100 comes from correctly finding the total amount raised but then forgetting to subtract the entry fees, giving the total instead of the donations alone. £504 comes from working out 40% of the entry fees themselves, £1,260 × 0.4 = £504, instead of first finding the total amount raised. £1,890 comes from treating £1,260 as 40% of the total instead of 60%, dividing by 0.4 to get a total of £3,150, and then subtracting the entry fees from that incorrect total.
- (d) 3/5 — Convert both times to minutes: 2 hours 15 minutes = 135 minutes; 3 hours 45 minutes = 225 minutes. Put the train time over the bus time: 135/225. Divide both numbers by their highest common factor, 45: 135÷45 = 3, 225÷45 = 5, giving 3/5. (5/3 comes from writing the times the wrong way round. 2/5 comes from finding the difference, 225 − 135 = 90 minutes, and writing it as a fraction of the bus time, 90/225. 3/8 comes from comparing the train time to the total time for both journeys, 135/360.)
- (a) 2.17 litres per minute — There are 60 minutes in an hour, so to convert litres per hour to litres per minute you divide by 60: 130 ÷ 60 = 2.1666..., which rounds to 2.17 litres per minute. Multiplying by 60 instead of dividing gives 130 × 60 = 7800.00 litres per minute, using the conversion factor the wrong way round. Leaving the rate unchanged, 130.00, ignores that 'per hour' and 'per minute' are different units. Dividing by 50 instead of 60, misremembering the number of minutes in an hour, gives 130 ÷ 50 = 2.60 litres per minute.
- (c) £672 — Simple interest per year = 3% of £600 = £18. Over 4 years the interest is 18 × 4 = £72. Total in the account = £600 + £72 = £672. A student who gives just the interest, without adding it to the principal, writes £72. A student who adds only one year's interest instead of four gets £600 + £18 = £618. A student who wrongly compounds the interest each year gets 600 × 1.03⁴ = £675.31.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (c) 2 : 5 — The point (4, 10) gives x = 4, y = 10, so x : y = 4 : 10. Dividing both parts by their highest common factor, 2, gives 2 : 5 in simplest form. Inverting the whole ratio gives 5 : 2, which is y : x instead of x : y. Dividing only the x-part by 2 and leaving the y-part as 10 gives 2 : 10, but scaling one part on its own changes the ratio: 2 : 10 is the same as 1 : 5, not 4 : 10. Dividing only the y-part by 2 and leaving the x-part as 4 gives 4 : 5, the same one-sided mistake made on the other part of the ratio.
- (a) It's an average over 20 days, which may miss the day-5 rate. — Method: a chord's gradient is the AVERAGE rate of change across the whole interval it spans; it only closely approximates the INSTANTANEOUS rate of change at a point inside that interval when the rate of change is roughly constant across the interval, which usually means the interval needs to be short. Working: here the chord spans 20 days while the point of interest, t = 5, is only a quarter of the way along it, so if the reservoir's level rose or fell at different rates over that time, the chord's gradient will not be close to the true gradient of the curve at t = 5 — this is the correct reason. Claiming the chord's gradient needs the water level at every day in between is wrong: a chord's gradient needs only the two endpoint values, at t = 0 and t = 20. Claiming a chord can only estimate the rate at its own endpoints is wrong: a chord between two points can be used to estimate the instantaneous rate of change at any point inside the interval, including one that is not an endpoint — that is exactly the technique being used here, and it is the SIZE of the interval that makes the estimate poor, not the fact that t = 5 is an interior point. Claiming the units do not match is wrong: the chord's gradient and the instantaneous rate of change are both measured in metres per day, so the units are the same. A chord is only a good estimate of an instantaneous rate when the interval it spans is short enough that the rate does not change much within it — always check how long the interval is compared with how far it is to the point you actually want.
- (a) 4/5 — Method: find the June takings first, then write them over the May takings and cancel. Working: the takings fell by £900, so June is £4500 − £900 = £3600; the fraction is 3600/4500, and dividing the numerator and the denominator by 900 gives 4/5. Answer: 4/5 of the May takings. The distractors: 1/5 comes from writing the fall over the May takings, 900/4500, which answers how far the takings dropped rather than what June's takings are compared with May's; 5/4 comes from writing May over June, 4500/3600, reversing the order the question asks for; 4/9 comes from writing June over the two months added together, 3600/8100, a part-to-whole fraction when the comparison asked for is with May alone.
Build your own mix at the worksheet builder.