- (a) 18/25 — First find the new number of rose bushes: 90 × 1.2 = 108 (a 20% increase multiplies by 1.2). Then write 108 over 150 and divide top and bottom by 6 to get 18/25. Choosing 3/5 comes from using the original 90 rose bushes without applying the 20% increase (90/150 = 3/5). Choosing 25/18 comes from writing the number of lavender bushes over the new number of rose bushes, the wrong way round. Choosing 3/25 comes from multiplying 90 by 0.2 instead of 1.2, finding only the increase (18) rather than the new total, then writing 18/150 = 3/25.
- (b) 16 — Method: substitute x into each equation separately, then subtract the smaller value from the larger. Working: y = 3 × 4 = 12 and z = 7 × 4 = 28, so the difference is 28 − 12 = 16. Answer: 16. The distractors: 4 comes from subtracting the constants, 7 − 3, which is the difference between the two gradients rather than the difference between the values at x = 4; 40 comes from adding the two values, 12 + 28, instead of subtracting them; 28 is the value of z on its own, given instead of being compared with the value of y.
- (a) 1.5 km — Multiply the map length by the scale: 6 × 25 000 = 150 000 cm. Convert to kilometres: 150 000 cm = 1.5 km. Dividing by only 1000 instead of the full conversion when changing units gives 150 km, a hundred times too large. Misreading the scale as 1 : 2500 instead of 1 : 25 000 gives 6 × 2500 = 15 000 cm = 0.15 km, a hundred times too small. Leaving the answer as 150 000 without converting units at all, and calling it 150 000 km, mistakes centimetres for kilometres completely.
- (c) 183 mg — Apply the decay, then add the new dose, once for each hour. Hour 1: 0.7 × 200 = 140, then 140 + 50 = 190. Hour 2: 0.7 × 190 = 133, then 133 + 50 = 183, so there is 183 mg after 2 hours. Forgetting the top-up dose and only applying the decay gives 0.7 × 200 = 140, then 0.7 × 140 = 98 — this ignores that a further 50 mg is given every hour. Adding the 50 mg BEFORE the decay is applied, instead of after, gives 0.7 × (200 + 50) = 175, then 0.7 × (175 + 50) = 157.5, which changes how much of the dose is eliminated in the same hour it is given. Multiplying by 0.3, the percentage ELIMINATED, instead of by 0.7, the percentage REMAINING, gives 0.3 × 200 + 50 = 110, then 0.3 × 110 + 50 = 83 — this mixes up the amount that leaves the bloodstream with the amount that stays in it. Always check whether a percentage describes what remains or what is removed before choosing the multiplier.
- (c) £478.40 — Method: apply the percentage increase, then apply the percentage decrease to the new price. Working: after the increase, the laptop costs £520 × 1.15. Multiplying this result by 0.80 gives the final price, £478.40. Answer: £478.40. £494 comes from combining the two percentages into a single net change (15% − 20% = −5%) and applying it directly, £520 × 0.95 = £494, instead of applying the two changes one after the other. £416 comes from applying only the 20% decrease to the original price, £520 × 0.80 = £416, forgetting the increase entirely. £598 comes from applying only the 15% increase and stopping there, forgetting to apply the decrease at all.
- (a) 12 m² — Real length = 8 × 50 = 400 cm = 4 m. Real width = 6 × 50 = 300 cm = 3 m. Real area = 4 × 3 = 12 m². Scaling the plan area (8 × 6 = 48 cm²) by 50 instead of by 50 squared gives 48 × 50 = 2400 cm² = 0.24 m² — area scales by the square of the length scale factor, not the scale factor itself. Multiplying the real dimensions in centimetres, 400 × 300 = 120 000, and calling the result 120 000 m² mistakes square centimetres for square metres. Converting only the length to metres and leaving the width as 6 (treating centimetres as metres), 4 × 6 = 24, gives 24 m², from a scaling that was never finished.
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (b) 5 years — The recurrence P_{n+1} = 1.1P_n − 30 must be applied once per year, checking after each application whether the population has passed 460. Starting from P_0 = 400: 400 × 1.1 − 30 = 410, so P_1 = 410. Then 410 × 1.1 − 30 = 421, so P_2 = 421. Then 421 × 1.1 − 30 = 433.1, so P_3 = 433.1. Then 433.1 × 1.1 − 30 = 446.41, so P_4 = 446.41, which is still below 460. Then 446.41 × 1.1 − 30 = 461.051, so P_5 = 461.051, the first value above 460. The population first exceeds 460 after 5 complete years. Stopping at P_4 = 446.41 and reporting 4 years reports the last year the population was still below 460, not the first year it was above. Counting the starting value P_0 = 400 as a year of growth makes P_5 the sixth number in the list and gives 6 years, but P_0 is the population before any year has passed, so P_5 is reached after 5 years, not 6. Reading "exceed 460" as "exceed the starting population of 400" instead gives P_1 = 410, already above 400, and 1 year — but the threshold named in the question is 460, not the starting value, so always check every value against the number actually stated in the question.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (a) 4:3 — Multiply both parts by the lowest common denominator, 6: (2/3) × 6 = 4 and (1/2) × 6 = 3, giving the ratio 4 : 3, which is already in simplest form.
- (d) 7/3 — The ratio cranberry : apple is 3:7, so apple juice is 7 parts and cranberry juice is 3 parts. Write apple over cranberry: 7/3. (3/7 comes from writing the ratio the wrong way round, cranberry over apple. 7/10 comes from comparing the apple juice to the total amount of the mixture, 7 parts out of 10. 3/10 comes from comparing the cranberry juice to the total amount of the mixture, 3 parts out of 10.)
- (d) 90 cm — Method: scale each dimension by the scale factor, then find the perimeter. Working: model height = 240 ÷ 8 = 30 cm; model width = 120 ÷ 8 = 15 cm. Perimeter = 2 × (30 + 15) = 90 cm. Wrong options: 11.25 cm comes from squaring the scale factor as if finding an area (720 ÷ 64); 510 cm comes from scaling only one dimension and leaving the other at full size; 720 cm comes from finding the real perimeter (2 × (240 + 120)) but forgetting to scale it down at all.
- (a) 1.3 — The gradient of a distance-time graph gives the speed. Difference in speed = 4.5 − 3.2 = 1.3 km/h. A student who subtracts the speeds the wrong way round, 3.2 − 4.5, gets −1.3. A student who adds the two speeds instead of comparing them gets 7.7. A student who multiplies the two gradients gets 14.4.
- (a) 36 — Pressure = force ÷ area, so 126 ÷ 3.5 = 36 N/m². (0.03 comes from dividing the area by the force instead of the force by the area, the wrong way round. 129.5 comes from adding 126 and 3.5 instead of dividing. 441 comes from multiplying 126 by 3.5 instead of dividing.)
- (a) No — the cost per metre differs: £2.50/m vs £2.20/m — Method: divide cost by length for each pair and compare the unit rates. Working: £7.50 ÷ 3 = £2.50 per m; £11.00 ÷ 5 = £2.20 per m. The rates are different, so this is NOT direct proportion. Wrong options: 'Yes — both amounts increase' wrongly assumes any increasing relationship is proportional; 'No — because 5 m costs more in total' judges by total cost rather than the rate per metre, which is not valid reasoning on its own; 'Yes — the cost per metre is £2.50 in both cases' miscalculates the second rate (11.00 ÷ 5 is £2.20, not £2.50).