- (a) 1.3 — The gradient of a distance-time graph gives the speed. Difference in speed = 4.5 − 3.2 = 1.3 km/h. A student who subtracts the speeds the wrong way round, 3.2 − 4.5, gets −1.3. A student who adds the two speeds instead of comparing them gets 7.7. A student who multiplies the two gradients gets 14.4.
- (c) 45% — Method: adding water changes the total volume but not the amount of fruit juice, so find the juice, find the new total volume, and write the first as a percentage of the second. Working: 3 × 0.6 = 1.8 litres of fruit juice; the new volume is 3 + 1 = 4 litres; 1.8 ÷ 4 = 0.45, which is 45%. Answer: 45%. The distractors: 60% is the strength before the water goes in, and assumes that adding water leaves the strength unchanged; 15% comes from dividing the 60% by the 4 litres of mixture instead of dividing the 1.8 litres of juice by the 4 litres; 75% is the fraction of the new mixture that came out of the original jug, 3 litres out of 4, which ignores that only 60% of that 3 litres was juice.
- (a) £85.47 — Value after 2 years: £1200 × 1.035 × 1.035 = £1285.47 (nearest penny). Interest earned = £1285.47 − £1200 = £85.47. £1285.47 is the total value of the account, not the interest earned on top of the original £1200. £84.00 comes from using simple interest instead of compound interest: £1200 × 0.035 × 2 = £84.00. £42.00 comes from working out only the first year's interest and stopping there: £1200 × 0.035 = £42.00.
- (c) a decrease of 25% — Method: use multipliers. An increase of 50% is × 1.5 and a decrease of 50% is × 0.5. Working: 1.5 × 0.5 = 0.75, so the final price is 75% of the original. Answer: a decrease of 25%. The distractors: no change comes from assuming +50% and −50% cancel; a decrease of 50% comes from applying only the second change; an increase of 25% has the direction wrong.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (c) 32 km/h — Method: to change mph into km/h, multiply by the number of kilometres in a mile. Working: 20 × 1.6 = 32 km/h. So the cyclist's speed is 32 km/h. Distractor 12.5 km/h comes from dividing by 1.6 instead of multiplying. Distractor 21.6 km/h comes from adding 1.6 instead of multiplying by it. Distractor 20 km/h comes from not converting the units at all.
- (a) S_{n+1} = 1.04S_n − 30 — Adding 4% interest multiplies the balance by 1 + 0.04 = 1.04. Withdrawing £30 afterwards subtracts a fixed 30, giving S_{n+1} = 1.04S_n − 30. Writing +30 instead of −30 mistakes a withdrawal for a deposit — the £30 leaves the account, so it must be subtracted. Writing 0.96 instead of 1.04 treats the 4% as a decrease rather than an increase, as if the interest were shrinking the balance instead of growing it. Writing 1.4 instead of 1.04 turns 4% into 40%, a common slip when converting a percentage to a multiplier — 4% as a decimal is 0.04, so the multiplier is 1.04, not 1.4. Always convert the percentage to a decimal first, then add 1 for growth or subtract from 1 for decay, before applying any fixed amount that is added or removed.
- (d) £82.50 — Find the hourly rate: £52.50 ÷ 7 = £7.50 per hour. For 11 hours: 11 × £7.50 = £82.50. £30 comes from working out the pay for only the extra 4 hours (4 × £7.50), and forgetting to include the original £52.50. £99 comes from misremembering the hourly rate as £9 instead of £7.50, then 11 × £9. £56.50 comes from adding the extra number of hours (4) straight onto the pay in pounds (52.5 + 4), confusing hours with pounds.
- (b) 120 minutes — Method: find the rate in bottles per minute, then divide the order size by the rate. Working: rate = 810 ÷ 45 = 18 bottles per minute. Time = 2,160 ÷ 18 = 120 minutes. Wrong options: 1,350 minutes comes from subtracting 810 from 2,160 instead of using the rate; 48 minutes comes from dividing the order size by the original time (2,160 ÷ 45) instead of the rate; 108 minutes comes from rounding the rate to 20 bottles per minute before dividing.
- (c) £478.40 — Method: apply the percentage increase, then apply the percentage decrease to the new price. Working: after the increase, the laptop costs £520 × 1.15. Multiplying this result by 0.80 gives the final price, £478.40. Answer: £478.40. £494 comes from combining the two percentages into a single net change (15% − 20% = −5%) and applying it directly, £520 × 0.95 = £494, instead of applying the two changes one after the other. £416 comes from applying only the 20% decrease to the original price, £520 × 0.80 = £416, forgetting the increase entirely. £598 comes from applying only the 15% increase and stopping there, forgetting to apply the decrease at all.
- (a) 10 — Since y is directly proportional to x², y = kx². Using x = 4, y = 32: 32 = k × 16, so k = 32 ÷ 16 = 2. The equation is y = 2x². When y = 200: x² = 200 ÷ 2 = 100, so x = 10, taking the positive root because the question states that x is positive. Stopping at x² = 100 without taking the square root leaves 100, not the value of x itself. Treating the relationship as if y were proportional to x itself gives k = 32 ÷ 4 = 8 and then x = 200 ÷ 8 = 25, which is a different relationship entirely. Multiplying by k instead of dividing when rearranging gives x² = 200 × 2 = 400 and x = 20, which is not this equation rearranged correctly. The value of x when y = 200 is 10.
- (a) 70 km/h — Method: average speed for a whole journey is the total distance divided by the total time, not the mean of the separate speeds. Working: 3 × 80 = 240 km and 1 × 40 = 40 km, giving 280 km in 3 + 1 = 4 hours, so 280 ÷ 4 = 70. Answer: 70 km/h. The distractors: 60 km/h comes from taking the mean of 80 and 40, which would only be right if equal times were spent at each speed; 280 km/h is the total distance written with a speed unit, from forgetting to divide by the total time; 80 km/h comes from quoting the speed of the longer leg as the average for the whole journey.
- (c) 20% — Method: percentage increase = (increase ÷ original) × 100. Working: the increase is 54 − 45 = 9, and 9 ÷ 45 = 0.2, so the percentage increase is 0.2 × 100 = 20. Answer: 20%. The distractors: 9% comes from writing the actual increase as a percentage; 16.7% comes from dividing by the new value 54 instead of the original 45; 120% is the multiplier 1.2 written as a change rather than the change itself.
- (c) 3 : 5 — If orange juice is 3/8 of the total, apple juice is the remaining 1 − 3/8 = 5/8. The ratio of orange to apple is therefore 3 : 5. Inverting gives 5 : 3, apple to orange instead of orange to apple. Using the denominator 8 as the second part of the ratio, 3 : 8, compares orange juice to the whole drink rather than to the apple juice alone. Pairing the total 8 with the apple fraction's numerator 5 gives 8 : 5, which mixes a whole-total figure with a part figure.
- (a) No — the cost per metre differs: £2.50/m vs £2.20/m — Method: divide cost by length for each pair and compare the unit rates. Working: £7.50 ÷ 3 = £2.50 per m; £11.00 ÷ 5 = £2.20 per m. The rates are different, so this is NOT direct proportion. Wrong options: 'Yes — both amounts increase' wrongly assumes any increasing relationship is proportional; 'No — because 5 m costs more in total' judges by total cost rather than the rate per metre, which is not valid reasoning on its own; 'Yes — the cost per metre is £2.50 in both cases' miscalculates the second rate (11.00 ÷ 5 is £2.20, not £2.50).