Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 64 — Since y is directly proportional to √x, y = k√x. Using x = 25, y = 20: √25 = 5, so 20 = k × 5, giving k = 20 ÷ 5 = 4. The equation is y = 4√x. When y = 32: √x = 32 ÷ 4 = 8, and x = 8² = 64. Stopping at √x = 8 without squaring leaves the square root of x, not x itself. Treating the relationship as if y were proportional to x itself gives k = 20 ÷ 25 = 0.8 and then x = 32 ÷ 0.8 = 40, which is a different relationship entirely. Multiplying instead of dividing when isolating √x gives √x = 32 × 4 = 128, far too large to be a square root here. When y = 32, x = 64.
- (b) 20 — The gradient is the change in p divided by the change in t: (90 − 30) ÷ (5 − 2) = 60 ÷ 3 = 20. Choosing 0.05 comes from dividing the change in t by the change in p, the wrong way round (3 ÷ 60). Choosing −20 comes from subtracting the coordinates in the wrong order for one part of the calculation, for example (30 − 90) ÷ (5 − 2), giving a negative value. Choosing 18 comes from dividing the second p-coordinate by the second t-coordinate directly (90 ÷ 5) instead of using the change between the two points.
- (d) 4:5 — Write the ratio pounds : dollars as 1 : 1.25. Multiply both parts by 4 to clear the decimal: 1 × 4 = 4 and 1.25 × 4 = 5, giving 4 : 5. (5:4 comes from writing the ratio the wrong way round, dollars to pounds. 1:1 comes from rounding 1.25 dollars down to the nearest whole dollar. 1:5 comes from multiplying only the dollars by 4 to clear the decimal and leaving the pounds as 1 — both parts of a ratio must be multiplied by the same number.)
- (b) 1500 m — Method: multiply the map length by the scale to get the real length in centimetres, then divide by 100 to change centimetres into metres. Working: 3 × 50 000 = 150 000 cm, and 150 000 ÷ 100 = 1500. Answer: 1500 m. The distractors: 15000 m comes from dividing the 150 000 cm by 10 instead of 100; 150 m comes from dividing by 1000, the conversion for kilometres; 50000 m comes from writing the scale itself as the answer and ignoring the 3 cm measured on the map.
- (c) 6.00 m — Method: the ratio of height to shadow length is the same for both objects. Working: road sign height ÷ shadow = 3 ÷ 5 = 0.6. Lamppost height = 0.6 × 10 = 6.00 m. Wrong options: 16.67 m comes from inverting the ratio, using shadow ÷ height instead of height ÷ shadow (10 × 5 ÷ 3); 8.00 m comes from adding the difference between the two shadow lengths to the road sign's height instead of scaling (3 + (10 − 5)); 1.50 m comes from multiplying by the ratio of the two shadow lengths the wrong way round (3 × 5 ÷ 10).
- (a) 20% — Method: percentage increase = increase ÷ original amount × 100. Working: the increase is 84 − 70 = 14 marks, and 14 ÷ 70 = 0.2, so 0.2 × 100 = 20. Answer: an increase of 20%. The distractors: 14% comes from quoting the 14 mark increase as though marks and per cent were the same thing; 17% comes from dividing the 14 by the new mean 84 instead of by the original 70, which gives 17% to the nearest per cent; 120% is the new mean written as a percentage of the old one, which is the whole of the new mean rather than the increase.
- (c) 14 litres — Method: find the amount of fuel used per km first, then use it to find the fuel needed for 175 km. Working: 24 ÷ 300 = 0.08 litres per km, and 0.08 × 175 = 14 litres. So 14 litres are needed. Distractor 24 litres comes from assuming the same amount of fuel is used no matter the distance, without scaling. Distractor 21 litres comes from misreading the original distance as 200 km instead of 300 km. Distractor 1.4 litres comes from a decimal-point slip, giving an answer ten times too small.
- (a) 2 — Since y is inversely proportional to x², y = k/x². Using x = 2, y = 8: 2² = 4, so 8 = k ÷ 4, giving k = 8 × 4 = 32. The equation is y = 32/x². When x = 4: 4² = 16, so y = 32 ÷ 16 = 2. Treating the relationship as inversely proportional to x itself, rather than to x², gives k = 8 × 2 = 16 and then y = 16 ÷ 4 = 4, a different relationship. Using x instead of x² in the new calculation gives y = 32 ÷ 4 = 8, skipping the square. Multiplying by x² instead of dividing by it gives y = 32 × 16 = 512, the wrong operation for an inverse relationship. When x = 4, y = 2.
- (d) 4.7 km — Multiply the map length by the scale factor: 9.4 × 50 000 = 470 000 cm. Convert to kilometres: 470 000 cm = 4700 m = 4.7 km. Converting only to metres and calling the answer 4700 kilometres mistakes metres for kilometres. Misreading the scale as 1 : 5000 instead of 1 : 50 000, 9.4 × 5000 = 47 000 cm = 0.47 km, is ten times too small. Misplacing the decimal point in 9.4 and effectively using 94, 94 × 50 000 = 4 700 000 cm = 47 km, is ten times too big.
- (a) Inverse proportion — A curve that decreases and never touches either axis is the standard shape for inverse proportion, y = k/x. Direct proportion graphs are straight lines through the origin, which this is not, so it must be inverse proportion rather than neither.
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
- (a) 35/32 — Work out each weekly total first. Last week: 5 × 7 = 35 hours. This week: 4 × 8 = 32 hours. Last week's total is being written as a fraction of this week's total, so last week goes on the top and this week goes on the bottom, giving 35/32. The two totals share no common factor, so the fraction cannot be cancelled. It is greater than 1, which says that Priya worked more hours last week than this week.
- (d) Faster at t = 8s — still accelerating — The gradient of a tangent on a distance-time graph is the instantaneous speed, in m/s. At t = 2 seconds the speed is 6 m/s; at t = 8 seconds it is 9.5 m/s, which is faster, so the sprinter is still accelerating between these two times. Saying the sprinter is slower at t = 8s reverses the comparison — 9.5 is greater than 6, not less. Writing 9.5 − 6 = 3.5 and calling this 'metres further covered' turns the difference of two speeds into a distance, which the units do not support: a difference of two speeds is itself a speed, not a distance. Taking 9.5 m/s, the larger of the two instantaneous speeds, as the average speed for the whole race confuses a speed at one instant with an average over the whole distance, which would need the total distance and total time, not two tangent gradients.
- (c) 10,800 kg — Method: since the model and the real container are similar and made of the same material, mass scales with volume, so the mass scale factor is the length scale factor cubed. Working: 30³ = 27,000, so the real container's mass is 400 × 27,000 = 10,800,000 g, which is 10,800,000 ÷ 1,000 = 10,800 kg. Answer: 10,800 kg. 12 kg comes from using the length scale factor directly, 400 × 30 = 12,000 g, without cubing it. 360 kg comes from squaring the length scale factor instead of cubing it, 400 × 30² = 360,000 g. 10,800,000 kg comes from correctly cubing the scale factor but then forgetting to convert the mass from grams into kilograms.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.