Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) £60 — £48 represents 100% − 20% = 80% of the original price. 1% = £48 ÷ 80 = £0.60, so 100% = £0.60 × 100 = £60.
- (a) 28.8 km/h — Method: first change metres per second into metres per hour, then change metres into kilometres. Working: 8 × 3600 = 28800 metres per hour, then 28800 ÷ 1000 = 28.8 km/h. So the runner's speed is 28.8 km/h. Distractor 28800 km/h comes from stopping after the first step and forgetting to change metres into kilometres. Distractor 2.22 km/h comes from dividing by 3600 instead of multiplying, then multiplying by 1000. Distractor 2.88 km/h comes from using 360 instead of 3600 seconds in an hour, missing a zero.
- (c) 4 : 5 — Method: a formula of the form y = kx says that for every 1 of x there are k of y, so the ratio y : x is k : 1, which is then written with whole numbers and cancelled. Working: here k = 0.8, so y : x = 0.8 : 1; multiplying both parts by 10 gives 8 : 10, and dividing both parts by their highest common factor 2 gives 4 : 5. Answer: 4 : 5. The distractors: 5 : 4 comes from writing x : y, reversing the order asked for; 8 : 10 has the decimal cleared but the ratio left unsimplified, and the question asks for the simplest form; 8 : 1 comes from multiplying only the left-hand part by 10 and leaving the 1 unchanged, which changes the relationship instead of keeping it.
- (a) It's an average over 20 days, which may miss the day-5 rate. — Method: a chord's gradient is the AVERAGE rate of change across the whole interval it spans; it only closely approximates the INSTANTANEOUS rate of change at a point inside that interval when the rate of change is roughly constant across the interval, which usually means the interval needs to be short. Working: here the chord spans 20 days while the point of interest, t = 5, is only a quarter of the way along it, so if the reservoir's level rose or fell at different rates over that time, the chord's gradient will not be close to the true gradient of the curve at t = 5 — this is the correct reason. Claiming the chord's gradient needs the water level at every day in between is wrong: a chord's gradient needs only the two endpoint values, at t = 0 and t = 20. Claiming a chord can only estimate the rate at its own endpoints is wrong: a chord between two points can be used to estimate the instantaneous rate of change at any point inside the interval, including one that is not an endpoint — that is exactly the technique being used here, and it is the SIZE of the interval that makes the estimate poor, not the fact that t = 5 is an interior point. Claiming the units do not match is wrong: the chord's gradient and the instantaneous rate of change are both measured in metres per day, so the units are the same. A chord is only a good estimate of an instantaneous rate when the interval it spans is short enough that the rate does not change much within it — always check how long the interval is compared with how far it is to the point you actually want.
- (b) 62.5% — Total parts = 5 + 3 = 8. Apples make up 5 parts, so the percentage is 5/8 × 100 = 62.5%. A student who finds the oranges' share instead gets 3/8 × 100 = 37.5%. A student who assumes an even split gets 50%. A student who inverts the fraction gets 8/5 × 100 = 160%.
- (a) 8 cm — Method: a scale of 1 : n means the real distance is n times the distance on the map, so to go from the real distance back to the map distance, put both lengths in the same unit and then divide by the scale. Working: 1 km = 100 000 cm, so 8 km = 8 × 100 000 = 800 000 cm; 800 000 ÷ 100 000 = 8. Answer: 8 cm. The distractors: 800000 cm comes from converting the 8 km into centimetres and stopping there, so the division by the scale — the inverse operation the question asks for — is never done; 80 cm comes from taking a metre to be 1000 cm, which turns 8 km into 8 × 1000 × 1000 = 8 000 000 cm and gives 8 000 000 ÷ 100 000 = 80; 0.08 cm comes from taking a kilometre to be 1000 cm, which turns 8 km into 8000 cm and gives 8000 ÷ 100 000 = 0.08.
- (a) 46.8 km/h — Method: 1 hour = 60 minutes, so a rate given in kilometres per minute is converted to kilometres per hour by multiplying by 60. Working: 0.78 × 60 = 46.8, so the instantaneous rate of change is 46.8 kilometres per hour. Keeping the given value unchanged and only relabelling the unit gives 0.78 km/h, which ignores that the time unit has changed. Dividing by 60 instead of multiplying — as you would when converting to a larger length unit — gives 0.78 ÷ 60 = 0.013 km/h, the wrong direction for a rate measured against a larger time unit. Adding 60 to the given rate instead of multiplying by it gives 0.78 + 60 = 60.78 km/h. Converting a rate always means multiplying or dividing by the conversion factor between the units, never adding it, and the direction depends on whether the new time unit is bigger or smaller than the old one.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (d) 1.5 — Method: the length scale factor is the square root of the area scale factor, not the area scale factor itself. Working: the area scale factor is 45 ÷ 20 = 2.25, and the square root of 2.25 is 1.5. Answer: 1.5. Nadia's answer, 2.25, is the AREA scale factor — she never took the square root to get back to the length scale factor. 4.5 comes from doubling the area scale factor instead of taking its square root. 0.67 comes from taking the square root in the wrong direction, finding the scale factor from the larger rug to the smaller rug instead of the other way round.
- (a) 20 people/year — The gradient of a tangent to a graph at a point equals the instantaneous rate of change of the quantity there. A straight line's gradient is the change in the vertical value divided by the change in the horizontal value between two points on it. Here the tangent passes through (2, 180) and (6, 260), so the change in population is 260 − 180 = 80 and the change in time is 6 − 2 = 4. The gradient is 80 ÷ 4 = 20. Reporting the change in population, 80, on its own is not a rate, because that growth happened over 4 years and has not been divided by them. Adding the two changes instead of dividing gives 80 + 4 = 84, which is not a rate. Subtracting the coordinates in the wrong order, (180 − 260) ÷ (6 − 2), gives −80 ÷ 4 = −20, the wrong sign. The instantaneous rate of change of the population at t = 4 is 20 people per year.
- (b) 1:12 — C = 12n means that for every 1 pen there are 12 pence of cost, so n : C = 1 : 12, and the highest common factor of 1 and 12 is 1, so this is already in its simplest form. Writing C : n instead of n : C gives 12 : 1, the ratio the wrong way round. Reading C = 12n as '12 more than n' instead of '12 times n', so n = 1 gives C = 13, gives 1 : 13, from adding instead of multiplying. Choosing n = 12, so C = 12 × 12 = 144, gives the correct pair of values n : C = 12 : 144, but the ratio the right way round left unsimplified — 12 and 144 share a common factor of 12, which has not been cancelled.
- (a) 1 : 2 000 000 — Method: a scale is a ratio between two lengths written in the same unit, reduced so that the map distance is 1. Working: 120 km = 120 × 1000 × 100 = 12 000 000 cm, so the ratio is 6 : 12 000 000, and dividing both parts by 6 gives 1 : 2 000 000. Answer: 1 : 2 000 000. The distractors: 1 : 12 000 000 comes from writing the real length in centimetres without dividing by the 6 cm on the map; 1 : 200 000 comes from taking 120 km as 1 200 000 cm, one conversion step short, before dividing by 6; 1 : 20 000 comes from converting 120 km to 120 000 m and treating those metres as centimetres.
- (a) £14224 — Value after 2 years: £15000 × 1.04 × 1.04 = £16224. Money left after buying the trailer: £16224 − £2000 = £14224. £14200 comes from treating the two 4% increases as a single flat 8% increase applied once instead of compounding: £15000 × 1.08 = £16200, and £16200 − £2000 = £14200. £13600 comes from applying the 4% increase only once, for 1 year instead of 2: £15000 × 1.04 = £15600, and £15600 − £2000 = £13600. £18224 comes from adding the £2000 instead of subtracting it: £16224 + £2000 = £18224.
- (a) 4 : 15 — Convert to the same unit first: 1.5 kg = 1500 g, since 1 kg = 1000 g. This gives the ratio 400 : 1500. Divide both parts by their highest common factor, 100, to get 4 : 15. Giving 40 : 150 divides by 10 only, which is not the highest common factor, so it is not fully simplified. Giving 15 : 4 swaps the order. Giving 4 : 1.5 has not converted 1.5 kg into grams, so the two parts are not measured in the same unit.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
Build your own mix at the worksheet builder.