Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (d) 3 : 2 : 5 — The highest common factor of 45, 30 and 75 is 15. Divide each part by 15: 45 ÷ 15 = 3, 30 ÷ 15 = 2 and 75 ÷ 15 = 5, giving 3 : 2 : 5. Giving 9 : 6 : 15 divides by 5, a common factor but not the highest one. Giving 15 : 10 : 25 divides by 3 only, even further from simplest form. Giving 2 : 3 : 5 has the first two parts swapped.
- (c) Height rising at 2 m/s at t = 1.5 s — A tangent's gradient on a height-time graph is the instantaneous rate of change of height, in metres per second, so gradient 2 means the ball's height is increasing at 2 m/s at t = 1.5 s. Saying the height 'is 2 m' confuses the gradient, a rate, with the y-value on the graph, which is the ball's height itself. Saying the ball 'travelled 2 m from t = 1 to t = 2' treats the instantaneous gradient at one instant as if it were the total distance risen over a whole one-second interval, which is a different quantity found from two height readings, not from one tangent. Saying the speed 'is 2 m/s²' uses the wrong units — m/s² measures acceleration, the rate of change of speed, not speed itself. Always check that the units quoted match what a height-time graph's gradient can actually give you: metres per second.
- (a) 4 hours — This is inverse proportion: more pumps take less time. Multiply the original numbers to find the total pump-hours needed: 2 × 10 = 20 pump-hours. Divide by the new number of pumps: 20 ÷ 5 = 4 hours. Working out 10 × 5 ÷ 2 = 25 hours treats it as direct proportion, as if more pumps needed more time. Stopping at 20 gives the total pump-hours, not the number of hours. Working out 10 − (5 − 2) = 7 hours subtracts the extra number of pumps straight from the number of hours, treating pumps and hours as the same kind of quantity. 5 pumps take 4 hours.
- (c) 150% — Percentage = (180,000 ÷ 120,000) × 100 = 150%.
- (a) 6 — Method: for inverse proportion the product xy is the same for every pair, so find that product and use it to work back to the missing value. Working: xy = 2 × 15 = 30, so when x = 5 the equation 5y = 30 gives y = 30 ÷ 5 = 6. Answer: 6. The distractors: 37.5 comes from treating the pair as direct proportion and scaling y up with x, 15 × 5 ÷ 2, although in inverse proportion y falls as x rises; 30 is the constant product itself, given as a value of y rather than used to find one; 12 comes from additive thinking — x rises by 3, so 3 is taken off y — which would make the two quantities differ by a constant instead of multiplying to one.
- (a) No — the cost per metre differs: £2.50/m vs £2.20/m — Method: divide cost by length for each pair and compare the unit rates. Working: £7.50 ÷ 3 = £2.50 per m; £11.00 ÷ 5 = £2.20 per m. The rates are different, so this is NOT direct proportion. Wrong options: 'Yes — both amounts increase' wrongly assumes any increasing relationship is proportional; 'No — because 5 m costs more in total' judges by total cost rather than the rate per metre, which is not valid reasoning on its own; 'Yes — the cost per metre is £2.50 in both cases' miscalculates the second rate (11.00 ÷ 5 is £2.20, not £2.50).
- (b) 0.22 km — The real one-way distance is 4.4 × 2500 = 11000 cm. Converting units: 11000 ÷ 100 = 110 m, and 110 ÷ 1000 = 0.11 km. Since the jogger runs there and back, the total distance is 0.11 × 2 = 0.22 km. 0.11 km comes from working out only the one-way distance and forgetting the return journey. 220 km comes from correctly doubling the one-way distance in metres, 110 × 2 = 220, but leaving it mislabelled as kilometres instead of converting metres to kilometres. 110 km comes from working out only the one-way distance in metres, 110, and mislabelling it as kilometres.
- (a) 20 cm — Method: match the measurement you are given to its own part of the ratio, use it to find the value of one part, then multiply by the parts belonging to the measurement asked for. Working: the length is the second measurement listed, so it matches 4 parts and one part = 16 ÷ 4 = 4 cm; the height is 5 parts, so 5 × 4 = 20. Answer: 20 cm. The distractors: 12 cm is the width, which is the 3-part measurement; 4 cm is the value of one part only; 80 cm comes from multiplying the 16 cm by 5 without first dividing by the 4 parts the length is worth.
- (c) 3 : 2 — Method: 'A is k times B' means that if B is taken as 1 part then A is k parts, and a ratio in its simplest form is written with whole numbers that have no common factor. Working: taking B as 1, A is 1.5, so A : B = 1.5 : 1; multiplying both parts by 2 clears the decimal and gives 3 : 2, and 3 and 2 share no factor. Answer: 3 : 2. The distractors: 2 : 3 comes from writing B before A, reversing the order the question asks for; 1.5 : 1 is the right relationship but is not in its simplest form, because a ratio in its simplest form uses whole numbers; 3 : 5 comes from comparing A with the combined length rather than with B, since A : (A + B) = 1.5 : 2.5 = 3 : 5.
- (c) 36 cm — A perimeter is built from lengths, so it is multiplied by the length scale factor and not by the square of it. The scale factor from the smaller rectangle to the larger one is 10 ÷ 5 = 2. The larger perimeter is therefore 18 × 2 = 36 cm.
- (d) £144 — Method: find the length (perimeter) scale factor by taking the square root of the area ratio, then apply it to the cost. Working: 12 : 27 simplifies to 4 : 9, and the square root of each part gives the length ratio 2 : 3, so the scale factor from the smaller to the larger pond is 3 ÷ 2 = 1.5. Cost = £96 × 1.5 = £144. Answer: £144. £216 comes from using the area ratio itself as the cost ratio, £96 × (27 ÷ 12) = £216, without taking the square root. £64 comes from using the length ratio the wrong way round, £96 × (2 ÷ 3) = £64. £111 comes from simply adding the difference in area, 27 − 12 = 15, onto the original cost, £96 + £15 = £111, instead of scaling proportionally.
- (c) £310 — Gradient = (210 − 130) ÷ (7 − 3) = 80 ÷ 4 = 20, so the monthly rate is £20. Using C = 20m + c with the point (3, 130): 130 = 60 + c, so c = 70. After 12 months: C = 20 × 12 + 70 = 240 + 70 = £310.
- (c) 500 g — Method: a concentration of 10% is the ratio 10:100, and the salt and the solution in the beaker must be in that same ratio, so write 10:100 = 50:m and scale. Working: 50 ÷ 10 = 5, so the salt is 5 times the 10 of the ratio; the solution must be 5 times the 100 of the ratio, giving 5 × 100 = 500 g. Answer: 500 g. The distractors: 5 g comes from working out 10% of 50 g, which treats the 50 g as the whole solution when it is the salt inside it; 450 g comes from scaling correctly and then taking the 50 g of salt away, which gives the mass of water rather than the mass of the whole solution; 5000 g comes from dividing by 0.01 instead of 0.1, that is from writing 10% as 0.01.
- (b) 16 — Method: substitute x into each equation separately, then subtract the smaller value from the larger. Working: y = 3 × 4 = 12 and z = 7 × 4 = 28, so the difference is 28 − 12 = 16. Answer: 16. The distractors: 4 comes from subtracting the constants, 7 − 3, which is the difference between the two gradients rather than the difference between the values at x = 4; 40 comes from adding the two values, 12 + 28, instead of subtracting them; 28 is the value of z on its own, given instead of being compared with the value of y.
Build your own mix at the worksheet builder.