Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 24 km/h — First convert 45 minutes to hours: 45 ÷ 60 = 0.75 hours. Then divide the distance by the time: 18 ÷ 0.75 = 24 km/h. Reading 45 minutes as 0.45 hours (writing the minutes after the decimal point instead of dividing by 60) gives 18 ÷ 0.45 = 40 km/h. Working out 18 × 0.75 = 13.5 multiplies by the time instead of dividing. Working out 18 ÷ 45 = 0.4 divides by 45 without ever converting the minutes to hours. The cyclist's average speed is 24 km/h.
- (a) 5/12 — Work out the distance still to travel: 372 − 217 = 155 miles. Form the fraction 155/372; both numbers share a factor of 31, so 155 ÷ 31 = 5 and 372 ÷ 31 = 12, giving 5/12. 7/12 comes from writing the distance already travelled as the fraction of the journey (217/372 = 7/12), instead of the distance still to travel. 145/372 comes from miscalculating 372 − 217 as 145 instead of 155. 5/7 comes from comparing the remaining distance with the distance already travelled (155/217 = 5/7), instead of with the total journey.
- (d) Gradient = acceleration; area = distance travelled. — Method: on a speed–time graph, the gradient of the graph at an instant is the rate of change of speed with time, which is acceleration; the area between the graph and the time-axis over an interval is the total distance covered in that interval, because it accumulates speed × time. Working: gradient = acceleration and area = distance travelled is the correct pairing. Swapping the two quantities completely, gradient = distance travelled and area = acceleration, is the reverse of what each actually measures. Keeping gradient = acceleration correct but then also claiming area = acceleration too is wrong because the area is a different physical quantity, distance, not a second way of finding the same rate. Claiming the gradient itself gives the speed confuses the RATE OF CHANGE of the plotted quantity with the plotted quantity itself — the gradient is how fast the speed is changing, not the speed. On any rate graph, the gradient of the graph is always the RATE at that instant, and the area under the graph is always the TOTAL AMOUNT accumulated — keep straight which of the two questions each one answers.
- (d) The candle's height decreases by 0.3 cm every minute. — A negative gradient means the quantity on the vertical axis decreases as the quantity on the horizontal axis increases. The size of the gradient, 0.3, gives the amount of decrease per minute.
- (d) £7060 — A 6% decrease each year means the value becomes 100% − 6% = 94% of the previous year's value, and 94% = 0.94, so the multiplier is 0.94. Apply it once for each of the 3 years: £8500 × 0.94 = £7990 after 1 year, £7990 × 0.94 = £7510.60 after 2 years, £7510.60 × 0.94 = £7059.96 after 3 years, which rounds to £7060 to the nearest pound. (£6970 comes from using simple depreciation instead of compound, taking 6% of the original £8500 three times: £8500 − 3 × £510 = £6970. £7990 is the value after only 1 year, forgetting the remaining 2 years. £7511 is the value after only 2 years, £8500 × 0.94² = £7510.60, forgetting the third year.)
- (d) The 750 g box, at 36p per 100 g — Work out the cost per 100 g of each box. 750 g box: 270p ÷ 7.5 = 36p per 100 g. 500 g box: 195p ÷ 5 = 39p per 100 g. The lower cost per 100 g is the better value, so the 750 g box at 36p per 100 g is the answer. Choosing the 500 g box at 39p per 100 g gets the maths right but picks the higher unit price, not realising a smaller cost per 100 g is the better deal. Choosing the 500 g box because £1.95 is lower than £2.70 compares the total prices without allowing for the different pack sizes at all. Working out 270 ÷ 5 = 54p divides the 750 g box's price by the wrong number of hundred-grams (the 500 g box's), giving a rate that belongs to neither box. The 750 g box, at 36p per 100 g, is the better value.
- (c) 40 cm — First find the real pitch length using Plan A's scale: 8 × 1000 = 8000 cm. Now find its length on Plan B using Plan B's scale: 8000 ÷ 200 = 40 cm. Assuming both plans use the same scale and leaving the length as 8 cm ignores that Plan B has a different scale. Using the ratio of the two scales upside down, 200 ÷ 1000 = 0.2, then 8 × 0.2 = 1.6, gives 1.6 cm — Plan B is drawn to a larger scale than Plan A, so lengths on it should be bigger, not smaller. Dividing by 2000 instead of 200 gives 4 cm, ten times too small.
- (d) The population is growing at 2500 people per year. — The gradient of a tangent to a graph gives the instantaneous rate of change of the quantity on the vertical axis with respect to the quantity on the horizontal axis, at that exact point — not the total change and not an average. Here the vertical axis is population in thousands and the horizontal axis is time in years, so the gradient is measured in thousands of people per year. A gradient of 2.5 means the population is growing at an instantaneous rate of 2.5 thousand people per year, and since P is measured in thousands, 2.5 × 1000 = 2500 people per year. This describes the rate of change at that instant, not the total increase over the 6 years and not an average population.
- (d) £82.50 — Find the hourly rate: £52.50 ÷ 7 = £7.50 per hour. For 11 hours: 11 × £7.50 = £82.50. £30 comes from working out the pay for only the extra 4 hours (4 × £7.50), and forgetting to include the original £52.50. £99 comes from misremembering the hourly rate as £9 instead of £7.50, then 11 × £9. £56.50 comes from adding the extra number of hours (4) straight onto the pay in pounds (52.5 + 4), confusing hours with pounds.
- (c) m = 6c — Method: the whole is the sum of the parts in the ratio, and the cement is 1 part, so one part weighs c kg. Working: the mix has 5 + 1 = 6 parts, each of mass c kg, so the total mass is 6 × c, giving m = 6c. Answer: m = 6c. The distractors: m = 5c uses the 5 gravel parts as the multiplier and forgets that the cement is in the mix too, so it gives the mass of the gravel and not the total; m = c + 5 comes from reading the ratio as '5 more than' and adding, which treats a number of parts as a mass in kilograms; m = c/6 turns the relationship upside down, as though the total were shared into the cement rather than the cement multiplied up to the total.
- (b) 2/5 — Method: a fraction taken 'of the total' has the whole batch as its denominator, so add the two masses first and then write the butter over that total. Working: the total mass is 450 g + 300 g = 750 g, so the fraction is 300/750; the highest common factor of 300 and 750 is 150, and 300 ÷ 150 = 2 while 750 ÷ 150 = 5. Answer: 2/5 of the batch. The distractors: 2/3 comes from comparing the butter with the flour, 300/450, a part-to-part fraction when the question asks for a part compared with the whole; 3/5 comes from writing the flour over the total, 450/750, which answers about the wrong ingredient; 3/2 comes from writing the flour over the butter, 450/300, which both uses the wrong denominator and reverses the order.
- (b) 4 : 25 — For similar shapes, the ratio of areas is the ratio of lengths squared: 2² : 5² = 4 : 25. 2 : 5 comes from using the perimeter ratio itself as the area ratio, without squaring it at all. 8 : 125 comes from cubing each part instead of squaring (2³ : 5³) — cubing is the rule for volume, not area. 4 : 5 comes from squaring only the first part of the ratio (2² = 4), and leaving the second part unsquared.
- (c) 24p — Method: change the price to pence, then find what one tenth of 1 kg costs, since 100 g is one tenth of 1 kg. Working: £2.40 = 240p per kg, and 240 ÷ 10 = 24p per 100 g. So the cost is 24p per 100 g. Distractor 2.4p comes from dividing by 100 instead of 10. Distractor 2400p comes from multiplying by 10 instead of dividing. Distractor 240p comes from using the price per kg without scaling it down to 100 g.
- (a) 1.5 km — Multiply the map length by the scale: 6 × 25 000 = 150 000 cm. Convert to kilometres: 150 000 cm = 1.5 km. Dividing by only 1000 instead of the full conversion when changing units gives 150 km, a hundred times too large. Misreading the scale as 1 : 2500 instead of 1 : 25 000 gives 6 × 2500 = 15 000 cm = 0.15 km, a hundred times too small. Leaving the answer as 150 000 without converting units at all, and calling it 150 000 km, mistakes centimetres for kilometres completely.
- (a) 0.6 litres — The ratio 1 : 9 means the solution has 1 + 9 = 10 equal parts in total. Each part is 6 ÷ 10 = 0.6 litres, and disinfectant is 1 part, so Priti needs 0.6 litres of disinfectant. Giving 0.667 litres divides by 9, the number of parts of water, instead of the total number of parts, 10 (6 ÷ 9 ≈ 0.667). Giving 6 litres is the total amount of solution, not just the disinfectant's share of it. Giving 5.4 litres works out the water's share (6 × 9 ÷ 10 = 5.4), not the disinfectant's.
Build your own mix at the worksheet builder.