Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 1.00 litres — Squash is 2/9 of the mixture, so the squash volume is 4.5 × 2/9 = 1.00 litres. Using the water's fraction, 7/9, instead of squash's gives 4.5 × 7/9 = 3.50 litres — the volume of water, not squash. Dividing 4.5 by 9 but forgetting to multiply by the numerator 2 gives 4.5 ÷ 9 = 0.50 litres, which is only 1/9 of the mixture. Halving the total volume instead of applying the fraction 2/9 gives 4.5 ÷ 2 = 2.25 litres, which assumes the mixture is half squash.
- (c) 500 — Pressure = force ÷ area = 250 ÷ 0.5 = 500 pascals. Getting 125 comes from multiplying the force by the area instead of dividing (250 × 0.5 = 125). Getting 249.5 comes from subtracting the area from the force instead of dividing. Getting 50 comes from misreading the area as 5 m² instead of 0.5 m² and dividing 250 by 5.
- (d) y = 3x/4 — y : x = 3 : 4 means y/x = 3/4. Rearranging to make y the subject gives y = (3/4)x = 3x/4. A student who mixes up which quantity goes on top gets y = 4x/3. A student who treats the ratio numbers as the coefficient and constant of a linear equation instead of a proportional relationship gets y = 3x + 4. A student who mistakes the relationship for inverse proportion gets y = 3/(4x).
- (d) 75 pages — Method: find the number of pages printed in one minute, then scale up to 10 minutes. Working: 45 ÷ 6 = 7.5 pages per minute, so 7.5 × 10 = 75 pages. Answer: 75 pages. 27 pages comes from using the ratio upside down, 45 × 6 ÷ 10, instead of finding the rate per minute first. 55 pages comes from simply adding the extra minutes, 10, onto the original number of pages, 45. 70 pages comes from rounding the rate down to 7 pages per minute before multiplying by 10, instead of using the exact rate of 7.5.
- (b) 5 litres — Method: adding water changes the total volume but adds no salt, so work out the volume of salt, then the total volume that makes that salt 20% of the mixture, then the extra water. Working: 30% of 10 litres is 0.3 × 10 = 3 litres of salt. For the same 3 litres to be 20% of the new mixture, the new total volume is 3 ÷ 0.2 = 15 litres. The water added is the extra volume, 15 − 10 = 5 litres. Answer: 5 litres. The distractors: 3 litres is the volume of salt in the solution, which is the first step and not what the question asks for; 15 litres is the total volume of the new mixture, which counts the 10 litres already in the container as water that was poured in; 2 litres comes from taking 20% of the original 10 litres, applying the new percentage to the old volume instead of to the new one.
- (c) 5 hours — Method: measure the job in decorator-hours, which is in the same ratio as the number of rooms, then share the decorator-hours between the decorators available. Working: 5 decorators × 6 hours = 30 decorator-hours for 3 rooms, so one room takes 30 ÷ 3 = 10 decorator-hours; 5 rooms take 5 × 10 = 50 decorator-hours; shared between 10 decorators that is 50 ÷ 10 = 5 hours. Answer: 5 hours. The distractors: 3 hours comes from halving the 6 hours because the number of decorators doubles, while forgetting that there are also more rooms to paint; 10 hours comes from scaling the 6 hours up for the rooms only, 6 × 5 ÷ 3, and leaving the workforce at 5 decorators; 6 hours comes from assuming that doubling the decorators and increasing the rooms cancel each other out, which they do not, because the rooms rise by a factor of 5/3 and the workforce by a factor of 2.
- (c) £22.50 — Method: find the cost of 1 kg, then multiply by the mass wanted. Working: £36 ÷ 2.4 = £15 per kilogram, and 1.5 × £15 = £22.50. Answer: £22.50. The distractors: £15 is the price of 1 kg, which is the first step and not what the question asks for; £54 comes from multiplying the £36 by 1.5 without first reducing it to a price per kilogram; £57.60 comes from using the scale factor upside down, multiplying £36 by 2.4 ÷ 1.5 = 1.6 instead of by 1.5 ÷ 2.4.
- (c) £3,200 — Method: find the value of one part of the ratio from the first investor's amount, then work out the second investor's share before adding both together. Working: £1,200 is 3 parts, so one part is £1,200 ÷ 3 = £400. The second investor's share is 5 × £400 = £2,000, and the total is £1,200 + £2,000 = £3,200. So the total invested is £3,200. Distractor £2,000 is only the second investor's share, without adding the first investor's £1,200. Distractor £2,400 comes from doubling the first investor's amount instead of using the ratio. Distractor £6,000 comes from multiplying £1,200 by 5 directly instead of first finding the value of one part.
- (d) 125 — Since y is directly proportional to x², y = kx² for a constant k. Using x = 3, y = 45: 45 = k × 9, so k = 45 ÷ 9 = 5. The equation is y = 5x². When x = 5: 5² = 25, and 5 × 25 = 125, so y = 125. Reporting 5² = 25 on its own, without multiplying by the constant k, gives only the square of the new x-value, not the value of y. Treating the proportion as if y were proportional to x itself, rather than to x², gives k = 45 ÷ 3 = 15 and then y = 15 × 5 = 75, which is not this relationship. Squaring the new x-value as though squaring meant doubling it instead gives 5 × 10 = 50, not the true square. When x = 5, y = 125.
- (a) 35/32 — Work out each weekly total first. Last week: 5 × 7 = 35 hours. This week: 4 × 8 = 32 hours. Last week's total is being written as a fraction of this week's total, so last week goes on the top and this week goes on the bottom, giving 35/32. The two totals share no common factor, so the fraction cannot be cancelled. It is greater than 1, which says that Priya worked more hours last week than this week.
- (a) 20 people/year — The gradient of a tangent to a graph at a point equals the instantaneous rate of change of the quantity there. A straight line's gradient is the change in the vertical value divided by the change in the horizontal value between two points on it. Here the tangent passes through (2, 180) and (6, 260), so the change in population is 260 − 180 = 80 and the change in time is 6 − 2 = 4. The gradient is 80 ÷ 4 = 20. Reporting the change in population, 80, on its own is not a rate, because that growth happened over 4 years and has not been divided by them. Adding the two changes instead of dividing gives 80 + 4 = 84, which is not a rate. Subtracting the coordinates in the wrong order, (180 − 260) ÷ (6 − 2), gives −80 ÷ 4 = −20, the wrong sign. The instantaneous rate of change of the population at t = 4 is 20 people per year.
- (b) 2.5 hours — Method: when two objects move in opposite directions the gap between them grows at the sum of their speeds, so divide the required gap by that combined rate. Working: 80 + 60 = 140 km of gap each hour, and 350 ÷ 140 = 2.5. Answer: 2.5 hours. The distractors: 17.5 hours comes from subtracting the speeds, 80 − 60 = 20, which is the rate for two cars travelling in the same direction; 5 hours comes from using the mean of the two speeds, 70 km/h, instead of their sum; 4.375 hours comes from dividing 350 by 80 and ignoring the second car altogether.
- (b) 5/7 — The enlargement multiplier is 1.4, which as a fraction is 7/5. To reverse an enlargement, use the reciprocal of the multiplier: flip 7/5 to get 5/7. 7/5 comes from using the enlargement multiplier again, instead of reversing it. 3/5 comes from treating the reverse as 'give back the extra amount', working out 1 − (1.4 − 1) = 0.6, instead of using the reciprocal. 5/2 comes from ignoring the whole number in 1.4 and inverting only the decimal part, 0.4, as if it were the whole multiplier.
- (b) £76.00 — One part of the ratio is £47.50 ÷ 5 = £9.50. The school receives 8 parts, so its share is 9.50 × 8 = £76.00. Dividing £47.50 by 8 instead of 5, treating the charity's amount as if it were 8 parts, gives 47.50 ÷ 8 = 5.9375, then × 5 = £29.69. Adding the charity's amount to the school's amount instead of stopping at the school's own share gives the total collected, 9.50 × 13 = £123.50. Adding one part to the charity's amount instead of multiplying one part by 8 gives 47.50 + 9.50 = £57.00.
- (d) 7/3 — Put the kettle's energy over the toaster's energy: 2.1/0.9. Multiply both numbers by 10 to clear the decimals: 21/9. Divide both by their highest common factor, 3: 21÷3 = 7, 9÷3 = 3, giving 7/3. (3/7 comes from writing the energy values the wrong way round. 4/3 comes from finding the difference, 2.1 − 0.9 = 1.2 kWh, and writing it as a fraction of the toaster's energy, 1.2/0.9. 7/10 comes from comparing the kettle's energy to the total energy used by both appliances, 2.1/3.0.)
Build your own mix at the worksheet builder.