Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A car is bought for £17,500. Its value decreases by 12% in the first year, and by a further 10% of its reduced value in the second year. Work out the value of the car at the end of the second year, giving your answer to the nearest pound.
- 2.A furniture maker builds two mathematically similar bookcases. The smaller bookcase is 40 cm tall and uses 2 m² of wood. The larger bookcase is 60 cm tall. Work out the area of wood needed for the larger bookcase, giving your answer in m².
- 3.Two mathematically similar hexagonal tiles have areas 18 cm² and 50 cm². Work out the ratio of the side length of the smaller tile to the side length of the larger tile, in simplest form.
- 4.A cyclist rides 19.3 km in 47 minutes. Work out her average speed, in km/h, to 1 decimal place.
- 5.Given that 1 mile ≈ 1.6 km, work out a speed of 55 mph in km/h.
- 6.A coach travels the 54 miles from London to Brighton in 1 hour 30 minutes. Work out the average speed of the coach, in mph.
- 7.Two mathematically similar tins have heights 8 cm and 12 cm. Jayden says that the volume of the larger tin is 1.5 times the volume of the smaller tin. Give a reason why Jayden is incorrect, and work out the correct volume scale factor.
- 8.A straight-line graph shows the cost, C pounds, of hiring a bike for h hours. The line passes through the points (1, 12) and (4, 27). Which of these statements about the line is true?
- 9.Paint costs £14.40 for every 20 m² of wall it covers. Assuming the same rate, work out the cost of the paint needed to cover 56 m² of wall.
- 10.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 11.A cyclist rides 17.5 km on Saturday and 12.25 km on Sunday. Write the distance ridden on Saturday as a fraction of the distance ridden on Sunday, giving your answer in its simplest form.
- 12.A scale drawing of a garden uses a scale of 1 : 20. Write down a formula for the real length, L metres, in terms of the length on the drawing, d centimetres, given that 1 metre = 100 centimetres.
- 13.An architect builds a scale model of a staircase before construction. The model is mathematically similar to the real staircase, at a scale of 1 : 10. The model covers a floor area of 0.4 m² on the plan. Work out the floor area the real staircase will cover, giving your answer in m².
- 14.A photo is enlarged so that its new width is 1.4 times its original width. Write the multiplier that would scale the new width back down to the original width, as a fraction in its simplest form.
- 15.Two cars travel at constant speeds. Car A travels 150 km in 3 hours. Car B travels 180 km in 4 hours. Which car is faster, and what is its speed?
Build your own mix at the worksheet builder.