Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.Two mathematically similar rectangles have lengths in the ratio 3 : 5. The area of the smaller rectangle is 27 cm². Work out the area of the larger rectangle.
- 2.A dog walker's charge, C pounds, for walking a dog for m minutes is shown on a straight-line graph. The line passes through the points (20, 14) and (50, 26). Work out the charge for a 65-minute walk.
- 3.Two quantities, P and Q, are in inverse proportion. A graph is drawn with P on the vertical axis and Q on the horizontal axis. Write down which description fits the shape of this graph.
- 4.A worker is paid £13.20 per hour. Work out this rate of pay in pence per minute.
- 5.A toy manufacturer makes a model aircraft that is mathematically similar to the real aircraft, at a scale of 1 : 48. The wingspan of the model is 15 cm. Work out the wingspan of the real aircraft, giving your answer in metres.
- 6.A candidate wants to estimate the instantaneous rate of change of a reservoir's water level, in metres, at t = 5 days after heavy rain began. The reservoir's water level is plotted against time, in days, since the rain began. The candidate uses the chord joining the points at t = 0 days and t = 20 days to estimate the rate of change at t = 5 days. Give a reason why this is likely to be a poor estimate.
- 7.A car travels for 3 hours at an average speed of 80 km/h and then for 1 hour at an average speed of 40 km/h. Work out the average speed for the whole journey.
- 8.A recipe for 6 muffins needs 150 g of flour. Aisha wants to make 15 muffins using the same recipe. Work out how much flour she needs.
- 9.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 10.A sculptor makes two mathematically similar statues. The smaller statue is 20 cm tall and 80 ml of varnish covers its surface. The larger statue is 50 cm tall. Work out how much varnish is needed to cover the surface of the larger statue.
- 11.A market stall sells apples at a fixed price per kilogram. Priya buys 3 kg for £5.40. Write the ratio of the mass in kilograms to the cost in pounds, in its simplest form.
- 12.It takes 8 painters 6 days to paint a fence. Working at the same rate, work out how many days 4 painters would take to paint the same fence.
- 13.The width, the length and the height of a box are in the ratio 3:4:5. The length of the box is 16 cm. Work out the height of the box.
- 14.Two hikers' journeys are shown on separate distance-time graphs. Hiker A's graph has gradient 4.5 km/h. Hiker B's graph has gradient 3.2 km/h. Work out how much faster Hiker A walks than Hiker B, in km/h.
- 15.Order these three values from smallest to largest: 3/8, 0.43, 41%.
Build your own mix at the worksheet builder.