Printable · GCSE Higher · ages 14-16
Statistics worksheet — GCSE Higher
Fifteen questions across the statistics statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Statistics worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.Write down the statement that correctly describes the difference between correlation and causation.
- 2.A scatter graph of the number of hours, x, that pupils revised against their test score, y, has the line of best fit y = 2.5x + 15. Amelia wants a score of at least 80. Work out the least whole number of hours of revision the line of best fit suggests she needs.y = 2.5x + 15
- 3.A cumulative frequency graph for the diameters, d mm, of 320 ball bearings is plotted from these points (upper class boundary, cumulative frequency): (10, 30), (20, 90), (30, 190), (40, 280), (50, 320). Estimate the diameter below which 90% of the ball bearings measure.
- 4.A scatter graph shows the midday temperature, x °C, and the number of ice creams sold at a seaside kiosk, y. The line of best fit is y = 3x − 20. Give a reason why the y-intercept of this line of best fit is not a sensible estimate of the number of ice creams sold.y = 3x − 20
- 5.A scatter graph shows the number of hours of sunshine, x, and the number of visitors, y, at an outdoor swimming pool in Torquay on each of 15 days. The line of best fit passes through the points (5, 150) and (15, 350). Work out the estimated number of visitors on a day with 8 hours of sunshine, using the line of best fit.
- 6.A scatter graph shows the mass, x kg, of a parcel and the cost, y pounds, of posting it. The line of best fit is y = 1.5x + 2. Work out the estimated cost of posting a parcel with a mass of 6 kg, using the line of best fit.y = 1.5x + 2
- 7.A scatter graph shows the number of days, x, that each of 16 tomato plants was watered and its height, y cm. The line of best fit has equation y = 1.5x + 4. Write down what the 1.5 in this equation tells you about the plants.y = 1.5x + 4
- 8.A composite (stacked) bar for a charity bake sale in Durham shows the number of cakes sold, split into three types. The bar has a total height of 80 cakes: 34 were sponge cakes, 26 were chocolate cakes and the rest were fruit cakes. Work out the percentage of the cakes sold that were fruit cakes.
- 9.Priya travels to work by one of two routes and records her journey times, in minutes, over several weeks. Route 1 has a median of 34 minutes and an interquartile range of 22 minutes. Route 2 has a median of 41 minutes and an interquartile range of 6 minutes. Priya wants the more reliable route for getting to an important meeting on time. Which route should she choose, and why?
- 10.A charity shop in Leicester made £2,400 in one month. A pie chart shows how this was spent: repairs took up an angle of 90°, wages took up an angle of 150°, and the rest was other costs. Work out how much was spent on wages.
- 11.A scatter graph of taxi journeys in Bristol shows the distance, x miles, and the fare, y pounds. The line of best fit is y = 2x + 3.50. Work out the estimated fare for a journey of 6 miles, using the line of best fit.y = 2x + 3.5
- 12.The times taken, in minutes, by 30 runners in a Portsmouth fun run are grouped in this table: 0 < t ≤ 20 — 5 runners, 20 < t ≤ 40 — 10 runners, 40 < t ≤ 60 — 10 runners, 60 < t ≤ 80 — 5 runners. Work out an estimate for the mean time, in minutes.
- 13.A garden centre records the heights, in cm, of eleven seedlings. In order, the heights are 5, 9, x, 17, 20, 24, 28, 31, 35, 40, 44, where x is unknown. The interquartile range of the eleven heights is 19 cm. Work out the value of x.
- 14.The seven members of Team A took 20, 21, 22, 23, 24, 25 and 40 seconds to finish a task. The seven members of Team B took 20, 30, 32, 34, 36, 38 and 40 seconds. Tomás says that because the two teams have the same range, their times are spread out in the same way. Is Tomás right? Give a reason for your answer.
- 15.A sports centre in Newcastle asks 60 members which activity they prefer: swimming 15 members, football 25 members, badminton 12 members and other activities 8 members. Work out the angle at the centre of the pie chart sector that represents badminton.
Answer key
- (d) Correlation is a link; causation is one causing the other — Method: the two words describe different claims — one is about a pattern in the data, the other is about what produced that pattern. Working: correlation says only that two quantities tend to change together, which is something a scatter graph can display; causation says that a change in one quantity actually brings about the change in the other, which needs evidence a scatter graph cannot supply, because a third quantity may be driving both. Answer: correlation is a link between the quantities, while causation is one quantity causing the change in another. The distractors: the statement giving causation as the link and correlation as the cause simply swaps the two words over; the statement that the words mean the same thing is the classic error of reading a correlation as proof of cause; the statement that a scatter graph shows causation but not correlation reverses what a scatter graph can do, since the pattern it displays is exactly the correlation.
- (a) 26 — Method: a line of best fit lets one quantity be predicted from the other, so the score is substituted into the equation of the line and the resulting inequality is solved for the number of hours. Working: a score of at least 80 means 2.5x + 15 ≥ 80; taking 15 from both sides gives 2.5x ≥ 65, and dividing both sides by 2.5 gives x ≥ 26, so the least whole number of hours is 26. Checking, 2.5 × 26 + 15 = 80, which does reach the target. Answer: 26 hours — and this is only an estimate, because a line of best fit predicts a trend rather than an individual result, and a prediction made outside the range of hours the pupils actually revised for would be an extrapolation and less reliable still. The distractors: 27 comes from reaching 26 and then rounding up again, although 26 hours already gives a score of exactly 80; 32 comes from 80 ÷ 2.5, which ignores the 15 in the equation of the line; 38 comes from (80 + 15) ÷ 2.5, that is from adding the 15 instead of subtracting it when rearranging.
- (c) 42 — Method: find the target cumulative frequency, 90% of the total, locate the class it falls in from the plotted points, then interpolate: lower boundary, plus the extra distance needed into the class divided by the class's frequency, times its width. Working: 90% of 320 is 0.9 × 320 = 288. The plotted points show a cumulative frequency of 280 at d = 40 and 320 at d = 50, so the class 40 ≤ d < 50 has frequency 320 − 280 = 40 and width 50 − 40 = 10, and 288 falls inside it. The extra distance needed into the class is 288 − 280 = 8, and 8 ÷ 40 × 10 = 2, so the diameter is 40 + 2 = 42. Answer: the estimated diameter is 42 mm. Watch which point and which class the interpolation actually uses: reading off d = 40, the plotted point just below the target, instead of interpolating the extra 8 ball bearings into the next 10 mm, stops one step short of the true answer; finding the diameter below which only 10% lie instead of 90% gives a target of 0.1 × 320 = 32, which falls in the class 10 ≤ d < 20 — the extra distance into that class is 32 − 30 = 2, and 2 ÷ 60 × 10 = 0.3, so this route gives 10 + 0.3 = 10.3, the bottom decile rather than the top 90%; and interpolating within the class 30 ≤ d < 40 instead of 40 ≤ d < 50, as though 288 had not yet reached a cumulative frequency of 280, treats the extra distance as 288 − 190 = 98, and 98 ÷ 90 × 10 = 10.9, giving 30 + 10.9 = 40.9, one class too early.
- (a) x = 0 gives y = −20: a negative number sold — The y-intercept is the value the line predicts when x = 0: y = 3 × 0 − 20 = −20. A kiosk cannot sell a negative number of ice creams, so this is not a sensible estimate. The 3 in the equation is the gradient, not the intercept, so an option claiming x = 0 gives y = 3 has swapped the two numbers around — substituting x = 0 makes the 3x term equal 0, leaving −20, not 3. The danger of extrapolating to very high temperatures is a real issue with this line, but it is a different issue from the y-intercept, so it does not answer this question. And whether x = 0 could occur on a trading day is beside the point: the model still makes that prediction, and it is the prediction itself, −20, that is impossible.
- (d) 210 — 350 − 150 = 200. 200 ÷ 10 = 20, so the gradient is 20. Using the point (5, 150): 20 × 5 = 100, so 150 − 100 = 50 is the intercept, giving the line y = 20x + 50. At x = 8: 20 × 8 = 160, and 160 + 50 = 210, so the estimated number of visitors is 210. Choosing 160 stops after 20 × 8 = 160 and forgets to add the intercept of 50. Choosing 250 comes from averaging the two given y-values: 150 + 350 = 500, and 500 ÷ 2 = 250, instead of using the line's equation. Choosing 240 assumes the visitors are directly proportional to the hours of sunshine using the first point, 150 × 8 ÷ 5 = 240, which ignores that the line does not pass through the origin.
- (b) £11.00 — 1.5 × 6 = 9, and 9 + 2 = 11, so the estimated cost is £11.00. Choosing £9.00 stops after 1.5 × 6 = 9 and forgets to add the £2. Choosing £12.00 adds the mass and the constant first and then multiplies: 6 + 2 = 8, and 8 × 1.5 = 12.00. Choosing £13.50 swaps the gradient and the intercept, using y = 2x + 1.5 instead: 2 × 6 = 12, and 12 + 1.5 = 13.50.
- (b) On average a plant grew 1.5 cm taller for each extra day — Method: in the equation of a line, the number multiplying x is the gradient, and a gradient states the change in y produced by an increase of 1 in x, read in the units of the two axes. Working: here x is measured in days and y in centimetres, so the gradient 1.5 carries the units centimetres per day. Testing it on the line, 5 days gives 1.5 × 5 + 4 = 11.5 cm and 6 days gives 1.5 × 6 + 4 = 13 cm, a rise of 1.5 cm for the one extra day. Answer: on average a plant grew 1.5 cm taller for each extra day of watering. The distractors: 1.5 cm as the height before any watering is the value of y when x is 0, which is the other number in the equation, 4 cm, so this swaps the gradient and the intercept; 1.5 cm as the gap between the tallest and the shortest plant reads the gradient as a range, when a range is a difference between two of the 16 plants and a gradient is a rate; 1.5 days for each extra centimetre inverts the rate, dividing days by centimetres instead of centimetres by days, and the line gives 1 cm of growth in two thirds of a day.
- (d) 25% — First find the number of fruit cakes: 80 − 34 − 26 = 20. Then write this as a percentage of the total: 20 ÷ 80 × 100 = 25%. Giving 20% comes from reporting the count of fruit cakes, 20, directly as a percentage, without dividing by the total of 80 first. Giving 32.5% computes the percentage of chocolate cakes instead of fruit cakes: 26 ÷ 80 × 100 = 32.5%. Giving 42.5% computes the percentage of sponge cakes instead of fruit cakes: 34 ÷ 80 × 100 = 42.5%.
- (c) Route 2, because its interquartile range is smaller — Method: for a journey where turning up on time matters, what matters is not the typical (median) time but how predictable it is — a smaller interquartile range means the middle half of journeys cluster closer together. Working: Route 1's median, 34 minutes, is in fact lower than Route 2's, 41 minutes, so Route 1 is faster on average; but Route 1's interquartile range, 22 minutes, is far larger than Route 2's, 6 minutes, so Route 1's times are much less predictable. Answer: Priya should choose Route 2, because its interquartile range is smaller, even though it is slower on average. Watch which statistic answers the question actually asked: Route 1 does not have the smaller interquartile range, Route 2 does, so picking Route 1 for that reason misreads the table; Route 1's median genuinely is the lower one, but a lower median answers 'which is faster', not 'which is more reliable'; and Route 2's median is not the lower one, so that claim about Route 2 is simply false.
- (b) £1,000 — Wages take up 150° out of 360°, so the amount spent on wages is 150 ÷ 360 × 2400 = £1,000. Choosing £600 uses the repairs angle, 90°, instead of the wages angle: 90 ÷ 360 × 2400 = 600. Choosing £3,600 treats the angle in degrees as if it were a percentage, 150 ÷ 100 × 2400 = 3600, instead of dividing by 360°. Choosing £800 uses the angle for the 'other costs' sector, 360 − 90 − 150 = 120°, instead of the wages sector: 120 ÷ 360 × 2400 = 800.
- (d) £15.50 — 2 × 6 = 12, and 12 + 3.50 = 15.50, so the estimated fare is £15.50. Choosing £12.00 stops after 2 × 6 = 12 and forgets to add the £3.50. Choosing £19.00 adds the distance and the constant first and then multiplies: 6 + 3.50 = 9.50, and 9.50 × 2 = 19.00, applying the ×2 to the whole sum instead of only to the distance. Choosing £13.00 multiplies only the constant term by 2 instead of the distance: 2 × 3.50 = 7, and 7 + 6 = 13.00.
- (c) 40 minutes — Method: for grouped data, estimate the mean using the midpoint of each class — multiply each midpoint by its frequency, add the results, then divide by the total frequency. Working: the midpoints are 10, 30, 50 and 70 minutes. 10 × 5 = 50. 30 × 10 = 300. 50 × 10 = 500. 70 × 5 = 350. Σfx = 50 + 300 + 500 + 350 = 1200. Σf = 5 + 10 + 10 + 5 = 30. Estimated mean = 1200 ÷ 30 = 40 minutes. Using the upper boundary of each class instead of the midpoint — 20 × 5 = 100, 40 × 10 = 400, 60 × 10 = 600, 80 × 5 = 400 — gives a total of 1500 and an estimate of 1500 ÷ 30 = 50 minutes, too high because a boundary is not the middle of the class. Averaging the frequencies themselves, 5, 10, 10 and 5, ignores the times altogether and gives 7.5. Stopping after Σfx = 1200 without dividing by the total frequency gives a number far too large to be a time in minutes. Always find the midpoint of each class before multiplying by the frequency, and always divide by Σf at the end.
- (d) 16 — Method: rearrange interquartile range = upper quartile − lower quartile to make the lower quartile the subject: lower quartile = upper quartile − interquartile range, then check the answer sits in the right place in the list. Working: there are 11 values, so 11 + 1 = 12; the upper quartile sits at position 3 × 12 ÷ 4 = 9, which is 35, and x sits at position 12 ÷ 4 = 3, which is the lower quartile. So x = 35 − 19 = 16, and 16 does sit between the 2nd value, 9, and the 4th value, 17, as it should. Answer: x = 16. Watch how you rearrange and where you count to: adding instead of subtracting, 35 + 19 = 54, treats the interquartile range as something added on rather than a gap taken away; subtracting in the wrong order, 19 − 35 = −16, finds the right two numbers but flips the sign; and counting to the 8th value instead of the 9th treats 31 as the upper quartile, giving 31 − 19 = 12, one position short of where the upper quartile actually sits.
- (d) No, the range uses only the fastest and slowest time — Method: check what the range is built from, then look at what it leaves out. Working: both teams have a fastest time of 20 seconds and a slowest of 40 seconds, so both ranges are 40 − 20 = 20 seconds and Tomás has that part right. But the range is calculated from those two values alone. Six of Team A's seven times lie between 20 and 25 seconds, with a single time far out at 40; Team B is the other way round, with six of its seven times at 30 seconds or more and a single time far out at 20. So Team A bunches at the fast end and Team B at the slow end. The two patterns are quite different, and the range cannot see the difference because the five middle times never enter the calculation. Answer: no, because the range uses only the fastest and slowest time. The distractors: comparing the means answers a different question, since a mean measures position rather than spread, and two sets with the same spread can have different means; saying that equal ranges mean equal spread is the very assumption that fails here; saying that seven times each forces the spreads to match confuses the size of a data set with how its values are arranged inside it.
- (c) 72° — The angle is 12 ÷ 60 × 360 = 72°. Choosing 150° divides football's frequency of 25 instead of badminton's 12: 25 ÷ 60 × 360 = 150. Choosing 20° finds badminton as a percentage of the members, 12 ÷ 60 × 100 = 20, rather than an angle in degrees. Choosing 90° uses 48, the total of the other three activities, as the total instead of the full 60 members: 12 ÷ 48 × 360 = 90.
Build your own mix at the worksheet builder.