Sample paper · GCSE Foundation · grades 1–5
GCSE Foundation sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Foundation qualification — number 25%, algebra 20%, ratio, proportion and rates of change 25%, geometry and measures 15%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 50% / 25% / 25%.
CalculatorGCSE Foundation
GCSE Foundation sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- 1.A school orders 187 packed lunches for a trip. Each packed lunch costs £4.85. The school has £900 to spend. By rounding each number to 1 significant figure, work out an estimate for the total cost and decide whether £900 is enough.
- 2.The point P has coordinates (0, 12). Write down the axis that P lies on and the y-coordinate of P.
- 3.A garden centre sells two mathematically similar sacks of grass seed. The amount of lawn a sack can treat is proportional to the volume of seed inside it. The smaller sack is 20 cm tall and treats a lawn of area 30 m². The larger sack is 40 cm tall. A gardener needs to treat a lawn with an area of 500 m² using only the larger sacks. Work out the minimum number of larger sacks needed.
- 4.A solid pyramid has a square base of side 10 cm and four identical triangular faces. Its apex is directly above the centre of the base, at a vertical height of 12 cm, and the slant height of each triangular face — the distance from the apex to the midpoint of a base edge — is 13 cm. Work out the total surface area of the pyramid.
- 5.On a probability scale from 0 to 1, the points impossible (0), unlikely (0.25), evens (0.5) and certain (1) are marked. An event has a probability of 0.3. Between which two neighbouring marked points does 0.3 lie?
- 6.A café sold 10 sandwiches on each of four days: 10, 10, 10, 10. Work out the range of the numbers sold.
- 7.An allotment is divided into two plots in the ratio 2:3. The larger plot has an area of 18 m². Work out the fraction of the total area taken up by the smaller plot.
- 8.A geometric sequence starts at 3, and each term after that is found by multiplying the term before it by 2. Write down the first four terms.
- 9.A map's scale is given as '1 cm represents 2 km'. Write this scale in the form 1 : n.
- 10.Two points on a circle divide its circumference into two arcs of different lengths. Write down the name given to the shorter of the two arcs.
- 11.The probability that Oliver's train is delayed on any morning is 0.3. Work out the probability that his train is not delayed.
- 12.A student writes 0.08 as the fraction 8/10, reading the 8 as if it stood in the tenths column and ignoring the zero. Work out the correct fraction that 0.08 is equal to, giving your answer in its simplest form.
- 13.Make c the subject of the formula k = 6c.
- 14.A population of penguins on an island is 2400. The population is predicted to grow by 7% each year. Work out the predicted population after 2 years, to the nearest whole number.
- 15.A cube has all of its edges the same length. How many planes of symmetry does it have?
- 16.A cube-shaped storage tank has a volume of 15,625 cubic centimetres. Work out the length of one edge of the tank.
- 17.A theatre's front row has 18 seats. Each row behind has 4 more seats than the row in front. Which row has exactly 62 seats?
- 18.After a 20% discount, a jacket costs £48. Work out the original price of the jacket.
- 19.Estimate the value of √45, giving your answer to the nearest whole number.
- 20.A machine is bought for £8500. Its value depreciates by 6% each year. Work out the value of the machine after 3 years, to the nearest pound.
Answer key
- (b) £1,000, so £900 is not enough — Method: round each number to 1 significant figure, multiply to estimate the total cost, then compare the estimate with the money available. Working: 187 rounds to 200 and £4.85 rounds to £5, so the estimate is 200 × 5 = 1,000, and £1,000 is more than the £900 the school has. Answer: £1,000, so £900 is not enough. The distractors: £800 comes from cutting £4.85 down to £4 instead of rounding it up to £5, giving 200 × 4 = 800, and that estimate wrongly suggests the money stretches; £935 comes from rounding the price only and keeping 187 lunches, giving 187 × 5 = 935; £950 comes from rounding 187 to the nearest 10 rather than to 1 significant figure, giving 190 × 5 = 950.
- (d) the y-axis, and 12 — Method: coordinates are written (x, y), so the first number is the distance across and the second the distance up; a point whose first coordinate is 0 has not moved across from the origin and therefore lies on the vertical axis. Working: in (0, 12) the first number is 0, so P is on the y-axis, and the second number, 12, is the y-coordinate of P. Answer: the y-axis, and 12. The distractors: 'the x-axis, and 12' comes from mixing up which axis the condition 'the first coordinate is 0' describes; 'the y-axis, and 0' comes from placing P correctly but reading the pair the wrong way round, so that the first number is quoted as the y-coordinate; 'the x-axis, and 0' comes from making both of those mistakes at once.
- (c) 3 — Method: find the height scale factor, cube it to find the volume (and coverage) scale factor, use it to find one large sack's coverage, then divide the total lawn area by this and round up to a whole number of sacks. Working: height scale factor = 40 ÷ 20 = 2, so coverage scale factor = 2³ = 8, and each large sack covers 30 × 8 = 240 m². 500 ÷ 240 = 2.08…, which rounds UP to 3 whole sacks. Answer: 3. 2 comes from correctly finding that each large sack covers 240 m², but then rounding 500 ÷ 240 down instead of up, which would leave part of the lawn untreated. 5 comes from squaring the height scale factor (2² = 4) instead of cubing it, giving a coverage of only 30 × 4 = 120 m² per sack. 17 comes from forgetting to scale the coverage at all and dividing 500 by the smaller sack's coverage of 30 m².
- (b) 360 cm² — Method: the total surface area is the square base plus the four triangular faces, and the height used for a triangular face is the slant height of 13 cm, not the vertical height of 12 cm. Working: the base is 10 × 10 = 100 cm²; one triangular face is (10 × 13) ÷ 2 = 65 cm², so four faces give 4 × 65 = 260 cm²; the total is 100 + 260 = 360. Answer: 360 cm². The distractors: 260 cm² comes from adding the four triangular faces and leaving out the base; 340 cm² comes from using the vertical height of 12 cm as the height of each triangle, 100 + 4 × 60; 620 cm² comes from working out each face as 10 × 13 without halving, 100 + 4 × 130.
- (d) unlikely and evens — The marked points are impossible (0), unlikely (0.25), evens (0.5) and certain (1). Since 0.25 < 0.3 < 0.5, the probability 0.3 lies between unlikely and evens. Choosing 'impossible and unlikely' treats 0.3 as below 0.25, which it is not. Choosing 'evens and certain' treats 0.3 as above 0.5, which it is not. Choosing 'impossible and evens' skips over the unlikely marker altogether, even though 0.3 is above it.
- (d) 0 — Method: the range is the largest value minus the smallest value, whatever those two values turn out to be. Working: every value is 10, so the largest value is 10 and the smallest value is 10 as well, and the range is 10 − 10 = 0. Answer: 0 — a range of nothing says the data do not vary at all. The distractors: 10 comes from writing down the repeated value itself instead of the difference between the extremes; 20 comes from adding the largest and the smallest, 10 + 10, instead of subtracting; 40 comes from adding all four values, which gives the total sold and not a measure of spread.
- (a) 2/5 — The ratio 2:3 has 2 + 3 = 5 parts in total, and the larger plot is 3 of those parts. Since the larger plot is 18 m², each part is 18 ÷ 3 = 6 m², so the total area is 5 × 6 = 30 m² and the smaller plot is 2 × 6 = 12 m². The fraction of the total area taken up by the smaller plot is 12/30, which simplifies to 2/5. Giving the fraction for the larger plot instead of the smaller one gives 3/5. Comparing the smaller plot to the larger plot instead of to the total area gives 2/3. Assuming the two plots split the area evenly, ignoring the given ratio altogether, gives 1/2.
- (d) 3, 6, 12, 24 — Method: a term-to-term rule is applied to the term just written, so start with the first term and use the rule three more times. Working: the first term is 3; 3 × 2 = 6 is the second; 6 × 2 = 12 is the third; 12 × 2 = 24 is the fourth. Answer: 3, 6, 12, 24. The distractors: 3, 5, 7, 9 comes from adding 2 each time instead of multiplying by 2; 3, 9, 27, 81 comes from multiplying by the first term, 3, instead of by the multiplier 2 the rule gives; 6, 12, 24, 48 comes from doubling before writing anything down, so the list starts one term too late and the given first term is missing.
- (b) 1:200000 — '1 cm represents 2 km' means 1 cm on the map is 2 km in real life. Convert 2 km into centimetres, the same unit as the 1: 2 km = 2000 m = 200 000 cm. So the scale is 1 : 200 000. Converting only as far as metres gives 1 : 2000 — the conversion to centimetres was never finished. Losing a zero in the conversion gives 1 : 20 000, ten times too small. Writing 1 : 2 without converting units at all compares 1 cm to 2 km directly, which is not a valid ratio since the units do not match.
- (d) Minor arc — Method: compare the lengths of the two arcs formed by the two points, and recall the term for the shorter one. Working: the two points split the circumference into two arcs; the shorter one is the minor arc and the longer one is the major arc. A student who answers major arc has picked the longer arc by mistake. A student who answers minor segment has confused the curved boundary with the enclosed two-dimensional region. A student who answers chord has named the straight line joining the two points instead of the curved arc. Answer: minor arc.
- (d) 0.7 — Method: delayed and not delayed are the only two outcomes, so the two probabilities form an exhaustive set and add to 1; subtract the given probability from 1. Working: 1 − 0.3, written as 1.0 − 0.3 with the decimal points lined up. Answer: 0.7. The distractors: 0.3 comes from giving back the probability that the train is delayed instead of its complement; 0.97 comes from lining the decimal points up wrongly and working out 1.00 − 0.03; 0.5 comes from assuming that delayed and not delayed must be equally likely because there are only two outcomes.
- (d) 2/25 — Method: write the decimal over 100 using its two decimal places, then simplify. Working: 0.08 = 8/100 = 2/25 (dividing both numerator and denominator by 4). Answer: 2/25. The student's fraction, 8/10, comes from ignoring the zero in the tenths column and reading 0.08 as though it were 0.8; it simplifies to 4/5. 1/125 comes from writing the decimal over 1000 instead of 100, as if there were three decimal places. 25/2 comes from flipping the correct fraction upside down.
- (b) c = k/6 — k = 6c means c has been multiplied by 6, so to make c the subject, divide both sides by 6: c = k/6. Writing c = 6k multiplies by 6 again instead of undoing the multiplication. Writing c = k − 6 mistakes multiplying for adding, and subtracts 6 rather than dividing. Writing c = 6 − k reverses the order as well as the operation. The correct rearrangement is c = k/6.
- (d) 2748 — A 7% increase each year means the value becomes 100% + 7% = 107% of the previous year's value, and 107% = 1.07, so the multiplier is 1.07. Multiply by 1.07 for each of the 2 years: 2400 × 1.07 × 1.07 = 2747.76, which rounds to 2748. (2736 comes from using simple growth instead of compound: 2400 + 2 × (2400 × 0.07) = 2736. 2568 is the population after only 1 year, 2400 × 1.07, forgetting the second year's growth. 2747 comes from rounding 2747.76 down instead of up to the nearest whole number.)
- (a) 9 — A cube has 9 planes of symmetry in total: 3 that pass through the middles of pairs of opposite faces, and 6 more that pass through pairs of opposite edges diagonally. A candidate who counts only the 3 face-to-face planes — which is correct for a cuboid with three different edge lengths, but forgets that a cube's equal edges create 6 more diagonal planes — answers 3. A candidate who counts only the 6 diagonal planes and forgets the 3 face-to-face ones answers 6. A candidate who confuses the number of planes of symmetry with the number of edges on a cube answers 12. The correct total for a cube is 9.
- (c) 25 cm — Method: for a cube, the edge length is the cube root of the volume. Working: 25 × 25 × 25 = 15,625, so the edge length is 25 cm. 5 cm comes from cube-rooting 125 instead of 15,625, misreading the number of digits. 50 cm comes from working out 25 × 2 = 50, doubling the correct edge length. 125 cm comes from taking the square root of the volume instead of the cube root, since 125 × 125 = 15,625 — that would be the side of a SQUARE of area 15,625, not the edge of a cube of that volume. Answer: 25 cm.
- (d) 12 — Method: write the nth term of the sequence, 18 + 4(n − 1), set it equal to 62, and solve for n. Working: 18 + 4(n − 1) = 62, so 4(n − 1) = 44, giving n − 1 = 11, so n = 12. Answer: row 12. 11 comes from using 18 + 4n = 62 instead of 18 + 4(n − 1) = 62, an off-by-one error, giving n = 11. 48 comes from correctly simplifying to 4n = 48 but stopping there, without dividing by 4 to find n. 15.5 comes from dividing 62 by 4 directly, ignoring the 18 seats already in the front row.
- (b) £60 — £48 represents 100% − 20% = 80% of the original price. 1% = £48 ÷ 80 = £0.60, so 100% = £0.60 × 100 = £60.
- (b) 7 — Method: trap the number between the two square numbers on either side of it, then decide which of them it is nearer to. Working: 6² = 36 and 7² = 49, so √45 lies between 6 and 7; 49 − 45 = 4 while 45 − 36 = 9, so 45 is nearer to 49. Answer: 7. The distractors: 6 comes from taking the square number below 45 and stopping there, without checking which of 36 and 49 is nearer; 22.5 comes from halving 45 instead of looking for the number that multiplies by itself to give 45; 2,025 comes from squaring 45 instead of taking its square root.
- (d) £7060 — A 6% decrease each year means the value becomes 100% − 6% = 94% of the previous year's value, and 94% = 0.94, so the multiplier is 0.94. Apply it once for each of the 3 years: £8500 × 0.94 = £7990 after 1 year, £7990 × 0.94 = £7510.60 after 2 years, £7510.60 × 0.94 = £7059.96 after 3 years, which rounds to £7060 to the nearest pound. (£6970 comes from using simple depreciation instead of compound, taking 6% of the original £8500 three times: £8500 − 3 × £510 = £6970. £7990 is the value after only 1 year, forgetting the remaining 2 years. £7511 is the value after only 2 years, £8500 × 0.94² = £7510.60, forgetting the third year.)
How the 20 questions are shared out
- Number — 5 questions (25% of the qualification)
- Algebra — 4 questions (20% of the qualification)
- Ratio, proportion and rates of change — 5 questions (25% of the qualification)
- Geometry and measures — 3 questions (15% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.