Sample paper · GCSE Foundation · grades 1–5
GCSE Foundation sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Foundation qualification — number 25%, algebra 20%, ratio, proportion and rates of change 25%, geometry and measures 15%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 50% / 25% / 25%.
CalculatorGCSE Foundation
GCSE Foundation sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- 1.A market trader buys 8 melons at £1.35 each. He sells all of them for a total of £15.60. Work out his profit.
- 2.A caterer uses the formula C = 6p + 20 to work out the total cost, £C, of a buffet for p people, where £20 covers fixed costs. A customer is charged £92. Work out how many people, p, the buffet was for.
- 3.A car travels 150 km in 3 hours at a constant speed. Work out the average speed of the car, in km/h.
- 4.Write down the exact value of tan 0°.
- 5.Spinner P and Spinner Q are each fair and have 5 equal sections, numbered 1 to 5. Both spinners are spun once, and every outcome is listed as an ordered pair, Spinner P then Spinner Q, such as (2, 4). Work out how many of the outcomes have the score on Spinner P less than the score on Spinner Q.
- 6.A council wants to find out what all residents of a town think about a new cycle lane. It posts a survey only on its website and asks people to fill it in online. Give a reason why this sample is likely to be biased.
- 7.Work out √144 − 2 × 3 + √25
- 8.A table shows y = x² − 6x + 5 at these points (x, y): (0, 5), (1, 0), (2, −3), (3, −4), (4, −3), (5, 0), (6, 5). Using the symmetry shown, write down the x-coordinate of the turning point.y = x² − 6x + 5
- 9.In a mix of mortar the ratio of the mass of sand to the mass of cement is 5 : 2. Write the mass of cement as a fraction of the total mass of the mix.
- 10.A line segment joins two points on the circumference of a circle, without necessarily passing through the centre. Write down the general term for this line segment.
- 11.Ellie drops a bottle top and records whether it lands open end up. In her first 20 drops it lands open end up 13 times. She carries on, and after 200 drops in total it has landed open end up 84 times. Work out the best estimate of the probability that the bottle top lands open end up.
- 12.Write 90 as a product of its prime factors.
- 13.a = 2 and b = 5. Work out the value of a²b.
- 14.3 builders put up a fence in 12 days. All the builders work at the same rate, so the number of days is inversely proportional to the number of builders. Work out how long 9 builders take to put up the same fence.
- 15.An ice cream is made from a cone of radius 3 cm and height 10 cm, topped with a hemisphere of the same radius sitting exactly on top of the cone. Work out the total volume of the ice cream. Use π = 3.14. Give your answer to the nearest whole number. Volume of a cone = 1/3 × πr²h. Volume of a sphere = 4/3 × πr³.
- 16.Work out 1 − 1/2 − 1/4 − 1/8 − 1/16. Give your answer as a fraction.
- 17.A rope of length L metres is cut into 6 equal pieces, and 4 metres is then removed from one piece. Write an expression, in metres, for the length of that piece after the cut.
- 18.Two mathematically similar polygons have perimeters in the ratio 2 : 5. Write the ratio of their areas in its simplest form.
- 19.A florist has 60 red roses and 84 white roses. She wants to make identical bunches using all the flowers, with the greatest possible number of bunches. Work out how many red roses will be in each bunch.
- 20.A map's scale is given as '1 cm represents 2 km'. Write this scale in the form 1 : n.
Answer key
- (a) £4.80 — The total cost of the melons is 8 × £1.35 = £10.80. Profit is the selling total minus the cost, so £15.60 − £10.80 = £4.80. Subtracting the price of just one melon from the selling total instead of the total cost of all eight, £15.60 − £1.35, gives £14.25. Miscalculating the cost of the melons as 8 × £1.30 = £10.40, dropping the 5p from each price, gives a profit of £15.60 − £10.40 = £5.20. Adding the selling total and the cost together instead of subtracting them, £15.60 + £10.80, gives £26.40.
- (b) 12 — Method: substitute the total cost into the formula, then subtract the fixed cost and divide by the cost per person. Working: 92 = 6p + 20, so 6p = 92 − 20 = 72, p = 72 ÷ 6 = 12. Answer: 12 people. 15.33 comes from dividing the whole £92 by £6 without first subtracting the £20 fixed cost: 92 ÷ 6 ≈ 15.33. 4.3 comes from swapping the two amounts round, subtracting £6 and dividing by £20: (92 − 6) ÷ 20 = 4.3. 18.67 comes from adding the fixed cost instead of subtracting it: (92 + 20) ÷ 6 ≈ 18.67.
- (d) 50 — Speed = distance ÷ time, so 150 ÷ 3 = 50 km/h. (450 comes from multiplying 150 by 3 instead of dividing. 153 comes from adding 150 and 3. 147 comes from subtracting 3 from 150 — none of these use the correct compound-unit calculation, distance ÷ time.)
- (a) 0 — tan 0° = 0, because there is no opposite side to consider when the angle itself is 0° — one of the exact values you need to know. 1 is the exact value of tan 45°, not tan 0°. √3 is the exact value of tan 60°. 1/√3 is the exact value of tan 30°.
- (b) 10 — There are 25 equally likely ordered pairs in total. Listing the pairs where the Spinner P score is less than the Spinner Q score gives 10 outcomes, running from (1, 2) up to (4, 5). Choosing 15 comes from also including the 5 pairs where the two scores are equal, such as (1, 1) and (2, 2), which do not satisfy 'less than'. Choosing 4 comes from counting only the outcomes where the scores differ by exactly 1, such as (1, 2) and (2, 3), and missing the pairs that differ by 2, 3 or 4. Choosing 20 comes from correctly excluding the 5 outcomes where the two scores are equal, 25 − 5 = 20, but forgetting to also exclude the outcomes where Spinner P is bigger than Spinner Q, rather than smaller.
- (d) Only internet users reach the website; others are excluded. — Method: a sample is biased when it systematically leaves out part of the population, or systematically over-represents another part. Working: anyone without internet access, or who does not visit the council's website, has NO chance of being included — the sample is drawn only from internet-using residents, which is not the whole town. Saying too many people might respond because the survey is free confuses bias with sample size — bias is about who CAN be reached, not how many respond. Saying people might lie describes a different problem, response honesty, not who was sampled in the first place. Saying online surveys cannot be anonymous is not a reason connected to bias at all. A sample is biased when part of the population has no chance of being included, whatever the reason for that.
- (b) 11 — Method: roots and the multiplication are worked out before the addition and subtraction, and what is left is then worked through from left to right. Working: √144 = 12, √25 = 5 and 2 × 3 = 6, so the calculation becomes 12 − 6 + 5, which gives 6 + 5 = 11. Answer: 11. The distractors: 1 comes from carrying out the addition before the subtraction, giving 12 − (6 + 5) = 12 − 11 = 1; 35 comes from working from left to right with no priority, giving 12 − 2 = 10, then 10 × 3 = 30 and 30 + 5 = 35; 7 comes from combining the two roots as √(144 + 25) = √169 = 13 and then subtracting the product, giving 13 − 6 = 7.
- (d) x = 3 — The table is symmetrical about the turning point: y = 0 at both x = 1 and x = 5, and the lowest value, y = −4, occurs exactly halfway between them, at x = 3. Choosing x = 5 picks one of the roots rather than the midpoint between them. Choosing x = 1 picks the other root for the same reason. Choosing x = 6 picks the x-value where y returns to its starting value of 5, which is not the turning point.
- (c) 2/7 — Method: each number in a ratio counts parts, so the whole is all the parts added together, and the fraction wanted is the cement parts over that total. Working: the mix has 5 + 2 = 7 parts altogether, and 2 of those parts are cement, so the cement is 2/7 of the mix. Answer: 2/7. The distractors: 2/5 comes from writing the cement parts over the sand parts, comparing one part with the other part instead of with the whole; 5/7 comes from writing the sand parts over the total, which answers about the wrong material; 7/2 comes from writing the total over the cement parts, turning the fraction upside down.
- (a) Chord — Method: identify what the two endpoints of the line segment are, and whether it must pass through the centre. Working: a line joining any two points on the circumference, whether or not it passes through the centre, is a chord, and the diameter is just a special case of it. A student who answers diameter has wrongly assumed the line must pass through the centre. A student who answers radius has confused joining two circumference points with joining the centre to the circumference. A student who answers tangent has confused a line crossing through the circle with one that only touches its outside. Answer: chord.
- (d) 0.420 — Method: use the relative frequency worked out from the larger number of trials as the best estimate of the probability, since a bigger sample tends to sit closer to the true probability. Working: 84 out of 200 drops land open end up, so the relative frequency from the total is 84 ÷ 200 = 0.420. Answer: 0.420. Watch out: writing down 0.650 comes from 13 ÷ 20, using only the first, much smaller sample instead of the total. Writing down 0.535 comes from averaging 0.650 and 0.420, treating the 20-drop run and the 200-drop run as equally reliable instead of using the larger sample on its own. And writing down 0.580 comes from 1 − 0.420, working out the probability that the bottle top lands the other way up instead of open end up.
- (a) 2 × 3² × 5 — Method: divide repeatedly by the smallest prime number until only prime factors remain. Working: 90 ÷ 2 = 45, 45 ÷ 3 = 15, 15 ÷ 3 = 5, and 5 is prime, so 90 = 2 × 3 × 3 × 5, written as 2 × 3² × 5. 2 × 3 × 15 stops before the 15 is broken down into 3 × 5, so it is not fully factorised. 3 × 3 × 10 stops before the 10 is broken down into 2 × 5. 2 × 45 stops after only one division. Answer: 2 × 3² × 5.
- (b) 20 — a²b means a² multiplied by b: a² = 2² = 4, and 4 × 5 = 20. Reading the expression as (ab)² instead of a²b gives (2 × 5)² = 100. Squaring b instead of a, 2 × 5² = 50, squares the wrong letter. Adding a² and b instead of multiplying them, 2² + 5 = 9, uses the wrong operation.
- (a) 4 days — Method: the fence is a fixed amount of work, so builders × days is constant; find that product and divide it by the new number of builders. Working: 3 × 12 = 36 builder-days of work, so with 9 builders the time is 36 ÷ 9 = 4 days. Answer: 4 days. The distractors: 6 days comes from halving the 12 days because there are more builders, rather than dividing by the factor of 3 by which the workforce has grown; 36 days is the constant product of builders and days, given as a number of days instead of being shared between the builders; 9 days comes from taking 3 days off the 12, treating three extra builders as three fewer days, which is additive rather than proportional.
- (a) 151 cm³ — Volume of the cone = 1/3 × 3.14 × 3² × 10 = 94.2 cm³. Volume of the hemisphere = 1/2 × (4/3 × 3.14 × 3³) = 1/2 × 113.04 = 56.52 cm³. Total volume = 94.2 + 56.52 = 150.72 cm³, which rounds to 151 cm³. A student who uses a full sphere instead of a hemisphere gets 94.2 + 113.04 = 207.24 cm³, rounding to 207. A student who uses a cylinder instead of a cone for the base, forgetting the 1/3, gets 3.14 × 3² × 10 = 282.6 cm³, plus the hemisphere's 56.52 cm³, totalling 339.12 cm³, rounding to 339.
- (a) 1/16 — Method: terms can only be subtracted once they share a denominator, so write every term over the largest denominator, 16, and then subtract the numerators in order from left to right. Working: 1 = 16/16, 1/2 = 8/16, 1/4 = 4/16 and 1/8 = 2/16, so the numerators give 16 − 8 − 4 − 2 − 1 = 1, over a denominator of 16. Answer: 1/16. The distractors: 1/8 comes from stopping one term early, after 16 − 8 − 4 − 2 = 2; 3/16 comes from a sign slip on the last term, adding it instead of subtracting it, which gives 2 + 1 = 3; 15/16 comes from working from the right-hand end as though the last four terms were bracketed together, so that only a single sixteenth is taken away from 1.
- (d) L/6 − 4 — Method: find the length of one equal piece first (divide by 6), then apply the later change (subtract 4) to that piece. Working: one piece is L/6 metres; removing 4 metres from it gives L/6 − 4. Answer: L/6 − 4. L/6 + 4 comes from adding the 4 metres instead of removing it. (L − 4)/6 comes from removing the 4 metres from the whole rope before cutting it into pieces, the wrong order. 4 − L/6 comes from subtracting the piece length from 4 instead of the other way round.
- (b) 4 : 25 — For similar shapes, the ratio of areas is the ratio of lengths squared: 2² : 5² = 4 : 25. 2 : 5 comes from using the perimeter ratio itself as the area ratio, without squaring it at all. 8 : 125 comes from cubing each part instead of squaring (2³ : 5³) — cubing is the rule for volume, not area. 4 : 5 comes from squaring only the first part of the ratio (2² = 4), and leaving the second part unsquared.
- (d) 5 — Method: the greatest number of identical bunches is the highest common factor of the two flower totals; then divide the red roses by that number of bunches. Working: 60 = 2² × 3 × 5 and 84 = 2² × 3 × 7, so their highest common factor is 2² × 3 = 12. That means 12 bunches, and 60 ÷ 12 = 5 red roses in each. 7 is the number of white roses in each bunch, since 84 ÷ 12 = 7, not red roses. 12 is the number of bunches itself, not the number of red roses in one bunch. 20 comes from working out 60 ÷ 3 = 20, dividing by only part of the highest common factor. Answer: 5.
- (b) 1:200000 — '1 cm represents 2 km' means 1 cm on the map is 2 km in real life. Convert 2 km into centimetres, the same unit as the 1: 2 km = 2000 m = 200 000 cm. So the scale is 1 : 200 000. Converting only as far as metres gives 1 : 2000 — the conversion to centimetres was never finished. Losing a zero in the conversion gives 1 : 20 000, ten times too small. Writing 1 : 2 without converting units at all compares 1 cm to 2 km directly, which is not a valid ratio since the units do not match.
How the 20 questions are shared out
- Number — 5 questions (25% of the qualification)
- Algebra — 4 questions (20% of the qualification)
- Ratio, proportion and rates of change — 5 questions (25% of the qualification)
- Geometry and measures — 3 questions (15% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.