Sample paper · GCSE Foundation · grades 1–5
GCSE Foundation sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Foundation qualification — number 25%, algebra 20%, ratio, proportion and rates of change 25%, geometry and measures 15%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 50% / 25% / 25%.
CalculatorGCSE Foundation
GCSE Foundation sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- 1.Work out the value of √(16 + 9)
- 2.A cafe sells coffees at £c each and pastries at £p each. Three coffees and two pastries cost £9.60. Two coffees and two pastries cost £7.60. Work out the price of one coffee.
- 3.A post 2 metres tall casts a shadow 3 metres long. At the same time a nearby tree casts a shadow 12 metres long. Work out the height of the tree.
- 4.Work out the gradient of the line segment joining A(2, 3) and B(6, 11).
- 5.The probability that Priya's dentist appointment overruns is 0.35. Work out the probability that it does not overrun.
- 6.A scatter graph has 12 plotted points. Four pupils each draw a line of best fit on the same graph and count how many of the 12 points lie above their line and how many lie below it: Amir — 10 above, 2 below. Priya — 6 above, 6 below. Kofi — 2 above, 10 below. Leah — 0 above, 12 below. Write down the name of the pupil whose line was drawn correctly, so that the points are roughly balanced above and below it.
- 7.Work out (2/3)² + (1/2)². Give your answer as a fraction.
- 8.A car's fuel tank contains 50 litres when it starts a journey. After travelling for 2 hours, it contains 38 litres, and fuel is used at a constant rate. Work out the rate at which fuel is used, in litres per hour.
- 9.y is directly proportional to x, so y = kx. When x = 2, the value of y is 10. Work out the value of k.
- 10.The top of a clock tower is 25 m above level ground. Oliver stands on the ground 25 m from the foot of the tower. Work out the angle of elevation of the top of the tower from the point where Oliver stands.
- 11.A two-way table records how 130 pupils travel to school. 70 of the pupils are girls and the rest are boys. 42 of the girls walk to school and the rest of the girls cycle. 33 of the boys walk to school. Work out what fraction of the girls walk to school.
- 12.A charity raises money from a raffle and a cake sale in the ratio 5 : 3. Altogether the charity raises £320. Work out how much money the cake sale raised.
- 13.A sequence has the position-to-term rule: the term is the square of the position number. Its first four terms are 1, 4, 9, 16. Work out the 10th term.
- 14.A cleaning solution is made by mixing disinfectant and water in the ratio 1 : 9. Priti wants to make 6 litres of the solution in total. Work out how much disinfectant she needs.
- 15.A patio plan states: 'Side AB of the patio is parallel to side DC, and AB is longer than DC. Sides BC and AD are not parallel to each other and are not equal in length.' The four sides measure AB = 5.1 m, BC = 3.2 m, DC = 2.8 m and AD = 4.5 m. The tiler needs to order edging strip only for the sides that are not parallel to any other side. What total length of edging strip, in metres, should the tiler order?
- 16.Work out how many factors 36 has.
- 17.Write down the coordinates of the point where the line y = 2x + 4 crosses the y-axis.y = 2x + 4
- 18.A photo is enlarged so that its new width is 1.4 times its original width. Write the multiplier that would scale the new width back down to the original width, as a fraction in its simplest form.
- 19.A charity trek covers 830 miles over roughly 19 days. By rounding each number to 1 significant figure, work out an estimate for the number of miles walked per day.
- 20.Paint costs £14.40 for every 20 m² of wall it covers. Assuming the same rate, work out the cost of the paint needed to cover 56 m² of wall.
Answer key
- (a) 5 — 16 + 9 = 25, then √25 = 5. Splitting the root over the addition instead gives √16 = 4 and √9 = 3, then 4 + 3 = 7 — but a root does not split over a sum like this. Multiplying those two roots instead of adding them gives 4 × 3 = 12. Taking the negative square root instead of the positive one gives −5.
- (b) £2.00 — Subtracting the second equation from the first eliminates the pastries: (3c + 2p) − (2c + 2p) = 9.60 − 7.60, so c = 2.00. A candidate who divides the first total by the number of coffees alone, ignoring the pastries, would get 9.60 ÷ 3 = £3.20. A candidate who finds the price of a pastry instead of a coffee — using c = 2.00 in 2c + 2p = 7.60 to get p = 1.80 — would answer £1.80. A candidate who reaches the correct difference of £2.00 but then mistakenly divides again or misplaces the decimal point would get £0.20.
- (c) 8 m — Method: in the same sunlight every object has its height and its shadow in the same ratio, so write 2:3 = h:12, find the multiplier that takes 3 to 12 and apply it to the height. Working: 12 ÷ 3 = 4, so the tree's shadow is 4 times the post's shadow; the height must be scaled by the same 4, giving 4 × 2 = 8 m. Answer: 8 m. The distractors: 18 m comes from setting up the proportion upside down, 12 ÷ 2 × 3, which scales by shadow over height instead of height over shadow; 24 m comes from multiplying the 12 m shadow by the post's height of 2 m and never dividing by the post's shadow of 3 m; 4 m is the scale factor 12 ÷ 3, given as a length instead of being used to scale the 2 m post.
- (a) 2 — Gradient = (change in y) ÷ (change in x) = (11 − 3) ÷ (6 − 2) = 8 ÷ 4 = 2. "0.5" comes from dividing the change in x by the change in y the wrong way round: 4 ÷ 8. "8" is only the change in y, forgetting to divide by the change in x at all. "−2" comes from a sign error, as if the y-coordinate had decreased rather than increased.
- (c) 0.65 — Overrunning and not overrunning are exhaustive: between them they cover every outcome, so their probabilities sum to 1. Work out 1 − 0.35 = 0.65. Writing 0.35 again is the probability that the appointment overruns, not its complement — the subtraction was never done. Adding instead of subtracting gives 1 + 0.35 = 1.35, which cannot be a probability at all. Subtracting each digit from 10 instead of borrowing from the 1, so 10 − 3 = 7 tenths and 10 − 5 = 5 hundredths, gives 0.75.
- (a) Priya — A line of best fit should be drawn so that the plotted points are roughly balanced above and below it. Work out the difference between the two counts for each pupil: Amir 10 − 2 = 8; Kofi 10 − 2 = 8 (10 below and 2 above); Leah 12 − 0 = 12; Priya 6 − 6 = 0. Priya's line has the smallest difference, an exact balance of 6 above and 6 below, so her line is drawn correctly. Amir's line has 10 of the 12 points above it, so it is drawn too low. Kofi's line has 10 of the 12 points below it, so it is drawn too high. Leah's line has every single point below it, so it is not a line of best fit at all.
- (c) 25/36 — Method: square a fraction by squaring its numerator and its denominator separately, then add the two results over a common denominator. Working: (2/3)² = 4/9 and (1/2)² = 1/4; the lowest common denominator of 9 and 4 is 36, so 4/9 = 16/36 and 1/4 = 9/36, and 16 + 9 = 25. Answer: 25/36. The distractors: 49/36 comes from adding the two fractions first and squaring the total, giving (7/6)²; 5/13 comes from squaring correctly but then adding the numerators and the denominators, as (4 + 1)/(9 + 4); 7/3 comes from doubling each fraction instead of squaring it, giving 4/3 + 1.
- (c) 6 — Method: rate = amount of fuel used ÷ time taken. Working: fuel used = 50 − 38 = 12 litres, time taken = 2 hours, so rate = 12 ÷ 2 = 6 litres per hour. Answer: the rate is 6 litres per hour. 44 comes from finding the average of the two fuel amounts, (50 + 38) ÷ 2, instead of the fuel used. 12 comes from working out the fuel used but forgetting to divide by the time taken. 19 comes from dividing the remaining fuel, 38, by the time taken instead of the fuel used.
- (d) 5 — Method: rearrange y = kx to make the constant the subject, then substitute the pair of values given. Working: k = y ÷ x, so k = 10 ÷ 2 = 5. Answer: 5. The distractors: 20 comes from multiplying 10 by 2 instead of dividing, which is the rearrangement done the wrong way round; 12 comes from adding the pair, 10 + 2, treating the relationship as y = x + k; 8 comes from working out 10 − 2, the same additive reading with the operation reversed.
- (c) 45° — Method: the tower, the ground and the line of sight form a right-angled triangle in which the 25 m height is opposite the angle of elevation and the 25 m along the ground is adjacent to it, so use tan θ = opposite ÷ adjacent. Working: tan θ = 25 ÷ 25 = 1, so θ = tan⁻¹(1). Answer: 45°. The distractors: 90° comes from using sin θ = 25 ÷ 25 = 1, which treats the 25 m along the ground as the hypotenuse when it is the side next to the angle; 1° comes from writing down the value of tan θ as though it were the angle itself; 50° comes from adding the two given lengths, 25 + 25, instead of comparing them.
- (b) 3/5 — The question asks about the girls only, so use the girls' total of 70 as the denominator: 42 out of 70 girls walk, giving 42/70 = 3/5. Choosing 21/65 comes from using the whole survey of 130 pupils as the denominator instead of just the 70 girls, 42/130 = 21/65. Choosing 33/70 comes from using the boys' walking count, 33, over the girls' total of 70, mixing up the two rows of the table. Choosing 2/5 comes from using the number of girls who CYCLE, 70 − 42 = 28, instead of the number who walk, giving 28/70 = 2/5.
- (d) £120 — Total parts = 5 + 3 = 8, so one part is worth 320 ÷ 8 = 40 pounds. The cake sale is 3 parts, so it raised 3 × 40 = 120 pounds. £200 comes from working out the raffle's share, 5 × 40, instead of the cake sale's share. £40 comes from finding the value of one part but forgetting to multiply by 3. £192 comes from dividing the total by 5 instead of 8 to find the value of one part, 320 ÷ 5 = 64, then multiplying by 3, 3 × 64 = 192.
- (c) 100 — Method: apply the position-to-term rule straight to the position asked for, since it does not depend on the term before it. Working: the rule squares the position number and the position is 10, so the term is 10², which means 10 × 10. Answer: 100. The distractors: 81 comes from squaring 9 instead of 10, one position short; 20 comes from multiplying the position by 2 instead of squaring it; 1000 comes from cubing the position, 10 × 10 × 10, instead of squaring it.
- (a) 0.6 litres — The ratio 1 : 9 means the solution has 1 + 9 = 10 equal parts in total. Each part is 6 ÷ 10 = 0.6 litres, and disinfectant is 1 part, so Priti needs 0.6 litres of disinfectant. Giving 0.667 litres divides by 9, the number of parts of water, instead of the total number of parts, 10 (6 ÷ 9 ≈ 0.667). Giving 6 litres is the total amount of solution, not just the disinfectant's share of it. Giving 5.4 litres works out the water's share (6 × 9 ÷ 10 = 5.4), not the disinfectant's.
- (a) 7.7 m — AB is parallel to DC, so those two sides are each parallel to another side. BC and AD are stated to be not parallel to each other, so neither one is parallel to any other side — these are the two sides that need edging. Adding these: 3.2 + 4.5 = 7.7 m, so 7.7 m is correct. 7.6 m comes from an arithmetic slip when adding 3.2 and 4.5. 15.4 m comes from doubling the correct total, mistakenly assuming edging strip is needed along both faces of each side. 4.5 m comes from using only the longer of the two non-parallel sides and forgetting to add the shorter one.
- (d) 9 — List all the factors of 36 in pairs that multiply to give 36: 1 × 36, 2 × 18, 3 × 12, 4 × 9, and 6 × 6. This gives the factors 1, 2, 3, 4, 6, 9, 12, 18 and 36 — nine factors in total, with 6 counted only once even though it appears in a pair with itself. Forgetting that 36 is itself a factor of 36 and leaving it off the list gives 8. Counting the number of factor pairs, five of them, rather than the number of individual factors gives 5. Treating the repeated pair 6 × 6 as two separate factors, 6 and 6 again, gives 10 instead of 9. So 36 has 9 factors.
- (d) (0, 4) — Method: in the form y = mx + c the constant c is the y-coordinate of the point where the line crosses the y-axis, and every point on that axis has x-coordinate 0. Working: comparing y = 2x + 4 with y = mx + c gives c = 4, and substituting x = 0 confirms y = 2 × 0 + 4 = 4, so the crossing point is (0, 4). Answer: (0, 4). The distractors: (4, 0) is the same pair of numbers written in the wrong order and is a point on the x-axis; (0, 2) comes from reading the gradient 2 as the intercept, confusing m with c; (−2, 0) is where the line crosses the x-axis, found by solving 0 = 2x + 4 instead.
- (b) 5/7 — The enlargement multiplier is 1.4, which as a fraction is 7/5. To reverse an enlargement, use the reciprocal of the multiplier: flip 7/5 to get 5/7. 7/5 comes from using the enlargement multiplier again, instead of reversing it. 3/5 comes from treating the reverse as 'give back the extra amount', working out 1 − (1.4 − 1) = 0.6, instead of using the reciprocal. 5/2 comes from ignoring the whole number in 1.4 and inverting only the decimal part, 0.4, as if it were the whole multiplier.
- (d) 40 miles — Method: round each number to 1 significant figure first, then divide to estimate the daily distance. Working: 830 rounds to 800, and 19 rounds to 20, and 800 ÷ 20 = 40, so the estimate is 40 miles per day. 41.5 miles comes from rounding only the number of days and working out 830 ÷ 20 = 41.5, without rounding the distance too. 830 miles is the total distance for the whole trek, given as the answer without dividing by the number of days at all. 4 miles comes from working out 80 ÷ 20 = 4, misplacing a digit in the rounded distance. Answer: 40 miles.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
How the 20 questions are shared out
- Number — 5 questions (25% of the qualification)
- Algebra — 4 questions (20% of the qualification)
- Ratio, proportion and rates of change — 5 questions (25% of the qualification)
- Geometry and measures — 3 questions (15% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.