Sample paper · GCSE Foundation · grades 1–5
GCSE Foundation sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Foundation qualification — number 25%, algebra 20%, ratio, proportion and rates of change 25%, geometry and measures 15%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 50% / 25% / 25%.
CalculatorGCSE Foundation
Answer key: GCSE Foundation sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- (b) 2/5 — The statement compares girls with boys, so girls : boys = 2 : 3. The club is therefore 2 + 3 = 5 equal shares and the girls take 2 of them, so 2/5 of the members are girls. 2/3 repeats the part-to-part fraction the question gives, 3/5 is the fraction that are boys, and 1/3 comes from treating 2/3 as a fraction of the whole club and taking what is left.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (c) (−35, −55) — Add the three stages component by component to find the drone's position relative to base: (30+(−10)+15, 40+20+(−5)) = (35, 55). The flight back to base is the negative of this vector, reversing both numbers: (−35, −55). (35, 55) is the vector from base to the drone's position — it forgets to reverse direction for the return flight. (−35, 55) only reverses the top number. (35, −55) only reverses the bottom number.
- (d) 75% — Method: count how many cards are not hearts, write that count over the total number of cards, cancel the fraction down and then turn it into a percentage. Working: 52 − 13 = 39 cards are not hearts, so the probability is 39/52; dividing the numerator and the denominator by 13 gives 3/4, and 3/4 = 0.75, so 0.75 × 100 = 75. Answer: 75%, three quarters of the way along the 0 to 1 scale. The distractors: 25% comes from giving the probability that the card is a heart, 13 out of 52, which cancels to 1/4; 50% comes from reading 'not a heart' as 'not a red card' and halving the pack; 39% comes from writing the count of 39 cards straight down as the percentage without comparing it with the 52 cards in the pack.
- (b) All 2,000 members of the sports centre. — Method: in a survey, the population is the whole group the survey is trying to find out about, and the sample is the smaller group actually asked. Working: this survey wants to know what the sports centre's members think, so the population is every one of the 2,000 members — whether or not they were personally asked. Saying the population is the 100 members who were asked names the sample, not the population; the sample is drawn FROM the population, so it is smaller than it, not the same as it. Saying the population is everybody who lives in Ipswich widens the group far beyond who the survey is actually about — plenty of Ipswich residents are not members of the sports centre at all, so they are outside this survey altogether. Saying the population is the members who say they are unhappy confuses the population with a result of the survey: whether a member turns out to be happy or unhappy is something the survey finds out, not part of the definition of who is being studied. The population is always the whole group the question is about, before any sampling or any results come in.
- (a) They cannot both be describing the same path — Jon's measurement means the true length, l, satisfies 11.5 m ≤ l < 12.5 m. Mia's measurement means the true length satisfies 12.55 m ≤ l < 12.65 m. These two ranges do not overlap, so the two measurements cannot both be describing the same path. 'They must both be describing the same path' ignores that the two ranges do not overlap at all. 'Jon's measurement must be wrong' wrongly assumes Jon is the one at fault, when the mismatch does not show which measurement, if either, is wrong. 'Mia's measurement must be wrong' makes the same unjustified assumption in the other direction.
- (a) x/5 — Read the decimal as a fraction first: 0.2 is 2 tenths, so the coefficient is 2/10. Dividing the numerator and the denominator by 2 cancels this to 1/5, and a coefficient of 1/5 in front of a letter is written x/5. Reading the digit 2 as 'a half' gives x/2; reading 0.2 as 1/20 gives x/20; dividing only the denominator by 2 leaves 2/5, which is the coefficient 0.4 and twice as large as it should be.
- (d) 8 — The product of price and number of tickets is constant: k = 4 × 12 = 48. At £6 per ticket, the number of tickets is 48 ÷ 6 = 8. Getting 18 comes from treating price and tickets as directly proportional and working out 12 × 6 ÷ 4 instead of dividing k by the new price. Getting 12 assumes the number of tickets does not change when the price changes. Getting 6 comes from writing down the new price instead of working out the number of tickets.
- (c) minor segment — A chord splits a circle into two segments; the smaller of the two is called the minor segment and the larger one the major segment. "major segment" names the larger region, the opposite of what is asked for. "sector" is a different region altogether, enclosed by two radii and an arc, not by a chord. "arc" is a curved length along the circumference, not an enclosed region at all.
- (c) 30 — The numbers less than 4 are 1, 2 and 3, so the probability of that event is 3/6, and the expected count in 90 rolls is 90 × 3/6 = 45. The probability of rolling a 6 is 1/6, and the expected count is 90 × 1/6 = 15. The difference between the two expected counts is 45 − 15 = 30. A candidate who answers 45 has given the expected count for 'less than 4' only, forgetting to subtract the other expected count. A candidate who answers 15 has given the expected count for '6' only. A candidate who answers 36 has used a dice with 5 possible numbers instead of 6, giving 90 × 3/5 = 54 and 90 × 1/5 = 18, a difference of 36.
- (a) 200 g — One quarter of 160 g is 40 g. Increasing the amount means adding this on: 160 + 40 = 200 g. Finding the increase, 1/4 of 160 = 40 g, but stopping there without adding it to the original amount leaves just 40 g. Using 4/5 instead of 5/4 as the scaling fraction, 160 × 4/5 = 128 g, actually decreases the amount rather than increasing it. Increasing by a half instead of a quarter, 160 + 80 = 240 g, uses the wrong fraction of 160.
- (b) −3 — Method: the gradient of a straight line is the change in y divided by the change in x, with the two coordinates taken in the same order in the numerator as in the denominator. Working: going from (−1, 5) to (3, −7), the change in y is −7 − 5 = −12 and the change in x is 3 − (−1) = 4, so the gradient is −12 ÷ 4 = −3. Answer: −3. The distractors: 3 comes from subtracting the y-coordinates in one order and the x-coordinates in the other, giving 12 ÷ 4; −1/3 comes from dividing the change in x by the change in y instead of the other way round, giving 4 ÷ (−12); −6 comes from working out 3 − (−1) as 3 − 1 = 2, so that the change in y is divided by 2 rather than by 4.
- (b) 48 m² — Method: lengths are multiplied by the scale factor, but areas are multiplied by its square. Working: 1 cm on the plan stands for 200 cm = 2 m, so 1 cm² on the plan stands for 2 × 2 = 4 m², and 12 × 4 = 48. Answer: 48 m². The distractors: 24 m² comes from scaling the area by the length factor 2 instead of by its square; 2400 m² comes from multiplying the area by the scale 200 as though it were a length; 4800 m² comes from working in centimetres, 12 × 200² = 480 000 cm², and then dividing by 100 instead of by 10 000 to reach square metres.
- (c) 151,200 cm² — First find the area in m²: 4.2 × 3.6 = 15.12 m². To convert m² to cm², multiply by 10,000, since 1 m² = 100 cm × 100 cm = 10,000 cm²: 15.12 × 10,000 = 151,200 cm². 15.12 cm² gives the area in m² without converting the units at all. 1,512 cm² multiplies by 100 instead of 10,000, treating the conversion as if it were for a single length rather than an area. 15,120 cm² multiplies by 1,000 instead of 10,000.
- (a) 0 — Method: BIDMAS works through the index first, then the multiplication, then the subtraction. Working: 5² = 25, then 4 × 25 = 100, and finally 100 − 100 = 0. Answer: 0. The distractors: 2400 comes from working from left to right and subtracting first, giving (100 − 4) × 25 = 96 × 25 = 2400; −300 comes from multiplying before applying the index, giving (4 × 5)² = 20² = 400 and then 100 − 400 = −300; 60 comes from reading 5² as 5 × 2 = 10, so that 4 × 10 = 40 and 100 − 40 = 60.
- (a) 36 — Square numbers are n² for n = 1, 2, 3, ...; the fifth term, 25, is 5². The sixth square number is 6² = 36. A candidate who mislabels 25 as the sixth square number would compute 7² = 49 instead. A candidate who repeats an earlier difference between terms (5, from 4 to 9) rather than the correct next difference (11, since the differences are the odd numbers 3, 5, 7, 9, 11) would reach 30. A candidate who instead adds 10 would reach 35.
- (d) £82.50 — Find the hourly rate: £52.50 ÷ 7 = £7.50 per hour. For 11 hours: 11 × £7.50 = £82.50. £30 comes from working out the pay for only the extra 4 hours (4 × £7.50), and forgetting to include the original £52.50. £99 comes from misremembering the hourly rate as £9 instead of £7.50, then 11 × £9. £56.50 comes from adding the extra number of hours (4) straight onto the pay in pounds (52.5 + 4), confusing hours with pounds.
- (c) > — Method: write both fractions with a common denominator so they can be compared directly. Working: −2/3 = −4/6. Comparing −4/6 and −5/6, −4 is greater than −5, so −4/6 is greater than −5/6. Answer: −2/3 > −5/6, so the symbol is >. < comes from treating the fraction with the larger numerator and denominator, 5/6, as the greater number, ignoring that both fractions are negative. = comes from assuming the fractions must be equal because they look similar in size. ≤ combines < (false) with = (false).
- (a) £9.00 — Rate of pay = total pay ÷ number of hours. £54 ÷ 6 = £9.00 per hour. £324.00 comes from multiplying the pay by the hours instead of dividing (£54 × 6). £0.11 comes from dividing the hours by the pay instead of the pay by the hours (6 ÷ 54). £48.00 comes from subtracting the hours from the pay (£54 − 6) instead of dividing.
How the 20 questions are shared out
- Number — 5 questions (25% of the qualification)
- Algebra — 4 questions (20% of the qualification)
- Ratio, proportion and rates of change — 5 questions (25% of the qualification)
- Geometry and measures — 3 questions (15% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.