Sample paper · GCSE Foundation · grades 1–5
GCSE Foundation sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Foundation qualification — number 25%, algebra 20%, ratio, proportion and rates of change 25%, geometry and measures 15%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 50% / 25% / 25%.
CalculatorGCSE Foundation
Answer key: GCSE Foundation sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- (c) 9/5 — Method: the area of a rectangle is its length multiplied by its width; the decimal product is then written over a power of ten and cancelled. Working: 24 × 75 = 1800, and 2.4 and 0.75 have three decimal places between them, so 2.4 × 0.75 = 1.8; the area of the panel is 1.8 square metres, which is eighteen tenths, so it can be written as 18/10, and dividing the numerator and the denominator by 2 gives 9 over 5. Answer: 9/5. The distractors: 4/5 comes from converting only the digits after the decimal point and losing the whole one, turning 1.8 into eight tenths; 63/20 comes from adding the two sides instead of multiplying them, giving 3.15; 9/50 comes from misplacing the decimal point in the product and writing 0.18, which cancels to 9 over 50.
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (b) £60 — £48 represents 100% − 20% = 80% of the original price. 1% = £48 ÷ 80 = £0.60, so 100% = £0.60 × 100 = £60.
- (a) 8.1 m — Multiply the length on the plan by the scale factor: 4.5 × 1.8 = 8.1, so the real length is 8.1 m. Choosing 6.3 m adds the two numbers instead of multiplying them (4.5 + 1.8 = 6.3). Choosing 2.5 m divides the plan length by the scale factor the wrong way round (4.5 ÷ 1.8 = 2.5) instead of multiplying. Choosing 9.0 m rounds the scale factor up to 2 before multiplying (4.5 × 2 = 9.0), losing the accuracy the 1.8 was giving.
- (b) 16 — Method: put the counts into a two-way table, complete the row totals, then subtract along the Year 11 row. Working: there are 60 students altogether and 35 are in Year 10, so the number in Year 11 is 60 − 35 = 25. Of those 25 students, 9 chose a sandwich, so the number who chose a hot meal is 25 − 9 = 16. Answer: 16 Year 11 students chose a hot meal. The distractors: 15 comes from subtracting along the Year 10 row instead, 35 − 20 = 15, which is the number of Year 10 hot meals; 25 is the Year 11 row total, written down before the sandwiches are taken off; 31 comes from working with the sandwich figures for the whole school, 60 − 20 − 9 = 31, which counts the Year 10 hot meals as well.
- (b) £11.00 — 1.5 × 6 = 9, and 9 + 2 = 11, so the estimated cost is £11.00. Choosing £9.00 stops after 1.5 × 6 = 9 and forgets to add the £2. Choosing £12.00 adds the mass and the constant first and then multiplies: 6 + 2 = 8, and 8 × 1.5 = 12.00. Choosing £13.50 swaps the gradient and the intercept, using y = 2x + 1.5 instead: 2 × 6 = 12, and 12 + 1.5 = 13.50.
- (a) 91 is not prime, because 91 = 7 × 13. — Check 91 for prime factors up to its square root, which is just under 10: 91 ÷ 7 = 13, and both 7 and 13 are prime, so 91 = 7 × 13 and 91 is not a prime number. Checking only 2, 3 and 5 misses that 7 also needs to be tried — 91 is odd, its digits do not sum to a multiple of 3 (9 + 1 = 10), and it does not end in 0 or 5, so those three checks alone wrongly suggest it is prime. Assuming any odd number ending in 1 must be prime ignores that 91 = 7 × 13 is a counterexample. Misapplying the digit-sum test for 3 by miscounting 9 + 1 as a multiple of 3 wrongly concludes 91 is divisible by 3, when the correct digit sum, 10, is not a multiple of 3. So 91 is not prime, because 91 = 7 × 13.
- (c) x = 4 — Method: undo the addition of 1 first, then undo the multiplication by 2. Working: subtracting 1 from both sides gives 2x = 8, and dividing both sides by 2 gives x = 4. Answer: x = 4. The distractors: x = 8 comes from stopping at 2x = 8 and writing 8 as the value of x; x = 5 comes from adding 1 to both sides instead of subtracting it, giving 2x = 10; x = 16 comes from multiplying 8 by 2 instead of dividing by 2.
- (b) 25 m/s — Convert km/h to m/s by multiplying by 1000 (km to m) and dividing by 3600 (hours to seconds): 90 × 1000 ÷ 3600 = 25 m/s. Working out 90 ÷ 60 = 1.5 converts using 60, as if going from hours to minutes rather than to seconds. Working out 90 × 3.6 = 324 multiplies by 3.6 instead of dividing by it, going the wrong way between the units. Working out 90 × 1000 = 90000 converts kilometres to metres but forgets to convert hours to seconds at all. The train's speed is 25 m/s.
- (c) 1 — Method: the instruction states that a curved surface counts as a face, so count the surfaces of the sphere on that basis. Working: a sphere has exactly one continuous curved surface and no flat surfaces at all. A student who answers 0 has ignored the instruction and refused to count the curved surface. A student who answers 2 has confused the sphere with a cylinder, which has two flat circular faces. A student who answers 3 has imagined extra hidden surfaces that do not exist. Answer: 1 face.
- (b) 8/52 — Method: a card cannot be an ace and a king at the same time, so the two events are mutually exclusive and their probabilities are added, keeping the denominator the same. Working: P(ace) = 4/52 and P(king) = 4/52, so P(ace or king) = 4/52 + 4/52, and 4 + 4 = 8 fifty-seconds. Answer: 8/52. The distractors: 4/52 comes from giving the probability of just one of the two events and forgetting to add the other; 16/52 comes from multiplying the two counts, 4 × 4, instead of adding them; 1/52 comes from giving the probability of one particular named card rather than any of the eight.
- (a) to the nearest centimetre — Method: the error interval of a rounded measurement runs from half a unit below the stated value to half a unit above it, so the width of the interval is one whole unit of the accuracy used. Working: the interval runs from 24.5 to 25.5, a width of 25.5 − 24.5 = 1, so the unit of accuracy is 1 cm; the stated value is the midpoint, 25 cm, and 25 correct to the nearest centimetre is exactly what gives 24.5 ≤ L < 25.5. Answer: to the nearest centimetre. To the nearest 0.5 cm comes from reading the half-unit, 0.5, as the accuracy itself instead of doubling it back to the full unit. To 1 decimal place comes from seeing the bounds written with one decimal place and taking that as the accuracy, but the bounds of a value given to 1 decimal place would be only 0.05 either side. To the nearest 10 cm comes from confusing the size of the value, about 25, with the unit it was rounded to; rounding to the nearest 10 cm would give an interval 5 cm either side of the stated value.
- (b) No, because their gradients are 2 and −2 — Method: two lines are parallel exactly when their gradients are equal as signed numbers, so m is read from each equation written in the form y = mx + c and the two are compared. Working: y = 2x + 1 has gradient 2 and y = −2x + 3 has gradient −2; those are not equal, so the lines are not parallel, and indeed one slopes upwards while the other slopes downwards. Answer: No, because their gradients are 2 and −2. The distractors: saying yes because both gradients have size 2 comes from comparing the sizes of the gradients and ignoring their signs; saying yes because the gradients add to 0 comes from using a sum of zero as the test for parallel lines instead of equality of gradients; saying no because the y-intercepts are 1 and 3 reaches the right verdict by the wrong route, since the intercepts decide where the lines sit rather than whether they are parallel.
- (a) 1000m — Method: kilograms are a smaller unit than tonnes, so change tonnes into kilograms by multiplying by 1000. Working: m tonnes = m × 1000 kg = 1000m kg. So the expression is 1000m. Distractor m/1000 comes from dividing by 1000 instead of multiplying, which would make the number of kilograms smaller than the number of tonnes, the wrong way round. Distractor 1000 + m comes from adding the conversion factor instead of multiplying by it. Distractor m − 1000 comes from subtracting the conversion factor instead of multiplying by it.
- (b) 5 m — Method: the brace, the width and the height form a right-angled triangle in which the brace faces the right angle, so it is the hypotenuse and Pythagoras' theorem applies, a² + b² = c². Working: c² = 3² + 4² = 9 + 16 = 25, so c = √25 = 5. Answer: 5 m. The distractors: 7 m comes from adding the two sides, 3 + 4, instead of adding their squares; 25 m comes from stopping at c² = 25 and forgetting to take the square root; 12 m comes from multiplying 3 × 4, which gives the area of the gate in square metres and not a length across it.
- (a) = — Method: convert the fraction to a decimal so both numbers are in the same form. Working: 3/10 means 3 divided by 10, which is 0.3. Answer: 3/10 = 0.3, so the symbol is =. < comes from treating the fraction as smaller than the decimal without converting it first. > comes from the same mistake the other way round. ≠ comes from assuming a fraction and a decimal can never be equal.
- (c) 32 — Using the rule 3n + 4: the 3rd term is 3 × 3 + 4 = 13, and the 5th term is 3 × 5 + 4 = 19, so their sum is 13 + 19 = 32. Forgetting to add the 4 for the 3rd term, 3 × 3 = 9, and adding the correct 5th term, gives 9 + 19 = 28. Rounding the 19 up to 20 to make the addition easier and then forgetting to take the extra 1 back off, 13 + 20 = 33, gives 33. Using the rule 4n + 3 instead of 3n + 4 gives 4 × 3 + 3 = 15 and 4 × 5 + 3 = 23, summing to 38.
- (a) 675 ml — How much a jug holds is a volume, and volumes of similar solids scale with the cube of the length scale factor. The length scale factor is 12 ÷ 8 = 1.5, so the volume scale factor is 1.5 × 1.5 × 1.5 = 3.375. The larger jug holds 200 × 3.375 = 675 ml. Multiplying the scale factor by 3 instead of raising it to the power 3 is the mistake to guard against here.
- (c) £7.25 — Find the total cost of the books first: 3 × 4.25 = 12.75, so the books cost £12.75 in total. Subtract this from the £20 note: 20.00 − 12.75 = 7.25, so the change is £7.25. Stopping after finding the cost and not subtracting it from £20 gives £12.75, which is the amount spent, not the change. Borrowing correctly in the pence column but forgetting to reduce the pounds column by 1 gives £8.25 instead of £7.25. Multiplying 3 × 4.25 as 12.25 instead of 12.75, a multiplication slip, makes the change come out £0.50 too high, at £7.75. So Jack receives £7.25 change.
- (b) 2 : 5 — 40% as a fraction is 40/100 = 2/5, so a = (2/5)b, giving a : b = 2 : 5. Swapping the two numbers gives 5 : 2, which is the ratio b : a instead. Treating 40% as the fraction of the total (a + b) rather than of b alone gives a : (a + b) = 2 : 5, which rearranges to a : b = 2 : 3 — a different statement from the one in the question. Inverting that same mistaken ratio gives 3 : 2.
How the 20 questions are shared out
- Number — 5 questions (25% of the qualification)
- Algebra — 4 questions (20% of the qualification)
- Ratio, proportion and rates of change — 5 questions (25% of the qualification)
- Geometry and measures — 3 questions (15% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.