Sample paper · GCSE Foundation · grades 1–5
GCSE Foundation sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Foundation qualification — number 25%, algebra 20%, ratio, proportion and rates of change 25%, geometry and measures 15%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 50% / 25% / 25%.
CalculatorGCSE Foundation
Answer key: GCSE Foundation sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- (d) £120 — Total parts = 5 + 3 = 8, so one part is worth 320 ÷ 8 = 40 pounds. The cake sale is 3 parts, so it raised 3 × 40 = 120 pounds. £200 comes from working out the raffle's share, 5 × 40, instead of the cake sale's share. £40 comes from finding the value of one part but forgetting to multiply by 3. £192 comes from dividing the total by 5 instead of 8 to find the value of one part, 320 ÷ 5 = 64, then multiplying by 3, 3 × 64 = 192.
- (d) 5 — Each term is found by multiplying the previous term by the common ratio, 0.5: 80, 40, 20, 10, and the next term is 10 × 0.5 = 5. A candidate who instead subtracts the same amount each time (repeating the last difference of 10) would reach 10 − 10 = 0. A candidate who divides by 4 instead of by 2 would reach 10 ÷ 4 = 2.5. A candidate who multiplies by 2 instead of dividing (reversing the direction of the sequence) would reach 10 × 2 = 20.
- (b) £60 — £48 represents 100% − 20% = 80% of the original price. 1% = £48 ÷ 80 = £0.60, so 100% = £0.60 × 100 = £60.
- (c) 7.1 cm — Method: a shorter side is opposite the 45° angle and the hypotenuse is known, so sin θ = opposite ÷ hypotenuse gives that side directly. Working: sin 45° = x ÷ 10, so x = 10 × sin 45° = 7.071…, which is 7.1 to 1 decimal place. Answer: 7.1 cm. The distractors: 5.0 cm comes from halving the hypotenuse, which is the rule for the side opposite a 30° angle and not a 45° one; 14.1 cm comes from dividing by sin 45° instead of multiplying by it, which makes a shorter side longer than the hypotenuse; 10.0 cm comes from taking tan 45° = 1 and concluding that the shorter side matches the hypotenuse.
- (c) 2 — Set A, the multiples of 3, is {3, 6, 9}. Removing the numbers that are also in set B, the even numbers {2, 4, 6, 8, 10}, leaves {3, 9} — 2 numbers are in A but not B. Giving 3, the whole size of set A, forgets to remove the number 6, which is also even. Giving 7 counts every number in A or B combined, {2, 3, 4, 6, 8, 9, 10}, rather than only those in A but not B. Giving 4 counts the numbers in set B but not set A, {2, 4, 8, 10}, the wrong way round.
- (b) 74 marks — Method: the two groups are different sizes, so their means cannot simply be averaged — rebuild each group's total mark, add the totals and divide by all 50 pupils. Working: Group A scored 20 × 80 = 1600 marks and Group B scored 30 × 70 = 2100 marks, giving 1600 + 2100 = 3700 marks altogether, so the overall mean is 3700 ÷ 50 = 74 marks. Answer: 74 marks, which sits nearer to 70 than to 80 because the larger group scored 70. The distractors: 75 marks comes from averaging the two group means, (80 + 70) ÷ 2, as though the groups were the same size; 76 marks comes from attaching each mean to the other group's size, (20 × 70 + 30 × 80) ÷ 50; 150 marks comes from adding the two means together and never dividing at all.
- (a) 5 — Method: 10% is 10/100, which cancels to 1/10, so finding 10% of an amount means dividing it by 10. Working: 10% = 10/100 = 1/10, and 50 ÷ 10 = 5. Answer: 5 questions. The distractors: 10 comes from reading the 10% as a count of 10 questions rather than as an operator acting on the 50; 45 comes from working out how many questions Freya answers correctly, the other 90% of the quiz, instead of how many she gets wrong; 500 comes from multiplying by 10 instead of dividing by 10.
- (c) the fourth quadrant — Method: read the sign of each coordinate in turn, then count round the regions, which are numbered anticlockwise from the one where both coordinates are positive. Working: the x-coordinate 5 is positive, so A is to the right of the y-axis; the y-coordinate −3 is negative, so A is below the x-axis; right of the y-axis and below the x-axis is the fourth of the four regions. Answer: the fourth quadrant. The distractors: 'the first quadrant' comes from ignoring the minus sign on the y-coordinate and treating the point as (5, 3); 'the second quadrant' comes from writing the pair the wrong way round and locating (−3, 5) instead; 'the third quadrant' comes from assuming that any point with a negative coordinate belongs to the region where the minus signs are, without checking the other coordinate.
- (a) 35/32 — Work out each weekly total first. Last week: 5 × 7 = 35 hours. This week: 4 × 8 = 32 hours. Last week's total is being written as a fraction of this week's total, so last week goes on the top and this week goes on the bottom, giving 35/32. The two totals share no common factor, so the fraction cannot be cancelled. It is greater than 1, which says that Priya worked more hours last week than this week.
- (b) 18.84 m² — The pond has radius 2.5 m (half of the 5 m diameter), so the outer edge of the path has radius 2.5 + 1 = 3.5 m. Path area = area of outer circle − area of pond = 3.14 × 3.5² − 3.14 × 2.5² = 38.465 − 19.625 = 18.84 m².
- (c) 45 — Three of the ten numbers (8, 9 and 10) are greater than 7, so the probability is 3/10, and 150 × 3/10 = 45. Writing 105 is wrong because 150 × 7/10 = 105 uses the seven numbers that are NOT greater than 7 (1 to 7), the opposite of what is asked. Writing 60 is wrong because it counts 7, 8, 9 and 10 as four numbers greater than 7, wrongly including 7 itself: 150 × 4/10 = 60. Writing 50 is wrong because 150 ÷ 3 = 50 divides by the count of favourable numbers instead of multiplying by the correct fraction of the spinner. The expected number of spins landing on a number greater than 7 is 45.
- (c) < — Method: compare the two negative numbers by their position on a number line, not by the size of the digit. Working: −9 is nine places to the left of zero and −4 is four places to the left of zero, so −9 is further from zero in the negative direction, which makes it the smaller number. Answer: −9 < −4, so the symbol is <. > comes from comparing 9 and 4 as if both numbers were positive, ignoring the negative signs. = comes from treating both numbers as equal simply because they are both negative. ≥ combines > (false) with = (also false).
- (d) 7n − 2 — Method: find how much the total cost rises each month, then find the constant that fits the cost for one month. Working: the cost rises by £7 for each extra month (12 − 5 = 7, 19 − 12 = 7, 26 − 19 = 7), so the cost has the form 7n + c. Substituting n = 1: 7(1) + c = 5, so c = −2. Answer: the total cost in pounds is 7n − 2. The value 7n comes from leaving out the constant. The value 7n + 5 comes from using the cost of one month as the constant directly, without subtracting the monthly rise first. The value 5n + 7 comes from swapping the roles of the cost of one month, £5, and the monthly rise, £7 — using the cost of one month as the coefficient of n and the rise as the constant.
- (d) £6705 — After the first year: £6400 × 1.08 = £6912. After the second year: £6912 × 0.97 = £6704.64, which rounds to £6705 (nearest pound). £6720 comes from treating the +8% and −3% changes as a single net +5% change applied to the original amount instead of applying each change in turn: £6400 × 1.05 = £6720. £6912 comes from applying only the first year's growth and stopping there, without applying the second year's fall. £7104 comes from adding the two percentages together as +11% and applying that to the original amount instead of applying each change to the correct starting amount in turn: £6400 × 1.11 = £7104.
- (d) (1, −6) — Reflecting in the x-axis keeps the x-coordinate the same and changes the sign of the y-coordinate: (1, 6) → (1, −6). A pupil who reflects in the y-axis instead gets (−1, 6). A pupil who changes the sign of both coordinates gets (−1, −6). A pupil who forgets to change any sign leaves the point unmoved at (1, 6). The correct image is (1, −6).
- (c) 4 × 10⁴ — 8 ÷ 2 = 4, and 6 − 2 = 4, so each project receives 4 × 10⁴ pounds. Multiplying the exponents instead of subtracting them gives 6 × 2 = 12, so 4 × 10¹². Adding the exponents instead of subtracting them gives 6 + 2 = 8, so 4 × 10⁸. Subtracting the coefficients instead of dividing them gives 8 − 2 = 6, so 6 × 10⁴.
- (a) 0.25 — Method: gradient = vertical rise ÷ horizontal distance. Working: gradient = 3 ÷ 12 = 0.25. Answer: the gradient of the ramp is 0.25. 4 comes from inverting the gradient, dividing the horizontal distance by the vertical rise instead of the other way round. 9 comes from subtracting the rise from the horizontal distance instead of dividing. 36 comes from multiplying the rise and the horizontal distance instead of dividing.
- (b) 1500 — The rate is 3 ÷ 2 = 1.5 litres per minute. Converting to cm³: 1.5 × 1000 = 1500 cm³ per minute. Getting 3000 comes from converting 3 litres to cm³ first (3000 cm³) and forgetting to divide by the 2 minutes. Getting 750 comes from dividing by the 2 minutes a second time after converting (1500 ÷ 2). Getting 2000 comes from converting the 2 minutes as if it were litres (2 × 1000) instead of using the correct rate of 1.5 litres per minute.
- (d) 11/12 — Convert both mixed numbers to improper fractions with a common denominator. 2 3/4 = 11/4, which is 33/12, and 1 5/6 = 11/6, which is 22/12. Subtracting, 33/12 − 22/12 gives 11/12, already in its simplest form. Forgetting to borrow, and instead subtracting the fraction parts the other way round to avoid a negative, 10/12 − 9/12 gives 1/12; adding that to the whole-number difference of 1 gives 13/12. Subtracting only the fraction parts, 9/12 − 10/12, and reporting just the size of that difference gives 1/12, which ignores the whole numbers altogether. Adding the two improper fractions instead of subtracting them, 33/12 + 22/12, gives 55/12. So 2 3/4 − 1 5/6 = 11/12.
- (b) 48 m² — Method: lengths are multiplied by the scale factor, but areas are multiplied by its square. Working: 1 cm on the plan stands for 200 cm = 2 m, so 1 cm² on the plan stands for 2 × 2 = 4 m², and 12 × 4 = 48. Answer: 48 m². The distractors: 24 m² comes from scaling the area by the length factor 2 instead of by its square; 2400 m² comes from multiplying the area by the scale 200 as though it were a length; 4800 m² comes from working in centimetres, 12 × 200² = 480 000 cm², and then dividing by 100 instead of by 10 000 to reach square metres.
How the 20 questions are shared out
- Number — 5 questions (25% of the qualification)
- Algebra — 4 questions (20% of the qualification)
- Ratio, proportion and rates of change — 5 questions (25% of the qualification)
- Geometry and measures — 3 questions (15% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.