Sample paper · GCSE Foundation · grades 1–5
GCSE Foundation sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Foundation qualification — number 25%, algebra 20%, ratio, proportion and rates of change 25%, geometry and measures 15%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 50% / 25% / 25%.
CalculatorGCSE Foundation
Answer key: GCSE Foundation sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- (b) 1 : 2 — 2/5 of 50 is 20, so there are 20 red counters and 50 − 20 = 30 blue counters. Taking 5 red counters out leaves 15 red and 30 blue, so red : blue = 15 : 30. Dividing both parts by 15 gives 1 : 2. 2 : 3 is the ratio before any counters are removed, 2 : 1 has the two parts the wrong way round, and 4 : 5 comes from taking the 5 counters out of the blue instead of the red.
- (a) It touches the x-axis once, only at x = 4. — (x − 4)² is a square, so it equals zero only when x − 4 = 0, that is at x = 4 — the curve just touches the x-axis there rather than crossing it, since a square cannot be negative on either side to cross through. Saying it crosses at x = 4 and x = −4 wrongly introduces a plus-or-minus, as if taking a square root of x, rather than recognising the bracket is already squared and only zero once. Saying it never touches the x-axis forgets that a squared term CAN equal zero, even though it can never be negative. Saying it crosses at x = 2 and x = −2 confuses (x − 4)² with the different expression x² − 4.
- (a) 8/5 — Scaling down from 8 people to 5 people uses the multiplier 5/8. To reverse this and scale back up from 5 people to 8 people, use the reciprocal of that multiplier: flip 5/8 to get 8/5. 5/8 comes from using the forward (scaling down) multiplier again, instead of reversing it. 3/5 comes from writing the difference in people (8 − 5 = 3) over 5, instead of using the reciprocal of 5/8. 25/64 comes from multiplying the forward multiplier by itself (5/8 × 5/8), instead of finding its reciprocal.
- (a) arc — A curved part of a circle's circumference, between two points, is called an arc. A chord is the straight line joining those two points, not the curved part. A segment is the region enclosed between a chord and an arc, and a sector is the region enclosed between two radii and an arc — both segment and sector are regions, not curved lengths.
- (b) 1/10 — Method: list every possible pair of subjects systematically, so that no pair is missed and no pair is counted twice, then compare the number of successful pairs with the size of the list. Working: pairing maths with each of the other four gives 4 pairs, physics with each subject after it gives 3, biology gives 2 and chemistry gives 1, so there are 4 + 3 + 2 + 1 = 10 pairs. Exactly one of them is maths with biology. Answer: the probability is 1/10. The distractors: 1/5 comes from counting maths-then-biology and biology-then-maths as two separate successes while still dividing by the 10 unordered pairs; 1/15 comes from a list that also pairs each subject with itself, giving 15 entries instead of 10; 1/4 comes from working out the second step alone, that 1 of the 4 subjects left after maths is biology, without allowing for the chance that maths is picked at all.
- (d) 38, and fairly confident, as 12 °C is inside the range — Method: substitute the forecast temperature into the equation of the line of best fit, then judge the prediction by where that temperature sits among the data the line was drawn from. Working: putting x = 12 into y = −3x + 74 gives −3 × 12 + 74 = 38, so the line predicts 38 hot chocolates. The recorded temperatures run from 4 °C to 18 °C, and 12 °C lies inside that interval, so this is interpolation, the safer kind of prediction. Answer: 38, and fairly confident, as 12 °C is inside the range; the owner should still expect the true figure to differ a little, since the points only lie near the line and not on it. The distractors: being completely certain treats a line of best fit as a rule that fixes each day's sales, when it describes a trend that individual days depart from; saying 12 °C is outside the range misreads the interval 4 °C to 18 °C, and the wrong warning would be attached to a sound prediction; 110 comes from −3 × 12 being taken as +36, giving 36 + 74 = 110, which loses the negative gradient and so predicts that a warm day sells more hot chocolate than a cold one.
- (a) 8 litres per minute — Method: write the time as a decimal number of minutes, then divide the volume by the time. Working: 30 seconds = 30/60 minute = 0.5 minute, so 2 minutes 30 seconds = 2.5 minutes. Rate = 20 ÷ 2.5 = 8 litres per minute. Answer: 8 litres per minute. (10 litres per minute comes from ignoring the extra 30 seconds and dividing by 2 minutes only. 8.7 litres per minute comes from misreading 2 minutes 30 seconds as 2.3 minutes instead of 2.5 minutes. 0.125 litres per minute comes from dividing the time by the volume instead of the volume by the time.)
- (a) 27 — Method: let the smaller number be n, so the larger number is n + 9. Form the equation n + (n + 9) = 45. Working: simplify: 2n + 9 = 45, so 2n = 36, giving n = 18. The larger number is 18 + 9 = 27. Answer: 27. 18 is the smaller number, found correctly, but given as the answer to the question asking for the larger number. 22.5 comes from ignoring the "9 more" part and simply halving the total, 45 ÷ 2. 36 comes from a sign error when isolating the constant, treating the equation as 2n = 45 + 9 instead of 2n = 45 − 9.
- (c) 920 kg/m³ — Convert each unit in turn. Mass: 1 g = 0.001 kg. Volume: 1 m³ = 100 × 100 × 100 = 1 000 000 cm³. So a density of 0.92 g per cm³ is 0.92 × 1 000 000 = 920 000 g in every cubic metre, and 920 000 g = 920 000 × 0.001 = 920 kg. The two conversions leave a single factor of 1 000 000 × 0.001 = 1000, so in one step multiply g/cm³ by 1000: 0.92 × 1000 = 920 kg/m³. Multiplying by 100 instead of 1000 gives 92 kg/m³, using the factor for 1 m² rather than 1 m³ of volume. Multiplying by 10 instead of 1000 gives 9.2 kg/m³, moving the decimal point one place for a conversion that moves it three. Dividing by 1000 instead of multiplying gives 0.00092 kg/m³, going the wrong way between the units — a kilogram is heavier than a gram, but a cubic metre is a million times bigger than a cubic centimetre, so the number must get larger, not smaller. The liquid's density is 920 kg/m³.
- (d) All angles equal and all sides equal — Congruent triangles are identical in both shape and size, so every corresponding angle is equal and every corresponding side is equal, so 'all angles equal and all sides equal' is correct. 'All angles equal, sides may differ' describes 'similar' triangles, which have equal angles but sides in the same ratio rather than necessarily equal, not congruent ones. 'All sides equal, angles may differ' is not geometrically possible for triangles, since equal sides throughout force the angles to match too. 'Same area, angles and sides may differ' is wrong because equal area alone does not guarantee congruence; two triangles can share an area with completely different shapes.
- (a) 1/5 — Method: find the probability that the counter is black, then use the fact that an event and its complement add to 1. Working: there are 2 + 8 = 10 counters, so P(black) = 8/10 = 4/5; the complement is 1 − 4/5, and writing 1 as 5/5 gives 5/5 − 4/5. Answer: 1/5. The distractors: 4/5 comes from giving the probability that the counter is black instead of its complement; 1/2 comes from assuming the two colours are equally likely because there are only two of them; 1/4 comes from writing the 2 white counters over the 8 black counters rather than over all 10 counters.
- (d) 6 — Method: the square root of a product can be found either by multiplying first and then rooting, or by rooting each factor and multiplying the two roots together. Working: 4 × 9 = 36, and 6 × 6 = 36, so the root is 6; the same value comes from √4 × √9 = 2 × 3. Answer: 6. The distractors: 36 comes from multiplying inside the root and then leaving the root untaken; 5 comes from rooting each factor and adding the results, 2 + 3, instead of multiplying them; 18 comes from rooting the 4 only and leaving the 9 untouched, giving 2 × 9.
- (d) £16.70 — The mileage charge is 2.20 × 6 = £13.20. Adding the fixed fee: £13.20 + £3.50 = £16.70. A candidate who forgets the fixed fee gives just the mileage charge, £13.20. A candidate who adds the fixed fee to the per-mile rate before multiplying by the number of miles, (3.50 + 2.20) × 6, gets £34.20. A candidate who rounds £2.20 down to £2 gets 2 × 6 + 3.50 = £15.50.
- (c) 1.6 — The multiplier from tins to pounds is found by dividing the cost by the number of tins: £8 ÷ 5 = 1.6. 0.625 comes from dividing the wrong way round, tins ÷ cost (5 ÷ 8), which is the multiplier from pounds back to tins. 3 comes from subtracting the number of tins from the cost (8 − 5), instead of dividing. 40 comes from multiplying the cost by the number of tins (8 × 5), instead of dividing.
- (c) (3, 2) — For an enlargement centred on the origin, multiply every coordinate by the scale factor: (9 × 1/3, 6 × 1/3) = (3, 2). A pupil who multiplies by 3 instead of by 1/3 gets (27, 18). A pupil who subtracts a third of each coordinate instead of scaling by a third gets (9 − 3, 6 − 2) = (6, 4). A pupil who applies the scale factor to the x-coordinate only gets (3, 6). The correct image is (3, 2).
- (c) 150 m — Method: a fraction acts as an operator, so finding 3/7 of a length means dividing by the denominator and multiplying by the numerator. Working: 350 ÷ 7 = 50, so one seventh of the route is 50 m, and three sevenths is 50 × 3 = 150 m. Answer: 150 m. The distractors: 50 m comes from finding one seventh and stopping there instead of multiplying by 3; 1050 m comes from multiplying by the numerator without dividing by the denominator, giving 350 × 3 = 1050; 200 m comes from working out the stretch of the route the footpath does not run alongside, which is 4/7 of 350 m, instead of the stretch it does.
- (d) $y = 2x - 1$ — Method: pick two points the line passes through, work out the gradient as vertical change ÷ horizontal change, and read the y-intercept from where the line crosses the y-axis. Working: the line passes through (0, −1) and (1, 1), so the gradient is (1 − (−1)) ÷ (1 − 0) = 2, and it crosses the y-axis at −1. Answer: y = 2x − 1. Distractor refutation: y = 2x + 1 comes from reading the y-intercept as +1 instead of −1, misreading which side of the origin the line crosses. y = x − 1 comes from taking the gradient as 1, counting the same number of squares across and up instead of checking the rise is twice the run. y = −2x − 1 comes from a sign error on the gradient, treating the line as sloping downward from left to right when it actually rises.
- (d) 3 : 2 — Convert both amounts to pence: £3.60 = 360p and £2.40 = 240p, giving the ratio 360 : 240. Divide both parts by their highest common factor, 120, to get 3 : 2. Giving 360 : 240 has not been simplified at all. Giving 2 : 3 swaps the order. Giving 36 : 24 has been divided by 10, which is a common factor but not the highest one, so it is not yet in simplest form.
- (b) 2/7 — The comparison asked for is part with part, not part with whole, so the number of cars goes on the bottom. The ratio gives 2 shares of vans for every 7 shares of cars, so the vans are 2/7 of the cars. 2/9 uses the 9 shares in the whole car park as the denominator, 7/2 compares the cars with the vans, and 7/9 is the fraction of the vehicles that are cars.
- (c) Yes, correct, because 24 ÷ 8 × 3 = 9. — Method: divide the count you know by its ratio part to find the value of one part, then multiply by the part you want. Working: one part = 24 ÷ 8 = 3 counters, so green = 3 × 3 = 9 counters, and the student is correct. Dividing 24 by 3 instead of 8 gives 24 ÷ 3 × 8 = 64, the ratio parts the wrong way round. Stopping after 24 ÷ 8 = 3 gives 3, forgetting to multiply by the green ratio part. Adding 24 + 3 = 27 confuses adding a ratio part with scaling by it.
How the 20 questions are shared out
- Number — 5 questions (25% of the qualification)
- Algebra — 4 questions (20% of the qualification)
- Ratio, proportion and rates of change — 5 questions (25% of the qualification)
- Geometry and measures — 3 questions (15% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.