Sample paper · GCSE Foundation · grades 1–5
GCSE Foundation sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Foundation qualification — number 25%, algebra 20%, ratio, proportion and rates of change 25%, geometry and measures 15%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 50% / 25% / 25%.
CalculatorGCSE Foundation
Answer key: GCSE Foundation sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- (c) 5 — 0.2 = 1/5, and turning the fraction upside down gives the reciprocal 5/1 = 5. Writing −0.2 mistakes the reciprocal for the negative of the number. Working out 1 − 0.2 = 0.8 mistakes the reciprocal for subtracting the number from 1. Writing 0.5 is the reciprocal of 2, not of 0.2 — a place-value slip that drops the decimal, since 1 ÷ 0.2 = 5 while 1 ÷ 2 = 0.5.
- (d) 21 — The differences between consecutive triangular numbers increase by 1 each time: 3−1=2, 6−3=3, 10−6=4, 15−10=5. So the next difference is 6, giving 15+6=21. A candidate who keeps the difference the same as the previous step (adding 5 again) would reach 20. A candidate who uses a constant difference of 3 throughout would reach 18. A candidate who instead finds the square of the term number (5²=25, since 15 is the 5th term) would reach 25 — that is the rule for square numbers, not triangular numbers.
- (d) 3.75 — 45 minutes is 45 ÷ 60 = 0.75 of an hour, so 3 hours 45 minutes = 3.75 hours. Getting 3.45 comes from writing the minutes directly after the decimal point instead of converting them to a fraction of an hour. Getting 3.67 comes from misreading 45 minutes as 40 minutes and converting 40 ÷ 60 instead. Getting 4.15 comes from rounding 45 minutes up to the next whole hour and adding the remainder as if it were more minutes past that hour.
- (d) (−2, 0) — A 180° rotation about a centre (a, b) maps (x, y) to (2a − x, 2b − y). Here that gives (2 × 1 − 4, 2 × 1 − 2) = (−2, 0). A pupil who rotates about the origin instead of (1, 1) gets (−4, −2). A pupil who adds the centre's coordinates instead of applying the rotation formula gets (4 + 1, 2 + 1) = (5, 3). A pupil who just subtracts the centre's coordinates from E's, without doubling and reversing, gets (4 − 1, 2 − 1) = (3, 1). The correct image is (−2, 0).
- (a) No — the three probabilities sum to 1.10, over 1. — Winning, drawing and losing are exhaustive and mutually exclusive, so their probabilities must sum to exactly 1. Adding Freddie's three values gives 0.45 + 0.3 + 0.35 = 1.10, which is more than 1, so his probabilities cannot all be correct: 'No — the three probabilities sum to 1.10, over 1.' Checking only that each value lies between 0 and 1 accepts them as 'Yes — each probability lies between 0 and 1' without ever adding the three together. Judging by which outcome sounds most likely leads to 'Yes — winning has the highest single probability', which never checks the total either. Noting that a runner cannot win, draw and lose at once, and treating that alone as enough, gives 'Yes — the three outcomes are mutually exclusive' — but mutually exclusive outcomes that are also exhaustive must still sum to 1, and 1.10 does not.
- (b) At 0 guests, the model predicts 2 m of table — The y-intercept of a line of best fit y = mx + c is the value of y when x = 0. Here y = 0.5 × 0 + 2 = 2, so the line predicts a table length of 2 m when there are 0 guests. The 2 m does not grow as more guests arrive — that role belongs to the gradient, 0.5 — so an option saying each extra guest adds 2 m has swapped the two numbers around. The 2 is a length in metres, not a number of guests, so an option requiring 2 guests before set-up has misread its units. And the table length does change with x, since it is 0.5x + 2 and not a fixed value, so an option claiming the table is always 2 m ignores the 0.5x term completely.
- (c) 5/8 — Method: write the decimal over 1000 using its three decimal places, then simplify. Working: 0.625 = 625/1000 = 5/8 (dividing both numerator and denominator by 125). Answer: 5/8. 25/4 comes from writing the decimal over 100 instead of 1000, as if there were only two decimal places. 31/50 comes from rounding 0.625 to 0.62 before converting. 8/5 comes from simplifying correctly to 5/8 and then writing the fraction upside down.
- (c) 15 and 9 — Method: write the two facts as two equations in the same pair of letters and add them, because the letter with opposite signs cancels. Working: with x the larger number and y the smaller, x + y = 24 and x − y = 6; adding gives 2x = 30, so x = 15, and substituting into x + y = 24 gives y = 9. Answer: 15 and 9, which add to 24 and differ by 6. The distractors: 18 and 6 come from halving 24 to 12 and then adding and subtracting the whole difference of 6 instead of half of it, which leaves a difference of 12; 15 and 21 come from finding the larger number correctly and then adding 6 to it instead of subtracting; 15 and 6 come from finding the larger number and then taking the 6 in the question to be the smaller number itself.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (b) 28 — The width of the rectangle is the difference in x-coordinates, 9 − 2 = 7, and the height is the difference in y-coordinates, 5 − 1 = 4. The area is width × height = 7 × 4 = 28. 22 comes from using the perimeter formula, 2 × (7 + 4), instead of the area formula. 35 comes from multiplying 7 by 5 instead of 4, misreading one of the y-coordinates. 63 comes from multiplying 9 by 7, using an x-coordinate instead of the height.
- (a) 1/3 — Method: for two independent spinners, multiply the probability of each separate outcome, but first work out each spinner's own probability correctly, using how many of its equal sections actually carry that result. Working: Spinner A has 2 even numbers, 2 and 4, out of 4 sections, so P(even) = 2/4 = 1/2. Spinner B has 2 red sections out of 3, so P(red) = 2/3. Multiplying gives 1/2 × 2/3, which cancels down to 1/3. Answer: 1/3. Watch out: writing down 1/4 treats Spinner B's two colours as equally likely and uses 1/2 for red, when in fact 2 of its 3 sections are red — the sections are not split evenly between the two colours. Writing down 1/6 undercounts Spinner A's even numbers as just one out of four instead of two. And writing down 5/6 applies the 'at least one' formula, P(A) + P(B) − P(A)×P(B), which answers a different question about EITHER spinner landing the right way, not both together.
- (a) 225 — Method: brackets are worked out before powers, so multiply the two numbers first and then square the result. Working: 3 × 5 = 15, and 15² = 15 × 15 = 225. Answer: 225. The distractors: 30 comes from doubling 15 instead of squaring it; 75 comes from squaring only the 5 and then working out 3 × 25; 34 comes from squaring each number separately and adding, 9 + 25, instead of multiplying inside the brackets first.
- (a) 3 — Method: substitute the given value into the formula and carry out the subtraction in the order the formula is written. Working: replacing m with 8 gives L = 8 − 5, and 8 − 5 = 3. Answer: 3. The distractors: 13 comes from adding 5 to 8 instead of subtracting it; 40 comes from reading m − 5 as a multiplication and working out 8 × 5; −3 comes from subtracting the wrong way round and working out 5 − 8.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (a) A cuboid — Method: work out which solid has flat faces only, no curved surfaces and no point where edges meet, since only that gives rectangles for all three views. Working: a solid whose plan, front elevation and side elevation are all rectangles has three pairs of flat rectangular faces meeting at right angles — that is a cuboid. Answer: a cuboid. The distractors: a cylinder is wrong because its plan view (from above) is a circle, not a rectangle. A cone is wrong because its plan view is a circle and its front and side elevations are triangles. A square-based pyramid is wrong because its front and side elevations come to a point at the apex, giving triangles rather than rectangles, even though its plan view could be a square.
- (c) 4 × 10⁴ — 8 ÷ 2 = 4, and 6 − 2 = 4, so each project receives 4 × 10⁴ pounds. Multiplying the exponents instead of subtracting them gives 6 × 2 = 12, so 4 × 10¹². Adding the exponents instead of subtracting them gives 6 + 2 = 8, so 4 × 10⁸. Subtracting the coefficients instead of dividing them gives 8 − 2 = 6, so 6 × 10⁴.
- (b) 25 — Substitute n = 7: 4 × 7 − 3 = 28 − 3 = 25. Forgetting to subtract 3 gives 4 × 7 = 28. Subtracting 3 from 7 before multiplying by 4, 4 × (7 − 3) = 16, applies the operations in the wrong order. Substituting n = 8 by miscounting the position gives 4 × 8 − 3 = 29.
- (b) 25 m/s — Convert km/h to m/s by multiplying by 1000 (km to m) and dividing by 3600 (hours to seconds): 90 × 1000 ÷ 3600 = 25 m/s. Working out 90 ÷ 60 = 1.5 converts using 60, as if going from hours to minutes rather than to seconds. Working out 90 × 3.6 = 324 multiplies by 3.6 instead of dividing by it, going the wrong way between the units. Working out 90 × 1000 = 90000 converts kilometres to metres but forgets to convert hours to seconds at all. The train's speed is 25 m/s.
- (c) 4 × 10⁻¹ — Multiply the A values: 8 × 5 = 40. Add the powers of 10: −5 + 3 = −2, giving 40 × 10⁻². Since A must satisfy 1 ≤ A < 10, rewrite 40 as 4 × 10¹, so 40 × 10⁻² = 4 × 10¹ × 10⁻² = 4 × 10⁻¹. A candidate who stopped at 40 × 10⁻² did the index arithmetic correctly but left the answer outside standard form, since 40 is not between 1 and 10. A candidate who adjusted the A value to 4 correctly but then took the power of 10 by subtracting the two given powers, −5 − 3 = −8, wrote 4 × 10⁻⁸. A candidate who adjusted the A value to 4 but multiplied the two given powers, −5 × 3 = −15, wrote 4 × 10⁻¹⁵. Both of these forgot that multiplying in standard form means adding the powers.
- (b) 460 — To increase by 15%, multiply by 1.15 (100% + 15%). 400 × 1.15 = 460. 60 comes from working out only the increase, 400 × 0.15 = 60, and forgetting to add it to the original number. 415 comes from adding 15 directly to 400 instead of 15% of 400. 340 comes from multiplying by 0.85, decreasing instead of increasing: 400 × 0.85 = 340.
How the 20 questions are shared out
- Number — 5 questions (25% of the qualification)
- Algebra — 4 questions (20% of the qualification)
- Ratio, proportion and rates of change — 5 questions (25% of the qualification)
- Geometry and measures — 3 questions (15% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.