Sample paper · GCSE Foundation · grades 1–5
GCSE Foundation sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Foundation qualification — number 25%, algebra 20%, ratio, proportion and rates of change 25%, geometry and measures 15%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 50% / 25% / 25%.
CalculatorGCSE Foundation
Answer key: GCSE Foundation sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- (d) −6 — Method: check each option to see if it falls strictly between −8 and −5, remembering that numbers become smaller as they get more negative. Working: −8 < −6 < −5, so −6 lies between them. Answer: −6. −9 comes from a value that is more negative than −8, so it lies outside the range, below −8. −4 comes from a value that is less negative than −5, so it lies outside the range, above −5. 6 comes from ignoring the negative signs and picking a positive number between 5 and 8.
- (d) 4y — Method: the perimeter is the total distance round the outside of the shape, and a square has four sides all of the same length. Working: the four sides are y, y, y and y, so the perimeter is y + y + y + y, which is written as 4y. Answer: 4y. The distractors: 2y comes from adding only two of the four sides, as if the square were being treated like a rectangle with one length and one width; y² comes from working out the area of the square, y × y, instead of its perimeter; y + 4 comes from adding 4 to the side length instead of multiplying the side length by 4.
- (a) 10/7 — Put Saturday's distance over Sunday's distance: 17.5/12.25. Multiply both numbers by 100 to clear the decimals: 1750/1225. Divide both by their highest common factor, 175: 1750÷175 = 10, 1225÷175 = 7, giving 10/7. (7/10 comes from writing the distances the wrong way round. 3/7 comes from finding the difference, 17.5 − 12.25 = 5.25 km, and writing it as a fraction of Sunday's distance, 5.25/12.25. 10/17 comes from comparing Saturday's distance to the total distance ridden, 17.5/29.75.)
- (b) 16.747 m³ — Volume of a sphere = (4/3)πr³, so a hemisphere is half that: (2/3)πr³. Substitute r = 2: (2/3) × 3.14 × 2³ = (2/3) × 3.14 × 8 = (2/3) × 25.12 = 16.7467 m³, which rounds to 16.747 m³.
- (d) 0.80 — Evens is exactly halfway along the scale, at 0.5, and 3/10 written as a decimal is 0.3. A probability 3/10 higher than evens is 0.5 + 0.3 = 0.80. Giving 0.30 as the answer converts the increase but never adds it to the value of evens. Adding the increase to 1, the 'certain' end of the scale, instead of to evens gives 1 + 0.3 = 1.30, which cannot be a probability. Writing 3/10 as 0.03 instead of 0.3, a place-value slip, gives 0.5 + 0.03 = 0.53.
- (d) The modal class, as the class with most pupils is shown — Method: a grouped frequency table records how many values fall into each class, but not the values themselves, so any average that needs the individual times can only be estimated from it. Working: the four frequencies are 8, 12, 6 and 4, and 8 + 12 + 6 + 4 = 30, so every pupil is counted. The largest frequency is 12, which belongs to the class 10 < t ≤ 20, and that class can be written down exactly, because finding it needs nothing but the counts the table already gives. Answer: the modal class, as the class with most pupils is shown. The distractors: the mean is said to use all 30 times, but the table does not hold them; the usual method replaces each class by its midpoint, 5, 15, 25 and 35, which gives an estimate of the mean and not its true value; the median is said to be shown, but the table locates only the class holding the 15th and 16th times, which is 10 < t ≤ 20, without saying what either time was; the range is said to be shown, but 0 and 40 are the boundaries of the first and last classes, not the fastest and slowest times actually recorded.
- (d) −5, −1, 0, 3 — Method: order the numbers by their position on a number line, smallest (furthest left) first. Working: both −5 and −1 lie to the left of 0, and 3 lies to the right of 0. Of the two negatives, −5 is 5 units from zero and −1 is 1 unit from zero, so −5 is further left. Answer: −5, −1, 0, 3. The distractors: 3, 0, −1, −5 is the correct order written the wrong way round, starting with the largest; −1, −5, 0, 3 comes from ordering the two negatives by the size of their digits, so that −1 is treated as the smaller; 0, −1, −5, 3 comes from believing that zero is the smallest number there is and then listing the negatives by their digits.
- (c) The cost, in pounds, for each extra gigabyte of data used — In C = 15 + 2g, the number multiplying g is the gradient, which gives the extra cost for each extra unit of g — here, £2 for each extra gigabyte. 'The fixed monthly fee, in pounds' describes the constant term 15, not the coefficient of g. 'The total number of gigabytes included in the plan' misreads the coefficient as a quantity of data rather than a cost per gigabyte. 'The cost … for each extra 2 gigabytes' doubles the unit the coefficient actually applies to — it is the cost for each single extra gigabyte.
- (c) 10,800 kg — Method: since the model and the real container are similar and made of the same material, mass scales with volume, so the mass scale factor is the length scale factor cubed. Working: 30³ = 27,000, so the real container's mass is 400 × 27,000 = 10,800,000 g, which is 10,800,000 ÷ 1,000 = 10,800 kg. Answer: 10,800 kg. 12 kg comes from using the length scale factor directly, 400 × 30 = 12,000 g, without cubing it. 360 kg comes from squaring the length scale factor instead of cubing it, 400 × 30² = 360,000 g. 10,800,000 kg comes from correctly cubing the scale factor but then forgetting to convert the mass from grams into kilograms.
- (b) 8.5 m — First apply the scale to convert the plan length to a real length in centimetres: 3.4 × 250 = 850 cm. Then convert centimetres to metres by dividing by 100: 850 ÷ 100 = 8.5, so the wall is 8.5 m long. Choosing 850 m applies the scale correctly but forgets to convert the answer from centimetres into metres. Choosing 0.85 m divides by 1000 instead of 100, confusing the centimetre-to-metre conversion with a metre-to-kilometre one. Choosing 3.4 m ignores the scale factor completely and just restates the plan length as if it were already the real length.
- (d) 15/64 — Method: because the first marble is put back, the second draw is made from the same 8 marbles, so the two draws are independent and their probabilities are multiplied. Working: the bag holds 8 marbles both times, so yellow first has probability 5/8 and blue second has probability 3/8. Multiplying fractions gives 5 × 3 = 15 on the top and 8 × 8 = 64 on the bottom. Answer: the probability is 15/64. The distractors: 9/64 comes from working out the probability that BOTH marbles are blue, 3/8 × 3/8, instead of one of each colour in the stated order; 15/16 comes from multiplying the numerators but adding the denominators; 5/8 comes from writing down the first draw only and never combining it with the second.
- (a) 36 — Method: for the highest common factor, take the LOWER power of each prime that appears in both numbers. Working: for 2, the lower power is 2² (from 108); for 3, the lower power is 3² (from 72), so the highest common factor is 2² × 3² = 4 × 9 = 36. 216 comes from taking the higher power of each prime instead, 2³ × 3³ = 8 × 27 = 216, which gives the lowest common multiple, not the highest common factor. 108 is simply one of the two numbers, not their highest common factor. 6 comes from multiplying the primes without any powers at all, 2 × 3 = 6. Answer: 36.
- (d) −5 — In y = mx + c, the y-intercept is c, the constant term, not the coefficient of x. Here c = −5, so the y-intercept is −5. 4 is Beth's value, the coefficient of x (the gradient), not the intercept. 5 comes from taking the constant term but dropping its negative sign. −4 comes from taking the gradient but giving it the sign of the intercept.
- (d) £82.50 — Find the hourly rate: £52.50 ÷ 7 = £7.50 per hour. For 11 hours: 11 × £7.50 = £82.50. £30 comes from working out the pay for only the extra 4 hours (4 × £7.50), and forgetting to include the original £52.50. £99 comes from misremembering the hourly rate as £9 instead of £7.50, then 11 × £9. £56.50 comes from adding the extra number of hours (4) straight onto the pay in pounds (52.5 + 4), confusing hours with pounds.
- (b) Square — A square has all four sides equal, all four angles equal to 90°, and diagonals that are equal in length and bisect each other at right angles — every part of the description matches, so Square is correct. A rhombus has all four sides equal and diagonals bisecting at right angles, but its interior angles are not generally 90° (only a square, a special rhombus, has that), so it does not fully match. A rectangle has four 90° angles and equal diagonals, but its sides are not all equal in general, so it fails the equal-sides condition. A kite has two pairs of adjacent equal sides rather than all four sides equal, and its diagonals are not generally equal in length, so it fails both conditions.
- (c) < — Compare the two decimals by their value, not by how many digits they have: 0.45 is worth less than half, while 0.5 is exactly half, so 0.45 is smaller. The correct symbol is <, since 0.45 is less than 0.5. Choosing > treats 0.45 as bigger because it has more digits after the decimal point than 0.5 — extra decimal digits do not make a number bigger. Choosing = comes from rounding 0.45 to 1 decimal place, 0.5, and then treating the rounded value as if it were the original number. Choosing ≥ would mean 0.45 is greater than or equal to 0.5, which is false in both parts, since 0.45 is neither equal to nor bigger than 0.5. So 0.45 < 0.5.
- (a) a + 4b — Method: collect the terms in a and the terms in b separately, keeping the sign that stands in front of each term. Working: the a terms give 2a − a = a; the b terms give 3b + 2b − b = 4b; a and b are unlike terms, so the two results cannot be joined. Answer: a + 4b. The distractors: 3a + 4b comes from reading −a as +a, so that 2a + a = 3a; a + 6b comes from reading −b as +b, so that 3b + 2b + b = 6b; 5ab comes from combining the unlike terms a and 4b into one term by adding 1 and 4 and joining the letters.
- (b) 32p — £3.20 is 320p, and 1 kg is 1000 g, which is 10 lots of 100 g. Divide the price in pence by 10: 320 ÷ 10 = 32p per 100 g. Dividing 320 by 100 instead of 10 gives 3.2p, using the wrong number of hundred-grams in a kilogram. Multiplying 320 by 10 instead of dividing gives 3200p. Forgetting to convert pounds to pence and dividing 3.20 by 10 gives 0.32, which is still in pounds rather than pence. Rice costs 32p per 100 g.
- (c) 6 — Listing systematically: red-black, red-grey, blue-black, blue-grey, green-black, green-grey gives 6 different outfits, matching 3 × 2 = 6. 5 comes from adding the number of T-shirts and shorts instead of multiplying them. 3 comes from counting only the T-shirts. 2 comes from counting only the pairs of shorts.
- (c) They are in direct proportion, because y ÷ x = 2.5 for both pairs. — Testing direct proportion means checking that y ÷ x is the same for every pair: 15 ÷ 6 = 2.5 and 25 ÷ 10 = 2.5, so the quantities are in direct proportion. Saying they are not in proportion because x + y differs uses addition, which is not the correct test for proportion. Saying they are not in proportion because y − x differs also uses the wrong test — subtraction, not division. Saying they are in proportion because x × y is 90 and 250 uses multiplication, which is the test for inverse proportion, and the two products are not even equal to each other, so this option also contradicts itself.
How the 20 questions are shared out
- Number — 5 questions (25% of the qualification)
- Algebra — 4 questions (20% of the qualification)
- Ratio, proportion and rates of change — 5 questions (25% of the qualification)
- Geometry and measures — 3 questions (15% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.