Sample paper · GCSE Foundation · grades 1–5
GCSE Foundation sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Foundation qualification — number 25%, algebra 20%, ratio, proportion and rates of change 25%, geometry and measures 15%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 50% / 25% / 25%.
CalculatorGCSE Foundation
Answer key: GCSE Foundation sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- (b) 9 g/cm³ — Method: density = mass ÷ volume. Working: 540 ÷ 60 = 9. Answer: 9 g/cm³. (0.11 g/cm³ comes from dividing the volume by the mass instead of the mass by the volume. 480 g/cm³ comes from subtracting the volume from the mass instead of dividing. 32400 g/cm³ comes from multiplying the mass by the volume instead of dividing.)
- (a) (−6, −3) — Reflecting in the y-axis changes the sign of the x-coordinate and keeps the y-coordinate the same: (−6, −3). (6, 3) comes from reflecting in the x-axis instead, which changes the sign of the y-coordinate. (−6, 3) comes from reflecting in both axes. (6, −3) comes from not applying the reflection at all.
- (a) 3/4 — Method: use tan = opposite ÷ adjacent in the right-angled triangle to find tan(angle B), then use the fact that corresponding angles in similar shapes are equal, so they have equal trigonometric ratios. Working: for angle B, the opposite side is AC = 3 cm and the adjacent side is BC = 4 cm, so tan(angle B) = 3/4. Angle Q corresponds to angle B, so angle Q = angle B and tan(angle Q) = 3/4. Answer: 3/4. 4/3 comes from writing the ratio upside down, adjacent ÷ opposite, giving the reciprocal instead of the tangent. 3/7 and 4/7 come from treating 3 and 4 as if they were parts of a total of 3 + 4 = 7, which is how a ratio is shared, not how a trigonometric ratio is formed.
- (a) $\binom{5}{−6}$ — The vector is (image − original) in each coordinate: (2 − (−3), −1 − 5) = (5, −6). $\binom{−5}{6}$ comes from working out original − image instead of image − original. $\binom{5}{6}$ gets the x-component right but makes a sign error on the y-component. $\binom{−5}{−6}$ gets the y-component right but makes a sign error on the x-component, working out −3 − 2 = −5 instead of 2 − (−3) = 5.
- (c) 0.31 — Method: a late bus can be reached along two paths of the tree. Multiply along each path, then add the paths that end in a late bus. Working: the rain path gives 0.3 × 0.8 = 0.24. No rain has probability 1 − 0.3 = 0.7, so the second path gives 0.7 × 0.1 = 0.07. Adding the two paths gives 0.24 + 0.07. Answer: the probability is 0.31. The distractors: 0.9 comes from adding the two branch probabilities 0.8 and 0.1 without first weighting them by how often it rains; 0.24 comes from following the rain path only and ignoring that the bus can also be late when it is dry; 0.27 comes from using 0.3 at the start of both paths, so that the no-rain path is given 0.3 × 0.1 instead of 0.7 × 0.1.
- (d) 75 — Method: to find a total from a bar chart, add together the height of every bar. Working: 12 + 18 + 9 + 15 + 21 = 75 books. Leaving out Wednesday's bar by mistake, 12 + 18 + 15 + 21 = 66, misses one day out of the total. Giving 21 states only Friday's bar, the tallest one, not the total of all five days. Dividing the total by the number of days, 75 ÷ 5 = 15, finds the mean number of books per day, not the total borrowed. Add up every single bar — do not stop at the biggest one, and do not divide once you have added them all.
- (a) 1/4 — First find the fraction of the people who are children: the pool is 3 + 5 = 8 equal shares and the children take 5, so the children are 5/8 of the people. The boys are 2/5 of that, and 'of' means multiply: 2/5 × 5/8 = 10/40 = 1/4. Answering 2/5 gives the boys as a fraction of the children only, 3/20 multiplies by the adults' fraction 3/8 instead of the children's, and 3/5 is the fraction of the children who are girls.
- (a) −2 and 2 — Method: the graph crosses the x-axis where y = 0, so read the two crossing points straight off the curve. Working: the curve meets the horizontal axis two squares to the left of the origin and two squares to the right, at x = −2 and x = 2. Answer: −2 and 2. Distractor refutation: −4 and 4 comes from reading the value where the curve crosses the y-axis, −4, and using that value and its positive partner as the x-axis crossings instead. −2 and 3 comes from misreading the right-hand crossing point one square out along the grid, taking it where the curve is already above the axis. 0 and 2 comes from confusing the lowest point of the curve, which sits on the y-axis at x = 0, with one of the crossing points.
- (c) 90 cm² — The perimeter ratio is 30 : 45, which simplifies to 2 : 3, so the larger frame is 1.5 times the perimeter of the smaller one. Areas scale with the square of this length scale factor: 1.5² = 2.25. 40 × 2.25 = 90, so the larger frame has an area of 90 cm². Giving 60 cm² uses the scale factor, 1.5, without squaring it (40 × 1.5 = 60). Giving 135 cm² cubes the scale factor, 1.5³ = 3.375, as if area scaled like a volume (40 × 3.375 = 135). Giving 2.25 cm² is the squared scale factor on its own, without multiplying by the smaller frame's area of 40 cm².
- (b) (6, −8) — Method: a scalar multiple of m has the same ratio between its top and bottom numbers as m does. Working: m = (3, −4); multiplying both parts by 2 gives 2 × 3 = 6 and 2 × (−4) = −8, so (6, −8) is a scalar multiple of m. Answer: (6, −8). The vector (6, −4) needs a multiplier of 2 for the top number but only 1 for the bottom number, so it is not a multiple. The vector (−6, −8) needs a multiplier of −2 for the top number but 2 for the bottom number, so it is not a multiple. The vector (9, −8) needs a multiplier of 3 for the top number but 2 for the bottom number, so it is not a multiple.
- (c) 0.2 — Let P(green) = x, so P(blue) = 2x. Red, blue, green and yellow are exhaustive: 0.05 + 0.35 + x + 2x = 1, so 0.4 + 3x = 1, giving 3x = 0.6 and x = 0.2. So P(green) = 0.2. Splitting the remaining 0.6 evenly between blue and green, ignoring the 2:1 ratio, gives 0.3. Working out x correctly but then reporting 2x, the probability of blue, gives 0.4. Stopping after finding that blue and green together account for 0.6, without dividing by the three equal shares of x, gives 0.6.
- (b) 3/5 — Method: add all three parts for the total, add together the parts that are not green, then write this over the total. Working: total parts = 4 + 5 + 6 = 15. Not green = 4 + 5 = 9. Fraction = 9/15 = 3/5. Answer: 3/5. 2/5 comes from finding the fraction that IS green (6/15 = 2/5) instead of not green. 4/15 comes from only counting the red baubles as 'not green' and forgetting the gold ones. 9/10 comes from adding only two of the three ratio parts to find the total (4+6=10), missing out the gold part, while still using 9 for the numerator.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (d) 7/5 — The number of unbroken crayons is 60 − 25 = 35. The comparison is with the broken crayons, so the broken crayons are the denominator: 35/25. Both parts divide by 5: 35 ÷ 5 = 7 and 25 ÷ 5 = 5. The fraction is 7/5, which is greater than 1 because there are more unbroken crayons than broken ones.
- (c) 24 cm² — Method: the front elevation of a cuboid is a rectangle formed by the cuboid's length and its height, so its area is length × height. Working: 6 cm × 4 cm = 24 cm². Answer: 24 cm². The distractors: 12 cm² comes from using width × height (3 × 4) instead of length × height, mistaking the side elevation's dimensions for the front's. 18 cm² comes from using length × width (6 × 3), which gives the area of the plan view instead of the front elevation. 20 cm² comes from finding the perimeter of the front face instead of its area: 2 × (6 + 4) = 20.
- (c) 0.0065 — Leading zeros are never significant, so counting from the first non-zero digit, the first two significant figures of 0.006482 are 6 and 4. Look at the next digit along, 8, to decide whether the second figure rounds up: since 8 is 5 or more, the 4 rounds up to 5, giving 0.0065. Rounding to 2 decimal places instead of 2 significant figures gives 0.01, which answers a different question. Wrongly counting one of the leading zeros as a significant figure and stopping one figure short gives 0.006. Keeping an extra digit, as in 0.00648, gives 3 significant figures rather than 2.
- (c) w/6 — Method: a ÷ b is written as a fraction a/b, with the number being divided (w) on top. Working: w ÷ 6 = w/6. Answer: w/6. 6/w comes from writing the numbers the wrong way round, putting the 6 on top instead of w. 6w comes from reading the ÷ sign as ×, multiplying instead of dividing. w − 6 comes from reading ÷ as −, subtracting instead of dividing.
- (a) 15 : 12 — Multiply both parts of the ratio 5 : 4 by the same number, 3, to get an equivalent ratio: 5 × 3 = 15 and 4 × 3 = 12, giving 15 : 12. Giving 15 : 16 multiplies the two parts by different scale factors (×3 and ×4), which changes the ratio. Giving 9 : 8 adds 4 to each part instead of multiplying, which also changes the ratio. Giving 4 : 5 swaps the order of the two parts.
- (d) 1.6 × 10⁵ — 5.6 ÷ 3.5 = 1.6, and 7 − 2 = 5, so the average turnover per shop is 1.6 × 10⁵ pounds. Multiplying the exponents instead of subtracting them gives 7 × 2 = 14, so 1.6 × 10¹⁴. Adding the exponents instead of subtracting them gives 7 + 2 = 9, so 1.6 × 10⁹. Subtracting the coefficients instead of dividing them gives 5.6 − 3.5 = 2.1, so 2.1 × 10⁵.
- (d) 4.50 m² — 1 m² = 100 cm × 100 cm = 10,000 cm², so to convert cm² to m² you divide by 10,000: 45,000 ÷ 10,000 = 4.50 m². Dividing by 100 instead of 10,000, treating area like a length conversion, gives 45,000 ÷ 100 = 450.00 m², a common mistake since 1 m = 100 cm. Multiplying by 100 instead of dividing gives 45,000 × 100 = 4500000.00 m², using the conversion factor the wrong way round entirely. Dividing by 100,000 instead of 10,000 gives 0.45 m², an extra factor of 10 too far.
How the 20 questions are shared out
- Number — 5 questions (25% of the qualification)
- Algebra — 4 questions (20% of the qualification)
- Ratio, proportion and rates of change — 5 questions (25% of the qualification)
- Geometry and measures — 3 questions (15% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.