Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 1 (non-calculator)
The real Paper 1 is 1.5 hour 30 minutes and 80 marks, non-calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with no calculator-only items. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
Non-calculatorGCSE Higher
GCSE Higher sample Paper 1 (non-calculator)
MathsUKwww.geekhero.co.uk
- 1.The density of a type of plastic is 0.9 g/cm³. Work out this density in kg/m³.
- 2.The nth term of a sequence is 4n + 2. A term in the sequence has value 30. Work out its position, n, in the sequence.
- 3.A fruit squash is made by mixing squash and water. In a jug, 2/9 of the total volume is squash. A caterer makes up 4.5 litres of the squash mixture. Work out how many litres of squash are in the mixture.
- 4.A radar station is at the origin of a grid, where each unit represents 1 km. A boat is detected at the point (7, 24). Work out the boat's distance from the station, then work out how many hours it will take the boat to reach the station travelling directly towards it at 5 km per hour.
- 5.Harry plays a game in which he flips a fair coin and rolls an ordinary fair dice. He wins a prize only if the coin shows heads and the dice shows a 6. Work out the probability that Harry wins a prize.
- 6.A council wants to find out what all residents of a town think about a new cycle lane. It posts a survey only on its website and asks people to fill it in online. Give a reason why this sample is likely to be biased.
- 7.Work out 5⁰ + 5¹ + 5²
- 8.The curve y = x² − 6 and the line y = 2x − 3 intersect at two points. Which pair of points is correct?y = 2x − 3y = x² − 6
- 9.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 10.A cyclist's journey from her house to the shop is represented by the column vector with top number 2 and bottom number 5, where each unit is 1 km east and 1 km north. She then cycles from the shop to the park, represented by the column vector with top number 4 and bottom number −3. What single column vector represents her journey from her house directly to the park?
- 11.A survey of 160 employees at a company recorded whether they cycle to work, using a frequency tree. The first branch splits them into 90 who work full-time and 70 who work part-time. Of the full-time employees, 27 cycle to work. Of the part-time employees, 14 cycle to work. Work out the probability that an employee, chosen at random from the 160, cycles to work. Give your answer as a fraction in its simplest form.
- 12.Ava measures a metal rod and records its length as 15 cm, correct to the nearest centimetre. Ben measures the same rod and records its length as 14.8 cm, correct to the nearest 0.1 cm. Decide whether both records can be correct, and give a reason for your answer.
- 13.A caterer uses the formula C = 6p + 20 to work out the total cost, £C, of a buffet for p people, where £20 covers fixed costs. A customer is charged £92. Work out how many people, p, the buffet was for.
- 14.Last week Priya worked 5 shifts of 7 hours. This week she worked 4 shifts of 8 hours. Write the number of hours she worked last week as a fraction of the number of hours she worked this week.
- 15.From an external point P, two tangents PA and PB touch a circle with centre O at A and B. Angle AOB = 112°. Work out the size of angle APB.
- 16.A car's velocity–time graph is a straight line from (0 s, 4 m/s) rising to (6 s, V m/s), followed by a straight line falling from (6 s, V m/s) to (9 s, 0 m/s). The gradient of the second line is −8 m/s². Work out the total distance travelled between t = 0 and t = 9 seconds.
- 17.A car travels 180 miles in 3 hours. A lorry travels 160 miles in 4 hours. Write the car's average speed as a fraction of the lorry's average speed, giving your answer in its simplest form.
- 18.The diagram shows the plan of the base layer of a solid built from identical cubes. A second layer of cubes is added on top, filling the entire base layer to a height of 2 cubes everywhere. Work out how many squares are visible in the plan view of this solid.
- 19.A circle has equation x² + y² = 25. Does the point (3, 4) lie on this circle?
- 20.A graph shows the total monthly cost of a mobile phone tariff against the number of minutes of calls. The line starts at £12 and stays level until 200 minutes, then rises by 5p for each further minute of calls. Use the graph to work out the total cost of a month in which 250 minutes of calls are made.
Answer key
- (a) 900 kg/m³ — Both parts of the compound unit change. There are 100 cm in a metre, so 1 m³ = 100³ = 1 000 000 cm³, and there are 1000 g in a kilogram. So 1 g/cm³ = 1 000 000 ÷ 1000 = 1000 kg/m³, and the plastic is 0.9 × 1000 = 900 kg/m³. 900 000 kg/m³ converts the volume but leaves the mass in grams, 0.0009 kg/m³ converts the mass but leaves the volume in cm³, and 0.09 kg/m³ uses the 100 cm in a metre without cubing it.
- (c) 7 — To reverse the rule, subtract the constant then divide by the coefficient: 30−2=28, then 28÷4=7, so n=7. A candidate who adds the constant instead of subtracting it, a sign error when rearranging, would compute (30+2)÷4=32÷4=8. A candidate who subtracts the constant correctly but then forgets to divide by the coefficient would stop at 30−2=28. A candidate who treats 4n+2 as a single term 6n, adding the coefficient and constant together, would compute 30÷6=5.
- (d) 1.00 litres — Squash is 2/9 of the mixture, so the squash volume is 4.5 × 2/9 = 1.00 litres. Using the water's fraction, 7/9, instead of squash's gives 4.5 × 7/9 = 3.50 litres — the volume of water, not squash. Dividing 4.5 by 9 but forgetting to multiply by the numerator 2 gives 4.5 ÷ 9 = 0.50 litres, which is only 1/9 of the mixture. Halving the total volume instead of applying the fraction 2/9 gives 4.5 ÷ 2 = 2.25 litres, which assumes the mixture is half squash.
- (c) 5 hours — The distance from the origin to (7, 24) is √(7² + 24²) = √(49 + 576) = √625 = 25 km. Travelling at 5 km per hour, the time taken is 25 ÷ 5 = 5 hours. 25 hours mistakes the distance itself for the time, forgetting to divide by the speed. 125 hours comes from multiplying the distance by the speed, 25 × 5, instead of dividing. 0.2 hours comes from dividing the speed by the distance, 5 ÷ 25, the wrong way round.
- (b) 1/12 — Method: the coin does not affect the dice, so the two events are independent and the probability that both happen is the product of their probabilities. Working: heads has probability 1/2 and a 6 on an ordinary dice has probability 1/6. Multiplying gives 1 on the top and 2 × 6 = 12 on the bottom. Answer: the probability is 1/12. The distractors: 2/3 comes from adding 1/2 and 1/6 instead of multiplying them; 1/6 comes from using the dice alone and ignoring the condition on the coin; 1/8 comes from counting the possible results as 6 + 2 = 8 and treating the winning result as one of those eight.
- (d) Only internet users reach the website; others are excluded. — Method: a sample is biased when it systematically leaves out part of the population, or systematically over-represents another part. Working: anyone without internet access, or who does not visit the council's website, has NO chance of being included — the sample is drawn only from internet-using residents, which is not the whole town. Saying too many people might respond because the survey is free confuses bias with sample size — bias is about who CAN be reached, not how many respond. Saying people might lie describes a different problem, response honesty, not who was sampled in the first place. Saying online surveys cannot be anonymous is not a reason connected to bias at all. A sample is biased when part of the population has no chance of being included, whatever the reason for that.
- (c) 31 — Method: work out each power separately, remembering that any non-zero base raised to the power 0 is 1 and a base raised to the power 1 is itself, then add the three values. Working: 5⁰ = 1, 5¹ = 5 and 5² = 25, so the total is 1 + 5 + 25 = 31. Answer: 31. The distractors: 30 comes from taking 5⁰ as 0 instead of 1; 35 comes from taking 5⁰ as 5, treating a zero index as leaving the base unchanged; 125 comes from adding the indices first, as though the three terms were being multiplied, and working out 5³.
- (b) (3, 3) and (−1, −5) — Set the two expressions for y equal: x² − 6 = 2x − 3, which rearranges to x² − 2x − 3 = 0. Factorise: (x − 3)(x + 1) = 0, so x = 3 or x = −1. Substitute into the linear equation, y = 2x − 3: x = 3 gives y = 3; x = −1 gives y = −5. The points are (3, 3) and (−1, −5). Distractor routes: (3, 3) and (1, −1) comes from mis-factorising x² − 2x − 3 as (x − 3)(x − 1), giving a second root of 1 instead of −1. (3, 9) and (−1, 1) comes from finding the y-coordinate from y = x² instead of substituting back into the given line equation y = 2x − 3. (3, 3) alone stops after finding only the first root of the quadratic.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (b) (6, 2) — The overall journey from house to park is the sum of the two vectors: top = 2 + 4 = 6, bottom = 5 + (−3) = 2, giving (6, 2). A candidate who subtracts the second vector from the first instead of adding gets (2 − 4, 5 − (−3)) = (−2, 8). A candidate who subtracts the other way round gets (4 − 2, −3 − 5) = (2, −8). A candidate who forgets the negative sign on the second vector's bottom number and adds 3 instead of −3 gets (6, 8). Because the journeys join end to end, the correct resultant vector is (6, 2).
- (b) 41/160 — In total, 27 + 14 = 41 of the 160 employees cycle to work, so the probability is 41/160 (41 and 160 share no common factor, so this is already in its simplest form). Writing 27/160 is wrong because it only counts the full-time cyclists and leaves out the 14 part-time cyclists. Writing 41/90 is wrong because it uses the full-time total (90) as the denominator instead of the whole survey (160). Writing 1/5 is wrong because it only uses the part-time branch, simplifying 14/70 to 1/5 and ignoring the full-time cyclists completely. The probability is 41/160.
- (b) Yes, because 14.8 cm rounds to 15 cm to the nearest cm — Method: a recorded measurement is not an exact length; it stands for every length that rounds to it, so the two records agree if one rod can produce both. Working: Ben's record of 14.8 cm to the nearest 0.1 cm means the rod is between 14.75 cm and 14.85 cm, and 14.8 is nearer to 15 than to 14, so a rod of that length is recorded as 15 cm to the nearest centimetre. Both records can therefore come from the same rod. Answer: Yes, because 14.8 cm rounds to 15 cm to the nearest cm. The distractors: the claim that 14.8 cm rounds to 15.0 cm to 1 decimal place is false, since 14.8 cm is already written to 1 decimal place and stays 14.8 cm; the claim that it rounds to 14 cm is false, because 14.8 is 0.2 away from 15 and 0.8 away from 14; the claim that the two lengths are not the same treats each record as an exact length, when each is only a rounded record of one rod.
- (b) 12 — Method: substitute the total cost into the formula, then subtract the fixed cost and divide by the cost per person. Working: 92 = 6p + 20, so 6p = 92 − 20 = 72, p = 72 ÷ 6 = 12. Answer: 12 people. 15.33 comes from dividing the whole £92 by £6 without first subtracting the £20 fixed cost: 92 ÷ 6 ≈ 15.33. 4.3 comes from swapping the two amounts round, subtracting £6 and dividing by £20: (92 − 6) ÷ 20 = 4.3. 18.67 comes from adding the fixed cost instead of subtracting it: (92 + 20) ÷ 6 ≈ 18.67.
- (a) 35/32 — Work out each weekly total first. Last week: 5 × 7 = 35 hours. This week: 4 × 8 = 32 hours. Last week's total is being written as a fraction of this week's total, so last week goes on the top and this week goes on the bottom, giving 35/32. The two totals share no common factor, so the fraction cannot be cancelled. It is greater than 1, which says that Priya worked more hours last week than this week.
- (a) 68° — Method: a tangent meets a radius at 90°, so quadrilateral OAPB has two right angles at A and B; its four angles sum to 360°, so angle APB = 360° − 90° − 90° − angle AOB. Working: angle APB = 360° − 90° − 90° − 112° = 68°. Halving angle AOB, confusing this with the angle-at-centre theorem for a chord, gives 56°; assuming the angle between two tangents is always 90° (true only for the angles at A and B, not at P) gives 90°; and assuming angle APB simply equals angle AOB by symmetry gives 112°. The two right angles at A and B, from the tangent-radius property, are what link angle AOB and angle APB.
- (a) 120 m — The gradient of the second line is (0 − V)/(9 − 6) = −V/3, and this equals −8, so V = 24. The distance from t = 0 to t = 6 is the area of a trapezium with parallel sides 4 and 24 and width 6: 1/2 × (4 + 24) × 6 = 84. The distance from t = 6 to t = 9 is the area of a triangle with base 3 and height 24: 1/2 × 3 × 24 = 36. The total distance is 84 + 36 = 120 m. Using V = 8, treating the gradient's number as the missing velocity itself rather than solving −V/3 = −8 for V, gives a trapezium area of 1/2 × (4 + 8) × 6 = 36 and a triangle area of 1/2 × 3 × 8 = 12, a total of 48 m. Leaving out the 1/2 in the trapezium formula, (4 + 24) × 6 = 168, plus the correct triangle of 36, gives 204 m. Using the full 6 seconds as the triangle's base instead of the 3 seconds the second line actually lasts, 1/2 × 6 × 24 = 72, plus the correct trapezium of 84, gives 156 m.
- (a) 3/2 — Find each average speed: car = 180 ÷ 3 = 60 mph; lorry = 160 ÷ 4 = 40 mph. Put the car's speed over the lorry's speed: 60/40. Divide both numbers by their highest common factor, 20: 60÷20 = 3, 40÷20 = 2, giving 3/2. (2/3 comes from writing the speeds the wrong way round. 9/8 comes from comparing the distances travelled, 180/160, without working out the speeds. 3/4 comes from comparing the times taken, 3/4, instead of the speeds.)
- (c) 6 squares — Method: the plan view shows the footprint of the solid; a second layer stacked on top of floor positions that are already covered does not create any new squares in the plan. Working: the row of 4 cubes and the row of 2 cubes attached at the end do not overlap, so the footprint has 4 + 2 = 6 distinct squares. Answer: 6 squares. The distractors: 12 squares comes from counting the total number of cubes used, including the second layer (6 floor positions × 2 layers = 12), instead of the footprint. 4 squares comes from counting only the row of four and forgetting the attached row of two. 5 squares comes from wrongly treating the corner square as shared between the two rows (4 + 1 instead of 4 + 2).
- (d) Yes, because 3² + 4² = 25. — A point lies on the circle x² + y² = 25 exactly when substituting its coordinates makes the equation true. Squaring each coordinate separately and adding: 3² + 4² = 9 + 16 = 25, which matches the right-hand side, so (3, 4) does lie on the circle. Adding the coordinates without squaring them, 3 + 4 = 7, and then reasoning that 7 is less than 25 happens to reach the same verdict, but it is not testing the equation of the circle at all — the circle equation depends on x² + y², not x + y. Squaring the sum instead of summing the squares, (3 + 4)² = 49, not 25, wrongly rules the point out. Doubling each coordinate instead of squaring it, so that 4² is taken as 8, gives 9 + 8 = 17, not 25, which also wrongly rules the point out.
- (a) £14.50 — Method: the first 200 minutes are already covered by the £12, so only 250 − 200 = 50 minutes are charged extra. Extra charge = 50 × £0.05 = £2.50. Total cost = £12 + £2.50 = £14.50. Distractor origins: £24.50 charges 5p for all 250 minutes instead of only the 50 minutes over 200 (250 × £0.05 = £12.50, plus £12 = £24.50); £12.50 makes that same slip of charging all 250 minutes but then forgets to add the £12 monthly fee; £13.50 works out 250 − 200 wrongly as 30 extra minutes instead of 50 (30 × £0.05 = £1.50, plus £12 = £13.50).
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.