Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 1 (non-calculator)
The real Paper 1 is 1.5 hour 30 minutes and 80 marks, non-calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with no calculator-only items. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
Non-calculatorGCSE Higher
GCSE Higher sample Paper 1 (non-calculator)
MathsUKwww.geekhero.co.uk
- 1.A recipe for one cake needs 2/3 of a cup of sugar. Priya has 3 1/2 cups of sugar. Work out how many complete cakes she can make.
- 2.A walker's distance-time graph is described as follows: she walks 3 km in the first 15 minutes at a steady speed, rests for 10 minutes, then walks a further 3 km in the next 20 minutes, also at a steady speed. Work out her speed, in km/h, during the first 15 minutes.
- 3.A candidate wants to estimate the instantaneous rate of change of a reservoir's water level, in metres, at t = 5 days after heavy rain began. The reservoir's water level is plotted against time, in days, since the rain began. The candidate uses the chord joining the points at t = 0 days and t = 20 days to estimate the rate of change at t = 5 days. Give a reason why this is likely to be a poor estimate.
- 4.A courier drone delivers a parcel. It starts at the point (2, 1) on a map grid measured in kilometres. It flies by the vector to a warehouse, then by the vector to the delivery address. Work out the coordinates of the delivery address.
- 5.Five balls numbered 1, 2, 3, 4 and 5 are in a bag. Two of them are taken out together at random. Work out the probability that the two numbers on them add up to more than 7.
- 6.A scatter graph shows the height, x cm, and the mass, y kg, of 20 pupils in Year 10. The heights on the graph run from 150 cm to 180 cm, and the line of best fit is y = 0.9x − 85. Nadia puts x = 90 into this equation to estimate the mass of a two-year-old child who is 90 cm tall. Is her estimate reliable? Give a reason for your answer.y = 0.9x − 85
- 7.Work out √144 − 2 × 3 + √25
- 8.Work out the gradient of the straight line with equation y = (2x/5) − 3.
- 9.A straight-line graph shows the cost, C pounds, of hiring a bike for h hours. The line passes through the points (1, 12) and (4, 27). Which of these statements about the line is true?
- 10.A square-based pyramid is cut by a flat plane parallel to its base, partway up between the base and the apex. What shape is the cross-section?
- 11.An archer hits the bullseye with probability 0.24 on any one shot. She wants to know how many shots she must take to expect to hit the bullseye 12 times. Work out how many shots this is.
- 12.A plank has length a = 12 cm and a second plank has length b = 7 cm, each correct to the nearest centimetre. Work out the upper bound of a + b.
- 13.The curve y = −x² + 6x − 5 has a maximum point. Use completing the square to find its coordinates.y = −x² + 6x − 5
- 14.A charity receives £360 in donations in January and £480 in donations in February. Write the amount received in January as a fraction of the amount received in February, giving your answer in its simplest form.
- 15.A surveyor marks two fixed points A and B, with position vectors OA = a and OB = b (in km) from a base station O. A relay mast P is to be placed on the line AB such that AP : PB = 3 : 2. Express the vector OP in terms of a and b.
- 16.The cost, in pounds, of hiring a van for d days is given by the formula C = 25 + 18d. A customer's hire cost £133. Work out how many days, d, they hired the van for, by first rearranging the formula to make d the subject.
- 17.A rope of length A is 1.5 times as long as a rope of length B. Write the ratio A : B in its simplest form.
- 18.A path goes from A(1, 1) to B(1, 5), then from B to C(6, 5). Work out the total length of the path from A to C.
- 19.Solve the simultaneous equations y = 2x − 1 and y = x² − x − 1, giving both pairs of solutions.y = 2x − 1y = x²
- 20.Solve x² − x − 12 = 0.
Answer key
- (b) 5 — Method: divide the total amount of sugar by the amount needed for one cake, then round down because a part-used amount of sugar cannot make an extra whole cake. Working: 3 1/2 ÷ 2/3 = 7/2 × 3/2 = 21/4 = 5.25; only 5 complete cakes can be made, since the leftover 0.25 of a portion is not enough for a 6th cake. Answer: 5. 5.25 gives the exact result of the division without rounding down to a whole number of cakes. 7 comes from multiplying 3.5 by 2 and ignoring the need to also divide by 3 as part of dividing by the fraction 2/3. 6 comes from rounding 5.25 up to the nearest whole number instead of down, wrongly assuming a 6th cake could be made from the leftover sugar.
- (a) 12 km/h — Method: convert 15 minutes to hours: 15 ÷ 60 = 0.25 h. Speed = distance ÷ time = 3 ÷ 0.25 = 12 km/h. Distractor origins: 9 km/h is the speed for the second section (3 km in 20 minutes) instead of the first; 8 km/h is the average speed for the whole journey (6 km in 45 minutes) instead of just the first section; 0.2 km/h divides 3 km by 15 without converting the minutes into hours.
- (a) It's an average over 20 days, which may miss the day-5 rate. — Method: a chord's gradient is the AVERAGE rate of change across the whole interval it spans; it only closely approximates the INSTANTANEOUS rate of change at a point inside that interval when the rate of change is roughly constant across the interval, which usually means the interval needs to be short. Working: here the chord spans 20 days while the point of interest, t = 5, is only a quarter of the way along it, so if the reservoir's level rose or fell at different rates over that time, the chord's gradient will not be close to the true gradient of the curve at t = 5 — this is the correct reason. Claiming the chord's gradient needs the water level at every day in between is wrong: a chord's gradient needs only the two endpoint values, at t = 0 and t = 20. Claiming a chord can only estimate the rate at its own endpoints is wrong: a chord between two points can be used to estimate the instantaneous rate of change at any point inside the interval, including one that is not an endpoint — that is exactly the technique being used here, and it is the SIZE of the interval that makes the estimate poor, not the fact that t = 5 is an interior point. Claiming the units do not match is wrong: the chord's gradient and the instantaneous rate of change are both measured in metres per day, so the units are the same. A chord is only a good estimate of an instantaneous rate when the interval it spans is short enough that the rate does not change much within it — always check how long the interval is compared with how far it is to the point you actually want.
- (d) (6, 2) — Applying the first vector: (2, 1) + (5, −3) = (7, −2), which is the warehouse. Applying the second vector: (7, −2) + (−1, 4) = (6, 2), the delivery address. '(7, −2)' stops at the warehouse and forgets the second flight. '(8, −6)' comes from adding (1, −4) instead of (−1, 4) for the second vector, getting both signs wrong. '(11, −3)' comes from swapping the components of the second vector to (4, −1) before adding.
- (d) 1/5 — Method: list the pairs systematically, work out each total, then count the pairs that meet the condition and compare that count with the length of the list. Working: the pairs and their totals are 1 and 2 giving 3, 1 and 3 giving 4, 1 and 4 giving 5, 1 and 5 giving 6, 2 and 3 giving 5, 2 and 4 giving 6, 2 and 5 giving 7, 3 and 4 giving 7, 3 and 5 giving 8, and 4 and 5 giving 9. That is 10 pairs, of which 2 have a total of more than 7. Answer: the probability is 1/5. The distractors: 2/5 comes from counting the totals of exactly 7 as well, reading 'more than 7' as '7 or more'; 1/10 comes from finding only the pair 4 and 5 and missing that 3 and 5 also beat 7; 4/5 comes from counting the pairs on the wrong side of the condition, the 8 pairs whose total is 7 or less.
- (c) No, 90 cm is far outside the heights on the graph — Method: a line of best fit describes the trend only across the stretch of data it was drawn through; predicting beyond that stretch is extrapolation, and nothing in the data supports it. Working: the heights used to draw this line run from 150 cm to 180 cm, all of them Year 10 pupils, while 90 cm is 60 cm below the shortest of them and belongs to a two-year-old child, whose build follows no trend the graph has measured. Substituting anyway gives 0.9 × 90 − 85 = −4, a mass of −4 kg, which cannot exist. Answer: no, because 90 cm is far outside the heights on the graph. The distractors: saying a line of best fit cannot be used to predict at all throws away its main purpose, since a prediction made between the plotted values is perfectly sound; saying the line passes through all 20 points misdescribes a line of best fit, which is drawn to follow the trend of the points and will normally pass through few of them; saying the equation works for any value put into it treats an equation fitted to Year 10 heights as a law of nature, and the mass of −4 kg shows what that assumption produces.
- (b) 11 — Method: roots and the multiplication are worked out before the addition and subtraction, and what is left is then worked through from left to right. Working: √144 = 12, √25 = 5 and 2 × 3 = 6, so the calculation becomes 12 − 6 + 5, which gives 6 + 5 = 11. Answer: 11. The distractors: 1 comes from carrying out the addition before the subtraction, giving 12 − (6 + 5) = 12 − 11 = 1; 35 comes from working from left to right with no priority, giving 12 − 2 = 10, then 10 × 3 = 30 and 30 + 5 = 35; 7 comes from combining the two roots as √(144 + 25) = √169 = 13 and then subtracting the product, giving 13 − 6 = 7.
- (a) 2/5 — Method: compare the equation with y = mx + c, where m is the gradient. Working: in y = (2x/5) − 3, the coefficient of x is 2/5. Answer: the gradient is 2/5. −3 comes from confusing the gradient with the y-intercept. 5/2 comes from inverting the fraction that multiplies x. −2/5 comes from wrongly carrying the negative sign from the −3 term onto the coefficient of x.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (c) Square — Because the cut is parallel to the square base, it produces a shape that is similar to the base — the same shape, scaled down — so it is also a square, with four equal sides, smaller than the base. A candidate who looks at the sloped triangular faces instead of at the horizontal cut answers triangle. A candidate who pictures a slanted cut, which would shorten one pair of sides, answers trapezium, but a cut parallel to the base scales all four sides by the same amount. A candidate who counts an extra side, perhaps including an edge of the base, answers pentagon. The cross-section is a square.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
- (b) 20 — Each length has its own error interval: 11.5 ≤ a < 12.5 and 6.5 ≤ b < 7.5. The upper bound of a sum is found by adding the upper bounds of both quantities: 12.5 + 7.5 = 20. Bounding only one of the two lengths and adding the other quantity's given value unbounded, 12.5 + 7 = 19.5, misses that both measurements carry their own uncertainty. Adding the lower bounds instead of the upper bounds, 11.5 + 6.5 = 18, gives the lower bound of the sum, not the upper one. Using a whole centimetre of error either side instead of half a centimetre, (12 + 1) + (7 + 1) = 21, comes from forgetting the error is half the rounding unit.
- (b) x = 3, y = 4 — −x² + 6x − 5 = −(x² − 6x) − 5 = −[(x − 3)² − 9] − 5 = −(x − 3)² + 9 − 5 = −(x − 3)² + 4. Because the coefficient of x² is negative, −(x − 3)² is at most zero, so this turning point is a maximum. Substituting x = 3 gives (x − 3)² = 0, so y = 4, confirming the maximum value 4 at x = 3: turning point (3, 4). Using 6 instead of half of 6 inside the bracket — forgetting to halve before completing the square — lands on turning point (6, 31), wrong, because only half the coefficient belongs inside the bracket. Reading the bracket's sign directly as the turning point's x-coordinate gives (−3, 4) — wrong, because (x − 3)² is zero at x = 3, not x = −3. Computing 5 − 9 = −4 instead of 9 − 5 = 4 flips the sign of the constant, giving (3, −4) — wrong, since the constant must be evaluated as 9 minus 5, not 5 minus 9. Whenever the leading coefficient is negative, the turning point is a maximum, not a minimum — check by substituting back into the original equation.
- (a) 3/4 — Write January's total over February's total: 360/480. Both numbers share a factor of 120, so dividing top and bottom by 120 gives 3/4. Choosing 4/3 comes from writing February's amount over January's amount, the wrong way round. Choosing 1/4 comes from finding the difference between the two months (480 − 360 = 120) and writing it over February's amount, instead of using January's amount. Choosing 3/7 comes from writing January's amount over the total received across both months (360 out of 840), instead of over February's amount alone.
- (d) (2/5)a + (3/5)b — Method: OP = OA + AP, and since AP : PB = 3 : 2 splits AB into 5 equal parts, AP is 3/5 of the whole of AB, with AB = b − a. Working: OP = a + 3/5(b − a) = a − (3/5)a + (3/5)b = (2/5)a + (3/5)b. Answer: OP = (2/5)a + (3/5)b. Using the ratio the wrong way round, as though it read AP : PB = 2 : 3, gives (3/5)a + (2/5)b; adding (3/5)b onto the whole of a without subtracting a inside the bracket first gives a + (3/5)b; and treating the ratio as 1 : 1 gives the midpoint, (1/2)a + (1/2)b. Convert the ratio to a fraction of AB measured from A, matching the ORDER the ratio is stated in, and subtract before you scale.
- (d) 6 — Method: rearrange the formula to make d the subject, then substitute C = 133. Working: C = 25 + 18d, so subtracting 25 from both sides gives C − 25 = 18d, then dividing by 18 gives d = (C − 25) / 18. Substituting C = 133: d = (133 − 25) / 18 = 108 / 18 = 6. The value 7.4 comes from dividing 133 by 18 without subtracting the fixed £25 first (133 / 18 ≈ 7.4). The value 4.6 comes from pairing the numbers the wrong way round, working out (133 − 18) / 25 = 4.6. The value 90 comes from subtracting both 25 and 18 from 133 instead of dividing by 18.
- (c) 3 : 2 — Method: 'A is k times B' means that if B is taken as 1 part then A is k parts, and a ratio in its simplest form is written with whole numbers that have no common factor. Working: taking B as 1, A is 1.5, so A : B = 1.5 : 1; multiplying both parts by 2 clears the decimal and gives 3 : 2, and 3 and 2 share no factor. Answer: 3 : 2. The distractors: 2 : 3 comes from writing B before A, reversing the order the question asks for; 1.5 : 1 is the right relationship but is not in its simplest form, because a ratio in its simplest form uses whole numbers; 3 : 5 comes from comparing A with the combined length rather than with B, since A : (A + B) = 1.5 : 2.5 = 3 : 5.
- (a) 9 — AB is a vertical segment, since A and B share the x-coordinate 1, and its length is the difference in y-coordinates: 5 − 1 = 4. BC is a horizontal segment, since B and C share the y-coordinate 5, and its length is the difference in x-coordinates: 6 − 1 = 5. The total path length is 4 + 5 = 9. 20 comes from multiplying the two lengths, 4 × 5, instead of adding them. 5 is only the length of BC, forgetting to include AB. 4 is only the length of AB, forgetting to include BC.
- (d) x = 0, y = −1 and x = 3, y = 5 — Set the two expressions for y equal: 2x − 1 = x² − x − 1. Rearranging, subtracting 2x and adding 1 to both sides: 0 = x² − x − 1 − 2x + 1 = x² − 3x, so x² − 3x = 0. Factorise: x(x − 3) = 0, giving x = 0 or x = 3. Using y = 2x − 1: x = 0 gives y = −1; x = 3 gives y = 5. Distractor routes: x = 0, y = −1 alone stops after the factor x = 0 and never checks the second factor, x − 3 = 0. x = 0, y = −1 and x = −3, y = −7 comes from mis-factorising x² − 3x as x(x + 3), a sign error that gives a second root of −3 instead of 3. x = −2, y = −5 and x = 1, y = 1 comes from adding 2x to both sides instead of subtracting it when rearranging, giving x² + x − 2 = 0 instead of x² − 3x = 0.
- (a) x = 4 or x = −3 — Method: find two numbers that multiply to give −12 and add to give −1 — these are −4 and 3. So x² − x − 12 = (x − 4)(x + 3) = 0, giving x = 4 or x = −3. Distractor origins: x = −4 or x = 3 has the signs the wrong way round; x = 4 or x = 3 makes both roots positive, ignoring the sign of −12; x = 12 or x = −1 comes from reading off the coefficient and the constant directly instead of factorising.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.