Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 1 (non-calculator)
The real Paper 1 is 1.5 hour 30 minutes and 80 marks, non-calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with no calculator-only items. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
Non-calculatorGCSE Higher
Answer key: GCSE Higher sample Paper 1 (non-calculator)
MathsUKwww.geekhero.co.uk
- (c) 4.1 × 10³, 3.2 × 10⁴, 2.9 × 10⁵ — The exponent decides the size first: 10³ is smaller than 10⁴, which is smaller than 10⁵, so the order is 4.1 × 10³, then 3.2 × 10⁴, then 2.9 × 10⁵. Reversing the whole list gives largest to smallest instead of smallest to largest. Comparing 3.2 × 10⁴ and 4.1 × 10³ by their coefficients alone, 3.2 against 4.1, and swapping them ignores that 10⁴ is bigger than 10³ regardless of the coefficient. Comparing 2.9 × 10⁵ and 3.2 × 10⁴ by their coefficients alone and swapping them makes the same mistake at the top of the list.
- (a) It gets closer to zero but never actually reaches it. — y = 60 × (0.5)ˣ is always positive, however large x is, because a positive number raised to any power stays positive. As x increases, (0.5)ˣ gets smaller and smaller but never equals zero, so y approaches zero without ever reaching it. Believing the curve reaches zero when x = 60, because 60 is the starting value, mixes up the y-intercept with a stopping point — an exponential decay curve like this one never actually reaches the x-axis, so this is wrong. Believing the curve goes negative for large x is wrong because multiplying a positive number by (0.5) any number of times can never produce a negative result. Believing the curve levels off at y = 0.5, confusing the base of the exponential with its eventual level, is wrong: the base only controls how fast the curve falls, not where it settles — this curve settles at y = 0, not y = 0.5. Whenever you sketch an exponential decay curve, draw it approaching the x-axis but never touching it.
- (a) 20% — Method: percentage increase = increase ÷ original amount × 100. Working: the increase is 84 − 70 = 14 marks, and 14 ÷ 70 = 0.2, so 0.2 × 100 = 20. Answer: an increase of 20%. The distractors: 14% comes from quoting the 14 mark increase as though marks and per cent were the same thing; 17% comes from dividing the 14 by the new mean 84 instead of by the original 70, which gives 17% to the nearest per cent; 120% is the new mean written as a percentage of the old one, which is the whole of the new mean rather than the increase.
- (c) Square — Because the cut is parallel to the square base, it produces a shape that is similar to the base — the same shape, scaled down — so it is also a square, with four equal sides, smaller than the base. A candidate who looks at the sloped triangular faces instead of at the horizontal cut answers triangle. A candidate who pictures a slanted cut, which would shorten one pair of sides, answers trapezium, but a cut parallel to the base scales all four sides by the same amount. A candidate who counts an extra side, perhaps including an edge of the base, answers pentagon. The cross-section is a square.
- (a) 5/8 — Winning, near-miss and losing are exhaustive, so the three probabilities sum to 1. Writing 1/4 as 2/8 so every fraction has the same denominator, 1 − 1/8 − 2/8 = 8/8 − 1/8 − 2/8 = 5/8. Subtracting only the winning probability and forgetting the near-miss probability gives 1 − 1/8 = 7/8. Subtracting only the near-miss probability and forgetting the winning probability gives 1 − 1/4 = 3/4. Adding the two given probabilities and stopping there gives 1/8 + 2/8 = 3/8, the probability that a ticket is winning or a near-miss, not the probability that it is losing.
- (c) 10 — Method: work out the mean that can be found straight away, then use total = mean × number of values on the group of three to find the missing number. Working: the mean of 15 and 25 is (15 + 25) ÷ 2 = 40 ÷ 2 = 20, so the group of three must also have a mean of 20; three numbers with a mean of 20 have a total of 20 × 3 = 60, and 20 + 30 = 50 of that total is already accounted for, so x = 60 − 50 = 10. Answer: 10, and checking, (10 + 20 + 30) ÷ 3 = 20. The distractors: 20 comes from working out the mean the two groups share and writing that down as x; −10 comes from dividing the group of three by 2 instead of by 3, which gives x + 50 = 40; 70 comes from reading the total 15 + 25 = 40 as the mean of the pair, which sets the target total at 120 and leaves x = 70.
- (a) 2, 3, 4, 5 — Method: work out which whole numbers satisfy both parts of the inequality. Working: n ≥ 2 means n can be 2 or more; n < 6 means n must be less than 6, so 6 itself is not included. The whole numbers that fit both conditions are 2, 3, 4 and 5. Answer: 2, 3, 4, 5. 2, 3, 4, 5, 6 treats < 6 as ≤ 6 and wrongly includes 6. 3, 4, 5 treats ≥ 2 as > 2 and wrongly leaves out 2. 1, 2, 3, 4, 5 wrongly includes 1, which does not satisfy n ≥ 2.
- (a) 4 — Rectangle 1: P = 2(9 + 4) = 2 × 13 = 26 cm. Rectangle 2: P = 2(6 + 5) = 2 × 11 = 22 cm. Difference = 26 − 22 = 4 cm. 2 comes from finding the difference between (l + w) for each rectangle, 13 − 11 = 2, but forgetting to double it. 26 comes from giving rectangle 1's whole perimeter instead of the difference between the two. 6 comes from doubling only the change in length, 2 × (9 − 6), and ignoring that the width also changed.
- (b) 7.2 m — Multiply the model wingspan by the scale factor: 15 × 48 = 720. This is in centimetres, and 720 cm = 7.2 m, since 1 m = 100 cm. Giving 0.31 m divides by the scale factor instead of multiplying (15 ÷ 48 ≈ 0.31), scaling the model down rather than the real aircraft up. Giving 72 m converts centimetres to metres by dividing by 10 instead of 100. Giving 0.72 m converts by dividing by 1000 instead of 100.
- (a) 1260° — The sum of the interior angles of a polygon with n sides is (n − 2) × 180°. For a nonagon, n = 9, so the sum is (9 − 2) × 180° = 7 × 180° = 1260°. 1620° uses 9 × 180° without subtracting 2 from n first. 140° is the size of a single interior angle of a regular nonagon (1260° ÷ 9), not the sum of all nine. 1440° uses (n − 1) × 180° = 8 × 180° instead of (n − 2) × 180°.
- (b) 0.225 — The relative frequency of rain is the number of rainy days out of all days recorded: 9 ÷ 40 = 0.225, which is noticeably less than the forecaster's claimed 0.3. Using the number of dry days, 40 − 9 = 31, as the denominator instead of the total of 40 gives 9 ÷ 31 = 0.29 (2 d.p.). Simply reporting the forecaster's claimed value, 0.3, without calculating anything from the data at all, ignores the recorded results completely. Misplacing the decimal point, treating 9 out of 40 as 9%, gives 0.09 instead of 0.225.
- (a) 1/2, 3/5, 2/3, 5/6 — Convert all four fractions to a common denominator of 30: 2/3 is 20/30, 3/5 is 18/30, 5/6 is 25/30, and 1/2 is 15/30. Ordering by these numerators, smallest to largest, gives 15/30, 18/30, 20/30, 25/30, which is 1/2, 3/5, 2/3, 5/6. Ordering by the size of the numerator in the original fractions, 1, 2, 3, 5, rather than converting to a common denominator, gives the wrong order 1/2, 2/3, 3/5, 5/6, because it ignores that the denominators are different. Ordering largest to smallest instead of smallest to largest, as the question asks, gives 5/6, 2/3, 3/5, 1/2. Using the rule "the bigger the denominator, the smaller the fraction" to place the last two, so that 5/6 is put below 2/3 because 6 is bigger than 3, gives 1/2, 3/5, 5/6, 2/3 — that rule only holds when the numerators are the same, and here 20/30 really is smaller than 25/30. So the correct order, smallest to largest, is 1/2, 3/5, 2/3, 5/6.
- (b) 1.6 m/s² — Acceleration is the change in velocity divided by the time taken: (11 − 3) ÷ 5 = 8 ÷ 5 = 1.6 m/s². Forgetting to subtract the initial velocity and dividing the final velocity by the time instead gives 11 ÷ 5 = 2.2 m/s². Inverting the fraction, dividing the time by the change in velocity, gives 5 ÷ 8 = 0.625 m/s². Finding the change in velocity, 8 m/s, but stopping without dividing by the time gives 8 m/s².
- (b) 1.00 litres — Total volume = 350 + 650 = 1000 cm³. Since 1000 cm³ = 1 litre, the smoothie is 1.00 litre. Using only the orange juice's 650 cm³ and converting that gives 0.65 litres, forgetting the mango juice entirely. Using only the mango juice's 350 cm³ gives 0.35 litres, forgetting the orange juice. Adding both volumes correctly to get 1000 cm³ but not converting to litres leaves the answer as 1000.00, which is the volume in the wrong unit.
- (c) $\binom{-4}{9}$ — The reverse of a translation negates both components, so the reverse of $\binom{4}{-9}$ is $\binom{-4}{9}$. $\binom{4}{9}$ is the student's mistake — only the bottom number has been negated, and the top number was left unchanged. $\binom{-4}{-9}$ makes the opposite error, negating only the top number. $\binom{4}{-9}$ is simply the original vector, unchanged.
- (a) An identity, true for every value of x — Expanding the bracket on the left gives 3x + 12, which matches the right-hand side exactly, so the statement is true for every value of x — this makes it an identity. A candidate who reasons that any statement with an equals sign must be an equation picks that option, missing that an equation is only true for particular value(s) of x, not all of them. A candidate who confuses an identity with a formula, because both relate two expressions, picks the formula option — but a formula connects two different quantities, such as area and side length, not two equivalent forms of the same expression. A candidate who assumes it can be solved for a single value of x, as with a normal equation, picks that option, not realising there is no single solution here.
- (d) £5.40 — Method: work out the reduced price at each shop separately, then subtract the smaller from the larger. Working: Shop A's reduced price is £45 × 0.8 = £36, and Shop B's reduced price is £34 × 0.9 = £30.60, so the difference is £36 − £30.60 = £5.40. Answer: £5.40. £11.00 comes from comparing the two ORIGINAL prices, £45 − £34, without applying either shop's reduction at all. £1.60 comes from finding Shop A's reduced price correctly, £36, but then subtracting Shop B's original (unreduced) price of £34 instead of its reduced price. £66.60 comes from adding the two reduced prices together, £36 + £30.60, instead of subtracting them.
- (b) Minor segment — Method: compare the sizes of the two regions cut off by the chord, and recall the term used for the smaller one. Working: the chord creates two segments; the smaller region is called the minor segment and the larger one the major segment. A student who answers major segment has picked the larger region by mistake instead of the smaller one. A student who answers minor arc has named the curved boundary rather than the two-dimensional region it encloses. A student who answers semicircle has wrongly assumed the chord must pass through the centre. Answer: minor segment.
- (c) 1, 7, 13, 19 — Method: substitute n = 1, 2, 3, 4 into the rule 6n − 5 in turn. Working: n = 1: 6 − 5 = 1. n = 2: 12 − 5 = 7. n = 3: 18 − 5 = 13. n = 4: 24 − 5 = 19. Answer: 1, 7, 13, 19. 6, 12, 18, 24 comes from using 6n on its own, forgetting to subtract 5. 5, 11, 17, 23 comes from using the rule 6n − 1 instead of 6n − 5, a slip in the constant. 0, 6, 12, 18 comes from using 6(n − 1) instead of 6n − 5, effectively shifting every term one position along.
- (d) 12√2 — The nth term of a geometric sequence is a × rⁿ⁻¹. Here a = 3, r = √2, n = 6, so the 6th term is 3 × (√2)⁵. Since (√2)² = 2, (√2)⁴ = (2)² = 4, so (√2)⁵ = (√2)⁴ × √2 = 4√2. The 6th term is 3 × 4√2 = 12√2. 15√2 comes from treating (√2)⁵ as 5√2 — multiplying the index by the surd instead of raising √2 to that power — then multiplying by 3 gives 3 × 5√2 = 15√2, which is wrong because powers of a surd do not scale linearly with the index. 24√2 comes from miscalculating (√2)⁴ as 8 instead of 4 (a squaring slip, since (√2)² = 2 but (√2)⁴ should be 2² = 4, not 2 × 4), giving 3 × 8√2 = 24√2. 4√2 comes from forgetting to multiply by the first term a = 3, leaving just (√2)⁵ = 4√2.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.