Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 1 (non-calculator)
The real Paper 1 is 1.5 hour 30 minutes and 80 marks, non-calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with no calculator-only items. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
Non-calculatorGCSE Higher
Answer key: GCSE Higher sample Paper 1 (non-calculator)
MathsUKwww.geekhero.co.uk
- (c) 3⁻³ — Method: when dividing powers of the same base, subtract the index of the number you are dividing by from the index of the number being divided, keeping them in the order the question writes them. Working: 2 − 5 = −3, so 3² ÷ 3⁵ = 3⁻³. It is worth checking this against the numbers: 3² = 9 and 3⁵ = 243, and 9 ÷ 243 = 1/27, which is 3⁻³. 3³ comes from subtracting the other way round, 5 − 2 = 3, which reverses the sign of the index and gives 27 instead of 1/27. 3⁷ comes from working out 2 + 5 = 7, which is the rule for multiplying powers, not dividing them. 3¹⁰ comes from multiplying the indices, 2 × 5 = 10, instead of subtracting them. Answer: 3⁻³.
- (d) The fixed call-out fee, charged before the hourly rate. — Method: compare the formula with C = (fixed charge) + (rate) × h, where the fixed charge is the part that does not depend on h. Working: in C = 40 + 25h, the term 25h depends on the number of hours, h, but 40 does not change however many hours the job takes. Answer: 40 is the fixed call-out fee. 'The hourly rate' confuses the fixed term with the coefficient of h, which is actually 25. 'The total cost for a job lasting 1 hour' comes from substituting h = 1 into the formula (40 + 25 = 65) rather than reading off the constant term. 'The number of hours worked before charging starts' wrongly treats the constant, which is in pounds, as if it were measured in hours.
- (a) 18 — Method: write both numbers with the same multiplier, turn the second ratio into an equation by cross-multiplying, solve for the multiplier and then build A from it. Working: let A = 3k and B = 5k, so 3k : (5k + 6) = 1 : 2; cross-multiplying gives 2 × 3k = 5k + 6, so 6k = 5k + 6 and k = 6; A = 3 × 6 = 18. Answer: 18, and the check works, because B = 30, B + 6 = 36 and 18:36 = 1:2. The distractors: 9 comes from reading the 6 as the difference between the two numbers — 5 − 3 = 2 parts, so one part is 3 and A is 3 × 3 — but the 6 is added to B, it is not the gap between A and B; 6 comes from solving A : (A + 6) = 1 : 2, adding the 6 to A instead of to B; 30 is the value of B, found from the correct multiplier but given in place of A.
- (b) x = 5 — Every point on a vertical line has the same x-coordinate, so the equation of a vertical line through (5, 2) is x = 5. "y = 5" mixes up the coordinates, using the x-value of 5 to write a y-equation. "y = 2" is the equation of the horizontal line through (5, 2), not the vertical one. "x = 2" uses the correct letter but the wrong coordinate, the y-value of 2 instead of the x-value of 5.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
- (a) 27 — Method: turn the mean into a total using total = mean × number of values, then subtract the numbers that are already known. Working: four numbers with a mean of 18 have a total of 18 × 4 = 72; the three known numbers give 10 + 15 + 20 = 45; so x = 72 − 45 = 27. Answer: 27, and checking, (10 + 15 + 20 + 27) ÷ 4 = 72 ÷ 4 = 18. The distractors: 72 comes from stopping at the total the four numbers must reach and never subtracting the known three; 18 comes from assuming the missing number must equal the mean; 45 comes from stopping at the total of the three known numbers.
- (c) 2700 cm² — Convert both lengths to the same unit before multiplying: 0.6 m = 60 cm. The area is 45 × 60 = 2700 cm². Multiplying without converting 0.6 m to centimetres at all, treating it as 0.6 cm, gives 45 × 0.6 = 27 cm². Converting 0.6 m to centimetres by multiplying by 10 instead of 100 gives 6 cm, and 45 × 6 = 270 cm². Converting 0.6 m to centimetres by multiplying by 1000 instead of 100 gives 600 cm, and 45 × 600 = 27000 cm².
- (b) (x − 3)/(x + 2) — Factorise both: x² − 9 = (x − 3)(x + 3) (difference of two squares), and x² + 5x + 6 = (x + 2)(x + 3) (two numbers multiplying to 6 and adding to 5, namely 2 and 3). The factor (x + 3) is common to both, so it cancels, leaving (x − 3)/(x + 2). Choosing −9/(5x + 6) comes from cancelling the x² terms directly without factorising first — x² is not a common factor of the whole numerator or denominator. Choosing (x + 3)/(x + 2) cancels the (x − 3) factor instead of the shared (x + 3) factor, and (x − 3) does not appear in the denominator to cancel with. Choosing x − 3 cancels the whole denominator (x + 2) as though it were equal to 1.
- (b) 10000 cm² — Method: an area conversion factor is the square of the length conversion factor, because both sides of the square are scaled. Working: a square metre is a square of side 100 cm, so its area is 100 × 100 = 10000 cm². Answer: 10000 cm². The distractors: 100 cm² comes from using the length factor without squaring it; 200 cm² comes from doubling the length factor instead of squaring it; 1000000 cm² comes from cubing the factor, which is the conversion for a volume, not an area.
- (b) 25 minutes — Method: a rate in litres per minute can only be used on a volume measured in litres, so convert the tank first and then divide. Working: 1 m³ = 1000 litres, so the tank holds 0.45 × 1000 = 450 litres, and the time is 450 ÷ 18 = 25. Answer: 25 minutes. Using 1 m³ = 100 litres gives 45 ÷ 18 = 2.5 minutes. Using 1 m³ = 1 000 000 litres, which is the factor that turns cubic metres into cubic centimetres, gives 450 000 ÷ 18 = 25 000 minutes. Multiplying by the rate instead of dividing by it gives 450 × 18 = 8100.
- (b) 0.225 — The relative frequency of rain is the number of rainy days out of all days recorded: 9 ÷ 40 = 0.225, which is noticeably less than the forecaster's claimed 0.3. Using the number of dry days, 40 − 9 = 31, as the denominator instead of the total of 40 gives 9 ÷ 31 = 0.29 (2 d.p.). Simply reporting the forecaster's claimed value, 0.3, without calculating anything from the data at all, ignores the recorded results completely. Misplacing the decimal point, treating 9 out of 40 as 9%, gives 0.09 instead of 0.225.
- (a) 1/4 — First find the fraction of the people who are children: the pool is 3 + 5 = 8 equal shares and the children take 5, so the children are 5/8 of the people. The boys are 2/5 of that, and 'of' means multiply: 2/5 × 5/8 = 10/40 = 1/4. Answering 2/5 gives the boys as a fraction of the children only, 3/20 multiplies by the adults' fraction 3/8 instead of the children's, and 3/5 is the fraction of the children who are girls.
- (a) 7 — Multiply the input by 2: 6 × 2 = 12. Then subtract 5: 12 − 5 = 7. A candidate who does the operations in the wrong order, subtracting 5 first and then multiplying by 2, gets (6 − 5) × 2 = 2. A candidate who only carries out the multiplication and forgets to subtract gets 12. A candidate who adds 5 instead of subtracting gets 6 × 2 + 5 = 17.
- (a) 375 g — Find the amount of flour needed per muffin: 150 ÷ 6 = 25 g. Multiply by the new number of muffins: 25 × 15 = 375 g. (60 g comes from using the scale factor the wrong way round, 6/15 × 150. 150 g comes from not scaling the recipe at all. 300 g comes from rounding the scale factor, 15 ÷ 6, down to 2 before multiplying.)
- (a) 56° — The angles of a triangle add up to 180°. Add the two known angles: 90° + 34° = 124°. Subtract from 180°: 180° − 124° = 56°.
- (d) 128 — In 2p³ the index belongs to p only, so cube p first and multiply by the coefficient afterwards. Cubing gives 4 × 4 × 4 = 64, and then 2 × 64 = 128. Cubing the coefficient as well would mean working out (2 × 4)³, which is 512. Reading the index as an instruction to multiply by 3 gives 2 × 4 × 3 = 24, and ignoring the coefficient altogether leaves 64.
- (c) 3 hours — Method: in inverse proportion the product of the two quantities is constant, and here that product is the distance. Working: 60 × 4 = 240 km, so at 80 km/h the time is 240 ÷ 80 = 3. Answer: 3 hours. The distractors: 5 hours 20 minutes comes from treating the relationship as direct, working out 4 × 80 ÷ 60; 2 hours 40 minutes comes from cutting the time by the fraction the speed rose by — the speed went up by one third, so the time was cut by one third — which is not how inverse proportion works; 4 hours comes from dividing the 240 km by the original speed of 60 km/h again instead of by the new speed.
- (b) 61° — Triangle OAT is isosceles because OA = OT, both radii, so its base angles are equal: angle OTA = angle OAT = (180° − 122°) ÷ 2 = 29°. The tangent PT meets the radius OT at 90°, by the tangent–radius theorem, so angle OTP = 90°. Since TA lies between TO and TP, angle OTP splits into angle OTA and angle ATP: angle ATP = 90° − 29° = 61°. Stopping after the isosceles step and reporting the base angle itself gives 29°. Finding the base angles as 180° − 122° without halving, then subtracting from 90°, gives 90° − 58° = 32°. Adding the base angle to 90° instead of subtracting it gives 90° + 29° = 119°. Subtract the base angle from the right angle, and 61° is what's left.
- (a) 25 — Gradient = change in y ÷ change in x = (100 − 0) ÷ (4 − 0) = 100 ÷ 4 = 25. Dividing time by distance instead of distance by time gives 0.04; multiplying the two values instead of dividing gives 400; stopping at the change in distance, 100, forgets to divide by the change in time.
- (b) 4 — Method: form the equation 30 + 25h = 130, where h is the number of hours, then solve for h. Working: subtract the call-out fee from the total bill: 25h = 130 − 30 = 100. Divide by the hourly rate: h = 100 ÷ 25 = 4. Answer: 4 hours. 5.2 comes from dividing the whole bill by the hourly rate without subtracting the fixed fee first, 130 ÷ 25. 3.5 comes from swapping the fee and the rate, subtracting the rate from the bill and dividing by the fee, (130 − 25) ÷ 30. 6.4 comes from adding the call-out fee to the bill instead of subtracting it, before dividing by the rate, (130 + 30) ÷ 25.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.