Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 1 (non-calculator)
The real Paper 1 is 1.5 hour 30 minutes and 80 marks, non-calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with no calculator-only items. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
Non-calculatorGCSE Higher
Answer key: GCSE Higher sample Paper 1 (non-calculator)
MathsUKwww.geekhero.co.uk
- (c) 20 — Method: work out each power separately before subtracting. Working: 6² = 36 and 4² = 16, so 6² − 4² = 36 − 16 = 20. Answer: 20. (4 comes from subtracting first, 6 − 4 = 2, and then squaring that result, instead of squaring each number first. 52 comes from adding the two squares, 36 + 16, instead of subtracting them. 2 comes from subtracting the two numbers, 6 − 4, and forgetting to square at all.)
- (c) −8 — (−2)³ = (−2) × (−2) × (−2) = −8, since multiplying three negative numbers gives a negative result. A candidate who forgets the sign of a negative number when cubing it might treat (−2)³ as if it were 2³ = 8. A candidate who multiplies −2 by 3 instead of cubing it might get −2 × 3 = −6. A candidate who combines both mistakes — multiplying by 3 and dropping the sign — might get 2 × 3 = 6.
- (d) The population is growing at 2500 people per year. — The gradient of a tangent to a graph gives the instantaneous rate of change of the quantity on the vertical axis with respect to the quantity on the horizontal axis, at that exact point — not the total change and not an average. Here the vertical axis is population in thousands and the horizontal axis is time in years, so the gradient is measured in thousands of people per year. A gradient of 2.5 means the population is growing at an instantaneous rate of 2.5 thousand people per year, and since P is measured in thousands, 2.5 × 1000 = 2500 people per year. This describes the rate of change at that instant, not the total increase over the 6 years and not an average population.
- (b) 6 cm — Method: the right angle is at A, so BC is the hypotenuse and AC is the side opposite the angle at B; sin B = opposite ÷ hypotenuse therefore gives AC ÷ BC = 3/5. Working: AC ÷ 10 = 3/5, so AC = 10 × 3 ÷ 5 = 6. Answer: 6 cm. The distractors: 8 cm is AB, the side next to the angle at B, which is what cos B = 4/5 produces — the right method used on the wrong side; 3 cm comes from reading the 3 in the ratio as a length and never scaling it up to the 10 cm hypotenuse; 30 cm comes from multiplying by 3 and forgetting to divide by 5.
- (d) 7/15 — Both socks are the same colour either if both are red or if both are blue. The probability both are red is 4/6 × 3/5 = 12/30. The probability both are blue is 2/6 × 1/5 = 2/30. Adding these gives 12/30 + 2/30 = 14/30 = 7/15. Choosing 2/5 comes from only working out the 'both red' path, 12/30, and forgetting the 'both blue' path also counts. Choosing 5/9 comes from treating the draws as if the first sock were replaced, using 4/6 × 4/6 + 2/6 × 2/6 = 20/36 = 5/9, instead of reducing the totals for the second draw. Choosing 7/18 comes from reducing the number of socks removed but not the number left to choose from, using 4/6 × 3/6 + 2/6 × 1/6 = 14/36 = 7/18, instead of 5 remaining socks for the second draw.
- (a) 1.6 — Method: on a histogram the height of a bar is the frequency density, and frequency density = frequency ÷ class width. Working: the class 15 ≤ t < 30 runs from 15 to 30, so its width is 30 − 15 = 15 minutes; the frequency is 24, so the frequency density is 24 ÷ 15 = 1.6. Answer: 1.6 people per minute. The distractors: 360 comes from multiplying the frequency by the class width, 24 × 15, which uses the area rule backwards — area gives the frequency, so the frequency must be divided by the width to give the height; 0.625 comes from dividing the class width by the frequency, 15 ÷ 24, reversing the formula; 0.8 comes from dividing by the upper class boundary, 24 ÷ 30, instead of by the width of the class.
- (b) 3²⁰ is larger — Method: two powers with different bases and different indices can be compared once they are rewritten with a common index, which is possible whenever the indices share a factor. Working: 30 and 20 have a highest common factor of 10, so 2³⁰ = (2³)¹⁰ = 8¹⁰ and 3²⁰ = (3²)¹⁰ = 9¹⁰. Both are now tenth powers, and since 9 is larger than 8, 9¹⁰ is larger than 8¹⁰. Answer: 3²⁰ is larger. The distractors: 2³⁰ is larger comes from comparing only the indices and choosing the power with the bigger index; They are equal comes from multiplying base by index, 2 × 30 and 3 × 20, and finding 60 each time; They cannot be compared without a calculator comes from assuming that powers this large can only be ranked by evaluating them in full.
- (c) a formula — A statement that shows how to calculate one quantity from others, using an equals sign, is a formula. P = 2l + 2w tells us how to work out the perimeter, P, from the length and width, so it is a formula. Distractor origins: 'an equation' confuses a formula linking several letters with an equation solved for one unknown value; 'an identity' confuses a formula with a statement that is true for every value of a single variable; 'an expression' forgets that an expression has no equals sign at all.
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (c) 0.5 — The real distance is 2 × 25000 = 50000 cm. Converting to metres, by dividing by 100, gives 500 m, and converting to kilometres, by dividing by 1000, gives 0.5 km. A candidate who divides the 50000 cm by 1000 in one go, applying the metres-to-kilometres factor straight to the centimetres, gets 50 km. A candidate who divides by 100 twice, treating 100 m as 1 km, gets 5 km. A candidate who slips one extra decimal place when converting 500 m to kilometres gets 0.05 km. The real distance is 0.5 km.
- (d) 3/36 — Method: list the results as ordered pairs, decide which totals satisfy the condition, count the pairs that give those totals and divide by the number of pairs there are. Working: there are 6 × 6 = 36 equally likely ordered pairs. Greater than 10 means a total of 11 or a total of 12. A total of 11 comes from (5, 6) and (6, 5); a total of 12 comes from (6, 6) alone, because both dice must show a 6. That is 2 + 1 = 3 pairs out of the 36. Answer: the probability is 3/36. The distractors: 2/36 comes from counting the two ways of making 11 and forgetting that 12 is greater than 10 as well; 4/36 comes from writing (6, 6) down twice, applying the rule that a pair can be turned round to a double that can only happen one way; 33/36 comes from reading the condition the wrong way round and giving the probability that the total is 10 or less.
- (a) 7 — Convert the mixed number to an improper fraction: 5 1/4 = 21/4. Dividing by 3/4 means multiplying by its reciprocal, 4/3: 21/4 × 4/3 gives 84/12, which simplifies to 7. So exactly 7 complete pieces of 3/4 m can be cut. Ignoring the 1/4 m and dividing only the whole number, 5 ÷ 3/4, gives 20/3, which is 6 complete pieces with some wood left over. Multiplying by 3/4 instead of its reciprocal, 21/4 × 3/4, gives 63/16, which is 3 complete pieces. Misreading 5 1/4 as the fraction 5/4, then dividing by 3/4, gives 5/3, which is only 1 complete piece. So 7 complete pieces can be cut from the plank.
- (c) 59 — Substitute n = 7: 7² + 2 × 7 − 4 = 49 + 14 − 4 = 59. A sign error on the +2n term, treating it as −2n, gives 49 − 14 − 4 = 31. Working out 7² + 2 × 7 but forgetting to subtract the final 4 gives 49 + 14 = 63. Using n = 6 instead of n = 7 gives 36 + 12 − 4 = 44.
- (a) 22p — First convert the hourly rate to pence: £13.20 = 1320p. Then convert from per hour to per minute by dividing by 60, since there are 60 minutes in an hour: 1320 ÷ 60 = 22p per minute. Working out 1320 × 60 = 79200p multiplies by 60 instead of dividing, going the wrong way between per hour and per minute. Working out 13.20 × 10 = 132p converts pounds to pence using the wrong power of ten, and dividing that by 60 carries the error through to give 2.2p. Working out 13.20 × 100 = 1320p converts the currency correctly but stops there, leaving the rate as pence per hour rather than completing the second conversion to pence per minute. The rate of pay is 22p per minute.
- (a) 0.1 m — Method: the sloping surface is the hypotenuse and the vertical rise is the side opposite the 30° angle, so rise = 4.8 × sin 30°; then compare that rise with the limit. Working: the exact value of sin 30° is one half, so the rise = 4.8 × 1/2 = 2.4 m. The limit is 2.5 m, and 2.5 − 2.4 = 0.1. Answer: the ramp is 0.1 m below the limit. Working out the rise and stopping there gives 2.4 m, which answers a question that was not asked. Dividing by sin 30° instead of multiplying gives 4.8 ÷ 0.5 = 9.6 and then 9.6 − 2.5 = 7.1 m. Treating sine as proportional to the angle, so that sin 30° is a third of sin 90°, gives 4.8 ÷ 3 = 1.6 and then 2.5 − 1.6 = 0.9 m.
- (a) 2x − 1 — Swap x and y: x = (y + 1)/2. Multiply both sides by 2: 2x = y + 1. Subtract 1 from both sides: y = 2x − 1, so f⁻¹(x) = 2x − 1. Writing 2x + 1 comes from not flipping the sign on the 1 when it is moved across the equals sign. Writing (x − 1)/2 comes from reversing the sign of the 1 but leaving the ÷2 from the original rule in place, instead of turning it into ×2. Writing x/2 − 1 comes from dividing only the x by 2 and treating the 1 as already outside the fraction.
- (b) 7.2 m — Multiply the model wingspan by the scale factor: 15 × 48 = 720. This is in centimetres, and 720 cm = 7.2 m, since 1 m = 100 cm. Giving 0.31 m divides by the scale factor instead of multiplying (15 ÷ 48 ≈ 0.31), scaling the model down rather than the real aircraft up. Giving 72 m converts centimetres to metres by dividing by 10 instead of 100. Giving 0.72 m converts by dividing by 1000 instead of 100.
- (a) 8,000,000 cm³ — Method: change the edge length into centimetres first and then cube it, because 1 m = 100 cm and a volume needs that conversion applied to all three dimensions. Working: 2 m = 2 × 100 = 200 cm, so the volume is 200 × 200 × 200. 200 × 200 = 40,000 and 40,000 × 200 = 8,000,000. Answer: 8,000,000 cm³. The distractors: 8,000 cm³ comes from converting 2 m to 20 cm and cubing that; 80,000 cm³ comes from cubing in metres to get 8 m³ and then multiplying by 10,000, the conversion factor for an area rather than the 1,000,000 a volume needs; 8 cm³ comes from cubing the 2 without converting at all and simply writing cm³ because the question asked for that unit.
- (d) 2x = 10 — Method: collect the x-terms on one side and the constants on the other, keeping the equals sign balanced. Working: 5x − 3x = 8 + 2, giving 2x = 10. Answer: 2x = 10. 2x = 6 comes from a sign error moving the constant, subtracting instead of adding: 8 − 2 = 6. 8x = 6 comes from adding the x-terms instead of subtracting them (5x + 3x = 8x), alongside the constant sign error. 2x = −10 comes from a sign error moving the constant the other way: −2 − 8 = −10.
- (d) An equation, true for one value of x — 2x + 5 = 17 is only true when x = 6, so it is an equation. A candidate who ignores the equals sign and focuses only on the x terms and numbers present picks the expression option. A candidate who sees an equals sign and assumes it must relate two different quantities, as a formula does, picks that option, missing that there is only one quantity, x, involved here. A candidate who wrongly checks whether both sides look similar in structure rather than testing specific values picks the identity option, missing that the two sides are not equal for every value of x.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.