Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
CalculatorGCSE Higher
GCSE Higher sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- 1.A car manufacturer offers a car in 6 colours and 4 trim levels. Two colour-and-trim combinations are not available: red with sport trim, and white with sport trim. Work out how many different colour-and-trim combinations are available.
- 2.A rectangular garden has length (x + 7) m and width (x − 7) m. Work out an expression for the area of the garden, giving your answer in its simplest form.
- 3.The concentration of a pollutant in a lake, in arbitrary units, follows the recurrence C_{n+1} = 0.75C_n + 40, with C_0 = 500: each week, 25% of the pollutant breaks down naturally, and then a further 40 units enter the lake from run-off. An ecologist classifies the lake as safe once C_n first drops below 300. Find the first whole number of weeks after which the lake is safe.
- 4.To prove that the angle at the centre is twice the angle at the circumference, a student draws radii OA and OC, where A and C are points on the circle and O is the centre. The student's first step is: 'Since OA = OC, both being radii of the circle, triangle OAC is isosceles, so angle OAC = angle OCA.' Is this first step correct?
- 5.The probability that it rains on a given morning is 0.3. If it rains, the probability that Priya's bus is late is 0.8. If it does not rain, the probability that her bus is late is 0.1. Work out the probability that her bus is late.
- 6.A composite (stacked) bar for a charity bake sale in Durham shows the number of cakes sold, split into three types. The bar has a total height of 80 cakes: 34 were sponge cakes, 26 were chocolate cakes and the rest were fruit cakes. Work out the percentage of the cakes sold that were fruit cakes.
- 7.A carpenter has a plank of wood 4.8 m long. She cuts off 3 pieces, each 0.9 m long, to make shelves. Work out the length of wood remaining.
- 8.The iterative formula xₙ₊₁ = 5 − 3/xₙ is used with starting value x₀ = 2.5, so that x₁ is the value after the formula has been used once. Work out x₄ correct to 3 significant figures.
- 9.A gardener mixes 300 ml of plant feed concentrate with 1.2 litres of water to make a spray. Write the ratio of concentrate to water in its simplest form.
- 10.Point P has coordinates (4, 2). P is rotated 90° clockwise about the point (1, 1), and the image is then reflected in the line x = 1. Work out the coordinates of the final image of P.
- 11.A seed company tests germination using results from three greenhouses. Greenhouse 1 plants 200 seeds and 172 germinate. Greenhouse 2 plants 150 seeds and 126 germinate. Greenhouse 3 plants 250 seeds and 212 germinate. Using the combined results from all three greenhouses, work out the best estimate of the number of seeds, out of a new batch of 4000 seeds, that would be expected to germinate.
- 12.A rope is measured as 15 m, correct to the nearest metre. Write down the error interval for the true length, l, of the rope.
- 13.Tom buys 2 notebooks and 6 pencils on Monday, priced at p pence each for a notebook and q pence each for a pencil. On Tuesday he buys 3 more notebooks and 1 more pencil. Write a simplified expression, in pence, for the total amount Tom has spent on notebooks and pencils.
- 14.The ratio of Josh's savings to Mia's savings is 4:7. Mia has £39 more than Josh. Work out Josh's savings.
- 15.A packaging designer is told a box has 6 faces, 12 edges and 8 vertices, and every face is a rectangle. To fit exactly onto a shelf, the designer needs to know whether the box must be a cube. Based only on this information, which solid must the box be?
- 16.A company charges for hiring chairs for a day. Hiring 1 chair costs £12, hiring 2 chairs costs £19, hiring 3 chairs costs £26, and hiring 4 chairs costs £33. Work out an expression, in terms of n, for the cost in pounds of hiring n chairs for a day.
- 17.1 metre = 100 cm. Work out how many square centimetres there are in 1 square metre.
- 18.A triangular sail for a small boat has a base of 2.4 m and a height of 1.75 m. Sailcloth costs £12.50 per m². Work out the total cost of the sailcloth needed for the sail.
- 19.A company's weekly profit, P thousand pounds, when it makes x thousand items is modelled by P = x² − 8x + 12, for x ≥ 0. Work out the values of x for which the company makes a loss.
- 20.A student is asked whether 3(x − 4) = 3x − 4 is an identity. Which statement gives the correct verdict and reason?
Answer key
- (c) 22 — Without restriction there are 6 × 4 = 24 combinations. Two specific combinations are not available, so subtract 2: 24 − 2 = 22. 24 comes from ignoring the restriction completely. 23 comes from subtracting only 1 of the 2 excluded combinations. 18 comes from removing the whole sport trim level, 6 × 3 = 18, instead of removing just the two excluded combinations.
- (d) x² − 49 — Area = length × width = (x + 7)(x − 7). Expanding: x × x = x², x × (−7) = −7x, 7 × x = 7x, 7 × (−7) = −49. The two middle terms −7x and 7x cancel, leaving x² − 49. A candidate who misremembers the difference-of-two-squares result as a sum gets x² + 49. A candidate who makes a sign error and treats both middle terms as −7x instead of cancelling gets x² − 14x − 49. A candidate who confuses area with perimeter and simply adds the length and width gets 2x.
- (a) 4 weeks — Apply the recurrence week by week. C_1 = 0.75 × 500 + 40 = 375 + 40 = 415. C_2 = 0.75 × 415 + 40 = 311.25 + 40 = 351.25. C_3 = 0.75 × 351.25 + 40 = 263.4375 + 40 = 303.4375. C_4 = 0.75 × 303.4375 + 40 = 227.578125 + 40 = 267.578125. C_3 = 303.4375 is still above 300, but C_4 = 267.58 has dropped below it, so the lake first becomes safe after 4 weeks. Taking 25% of the ORIGINAL 500 every week instead of 25% of the current amount, a flat 125 each time, gives 500 − 125 + 40 = 415, then 415 − 125 + 40 = 330, then 330 − 125 + 40 = 245, which crosses 300 a week too early and gives the wrong answer of 3 weeks. Continuing one extra step to C_5 = 0.75 × 267.578125 + 40 = 200.68 + 40 = 240.68 and calling it 5 weeks overshoots, since the concentration had already dropped below 300 at C_4. Forgetting the 40 units of run-off each week and only applying the decay gives C_1 = 0.75 × 500 = 375, then C_2 = 0.75 × 375 = 281.25 — this is already below 300 after only 2 weeks, because without the run-off the concentration falls much faster.
- (b) Yes — OA = OC (radii), so the base angles are equal. — Method: check the definition of a radius and the isosceles triangle property the step relies on. Working: every radius of a circle has the same length, so OA = OC regardless of where A and C sit on the circle — this alone makes triangle OAC isosceles, and the base angles opposite the two equal sides, angle OAC and angle OCA, must be equal. The verdict is Yes, for exactly that reason. Claiming OA and OC are only equal if they are drawn to 'the very same point' misunderstands what a radius is — A and C can be any two points on the circle and OA still equals OC. Claiming the triangle is isosceles because angle AOC is 90° reverses the logic: nothing in the step has fixed angle AOC at 90°, and even if it had, that alone would not explain why OA = OC. Claiming the triangle would need to be equilateral confuses isosceles (two equal sides) with equilateral (three equal sides) — only two sides, OA and OC, are being compared here.
- (c) 0.31 — Method: a late bus can be reached along two paths of the tree. Multiply along each path, then add the paths that end in a late bus. Working: the rain path gives 0.3 × 0.8 = 0.24. No rain has probability 1 − 0.3 = 0.7, so the second path gives 0.7 × 0.1 = 0.07. Adding the two paths gives 0.24 + 0.07. Answer: the probability is 0.31. The distractors: 0.9 comes from adding the two branch probabilities 0.8 and 0.1 without first weighting them by how often it rains; 0.24 comes from following the rain path only and ignoring that the bus can also be late when it is dry; 0.27 comes from using 0.3 at the start of both paths, so that the no-rain path is given 0.3 × 0.1 instead of 0.7 × 0.1.
- (d) 25% — First find the number of fruit cakes: 80 − 34 − 26 = 20. Then write this as a percentage of the total: 20 ÷ 80 × 100 = 25%. Giving 20% comes from reporting the count of fruit cakes, 20, directly as a percentage, without dividing by the total of 80 first. Giving 32.5% computes the percentage of chocolate cakes instead of fruit cakes: 26 ÷ 80 × 100 = 32.5%. Giving 42.5% computes the percentage of sponge cakes instead of fruit cakes: 34 ÷ 80 × 100 = 42.5%.
- (b) 2.1 m — The three pieces use 3 × 0.9 = 2.7 m of wood. Remaining wood = 4.8 − 2.7 = 2.1 m. A candidate who miscounts and only subtracts 2 pieces instead of 3 gets 4.8 − 1.8 = 3.0 m. A candidate who adds instead of subtracting gets 4.8 + 2.7 = 7.5 m. A candidate who gives the length used instead of the length remaining gets 2.7 m.
- (c) 4.30 — Method: substitute the starting value into the right-hand side to get x₁, then feed each value back in, keeping the whole display and respecting the order of operations, which divides before it subtracts. Working: x₁ = 5 − 3 ÷ 2.5 = 5 − 1.2 = 3.8; x₂ = 5 − 3 ÷ 3.8 = 5 − 0.78947… = 4.21052…; x₃ = 5 − 3 ÷ 4.21052… = 5 − 0.7125 = 4.2875; x₄ = 5 − 3 ÷ 4.2875 = 5 − 0.69970… = 4.30029…, which is 4.30 correct to 3 significant figures. Answer: 4.30. The distractors: 4.29 is x₃ = 4.2875 rounded, reached by counting the starting value itself as the first iterate and so stopping one use of the formula early; 3.80 is x₁, the value after a single use of the formula; 2.50 comes from working out (5 − 3) ÷ xₙ instead of 5 − (3 ÷ xₙ), subtracting before dividing, which produces the sequence 0.8, 2.5, 0.8, 2.5 and lands on 2.5 at the fourth step.
- (c) 1 : 4 — Convert to the same unit: 1.2 litres = 1200 ml, since 1 litre = 1000 ml. This gives the ratio 300 : 1200. Divide both parts by their highest common factor, 300, to get 1 : 4. Giving 3 : 12 divides by 100 only, which is a common factor but not the highest one. Giving 1 : 1.2 has not converted 1.2 litres into millilitres, so the two parts are not in the same unit. Giving 4 : 1 swaps the order, comparing water to concentrate instead of concentrate to water.
- (d) (0, −2) — To rotate (4, 2) by 90° clockwise about (1, 1), first find its position relative to the centre: (4 − 1, 2 − 1) = (3, 1). A 90° clockwise rotation sends (a, b) to (b, −a), so (3, 1) becomes (1, −3); adding the centre back gives (1 + 1, 1 − 3) = (2, −2). Reflecting (2, −2) in the line x = 1 gives (2 × 1 − 2, −2) = (0, −2). Doing the two transformations in the opposite order, reflecting first and then rotating, gives a different result, (2, 4), which shows the order matters. Stopping after the rotation and forgetting the reflection gives (2, −2). Stopping after only reflecting P in x = 1 and forgetting the rotation entirely gives (−2, 2). Rotate first, then reflect, in that order, and the final image is (0, −2).
- (d) 3400 — Combining all three greenhouses gives 200 + 150 + 250 = 600 seeds planted in total, and 172 + 126 + 212 = 510 germinated, so the combined estimate of the germination probability is 510/600 = 0.85. Out of a new batch of 4000 seeds, the expected number to germinate is 4000 × 0.85 = 3400. Writing 3440 is wrong because it uses only Greenhouse 1's rate, 172/200 = 0.86, instead of the combined rate from all three: 4000 × 0.86 = 3440. Writing 3360 is wrong because it uses only Greenhouse 2's rate, 126/150 = 0.84: 4000 × 0.84 = 3360. Writing 510 is wrong because that is the total number that germinated in the ORIGINAL trial, not scaled up to the new batch of 4000 seeds at all. The best estimate is 3400 seeds.
- (b) 14.5 ≤ l < 15.5 — A measurement given to the nearest metre could have been rounded from anywhere up to half a metre below or above it: 15 − 0.5 = 14.5 and 15 + 0.5 = 15.5. Every value from 14.5 up to (but not reaching) 15.5 rounds to 15, so the error interval is 14.5 ≤ l < 15.5, with the lower bound included and the upper bound excluded. Making both ends strict, 14.5 < l < 15.5, wrongly excludes 14.5 itself, even though 14.5 does round to 15. Making both ends inclusive, 14.5 ≤ l ≤ 15.5, wrongly includes 15.5, which actually rounds up to 16, not 15. Using a whole metre either side instead of half a metre, giving 14 ≤ l < 16, comes from forgetting that the error is only half the rounding unit.
- (a) 5p + 7q — Tom's total spend combines like terms: (2p + 6q) + (3p + q) = 5p + 7q, adding the notebook terms (2p + 3p = 5p) and the pencil terms (6q + q = 7q) separately. Answering 12pq adds every coefficient together (2 + 6 + 3 + 1 = 12) and multiplies the letters, combining unlike terms as though notebooks and pencils were the same item. Answering 5p + 6q correctly combines the notebook terms but forgets to add Tuesday's extra pencil to the 6q. Answering 2p + 7q correctly combines the pencil terms but forgets to add Tuesday's 3 extra notebooks to the 2p. The total amount Tom has spent is 5p + 7q pence.
- (b) £52 — Method: the difference between the two ratio numbers tells you how many parts the £39 difference represents. Working: the difference in parts is 7 − 4 = 3, and this represents £39, so one part is £39 ÷ 3 = £13. Josh's savings are 4 × £13 = £52. So Josh has £52. Distractor £91 is Mia's savings, not Josh's. Distractor £39 comes from using the given £39 difference as the final answer, without scaling it to Josh's number of parts. Distractor £13 is the value of one part, found correctly but never multiplied by 4.
- (b) Cuboid — not necessarily a cube — A solid with 6 faces, 12 edges and 8 vertices in which every face is a rectangle is a cuboid, but nothing here confirms that all the edges are the same length, so the box could be a cube or a non-cube cuboid; the most that can be concluded is that it is a cuboid, making 'Cuboid — not necessarily a cube' correct. 'Cube — only a cube fits this' is wrong because a cube is just one particular cuboid; a general cuboid with different length, width and height has exactly the same face, edge and vertex counts and rectangular faces. 'Triangular prism' is wrong because a triangular prism has 5 faces, 9 edges and 6 vertices, and two of its faces are triangles, so it matches neither the counts nor the face shape. 'Not enough information' is wrong because rectangular faces with these counts do pin the solid down to the cuboid family, even though they cannot pin down a cube specifically.
- (d) 7n + 5 — Method: find the rate charged per extra chair, then find the fixed part of the cost that fits hiring 1 chair. Working: the cost rises by £7 for each extra chair (19 − 12 = 7, 26 − 19 = 7, 33 − 26 = 7), so the cost has the form 7n + c. Substituting n = 1: 7(1) + c = 12, so c = 5. Answer: the cost in pounds is 7n + 5. The value 7n comes from ignoring the fixed part of the charge entirely. The value 7n + 12 comes from using the cost of 1 chair as the fixed part directly, without subtracting the per-chair rate first. The value 12n + 7 comes from swapping the roles of the cost of hiring 1 chair, £12, and the rate per extra chair, £7 — using the total for one chair as the coefficient of n and the rate as the fixed part.
- (b) 10000 cm² — Method: an area conversion factor is the square of the length conversion factor, because both sides of the square are scaled. Working: a square metre is a square of side 100 cm, so its area is 100 × 100 = 10000 cm². Answer: 10000 cm². The distractors: 100 cm² comes from using the length factor without squaring it; 200 cm² comes from doubling the length factor instead of squaring it; 1000000 cm² comes from cubing the factor, which is the conversion for a volume, not an area.
- (b) £26.25 — First multiply the base and height: 2.4 × 1.75 = 4.2. The area of the triangular sail is half of that: half of 4.2 is 2.1 m². Then multiply by the cost per m²: 2.1 × £12.50 = £26.25. £52.50 forgets to halve in the area formula, giving an area of 4.2 m² and doubling the true cost. £30.00 multiplies the base length by the cost per m² (2.4 × £12.50) without ever finding the area. £25.00 rounds the area to 2 m² before multiplying by the cost, losing accuracy.
- (b) 2 < x < 6 — Factorise: x² − 8x + 12 = (x − 2)(x − 6), giving roots at x = 2 and x = 6. Since the coefficient of x² is positive, the graph is a U-shape that is negative, below the axis, between its roots. So P < 0 for 2 < x < 6. Distractor routes: x < 2 or x > 6 takes the region outside the roots, which is where P is positive, a profit, the opposite of a loss. 2 ≤ x ≤ 6 includes the endpoints, where P = 0 exactly, break-even rather than a loss, since the inequality is strict. −6 < x < −2 comes from factorising as (x + 2)(x + 6), reversing the sign of both roots.
- (b) It is not even an ordinary equation with a solution: expanding the left-hand side gives 3x − 12, and 3x − 12 = 3x − 4 would require −12 = −4, which is never true. — Expanding the left-hand side, 3(x − 4) = 3x − 12. Setting this equal to the right-hand side, 3x − 12 = 3x − 4, gives −12 = −4 once the 3x terms are removed from both sides — a statement that is never true, so no value of x satisfies the equation at all, and it is certainly not an identity. The option about substituting a specific value misunderstands algebraic expansion, which holds for every x, not one chosen value. The option matching the first term wrongly assumes that is enough to prove equivalence. The option about multiplying the 4 by 3 on both sides is nonsensical, since there is only one bracket to expand, on the left-hand side.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.