Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
CalculatorGCSE Higher
GCSE Higher sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- 1.By first working out 2.9², then squaring your result, estimate 2.9⁴ to 2 significant figures.
- 2.Which of these is a formula, rather than an expression, an equation, or an identity?
- 3.A car is bought for £12000. Its value falls by 15% in the first year and by 10% in each year after that. Work out the value of the car 3 years after it was bought.
- 4.In triangle OAB, OA = a and OB = b. P is the point on OA such that OP = (1/3)a, and Q is the point on OB such that OQ = (1/3)b. Express the vector PQ in terms of a and b.
- 5.On Amelia's walk to school there are two sets of traffic lights. The probability that the first set is green when she reaches it is 0.4. The probability that the second set is green when she reaches it is 0.5. The two sets work independently of each other. Work out the probability that both sets are green.
- 6.The times, t minutes, of 70 visits to a website are grouped into two classes: 0 ≤ t < 4, which contains 30 visits, and 4 ≤ t < 20, which contains 40 visits. A histogram is drawn. Work out how many times taller the bar for 0 ≤ t < 4 is than the bar for 4 ≤ t < 20.
- 7.c = 50, correct to the nearest 10. d = 18, correct to the nearest whole number. Work out the upper bound of c − d.
- 8.The simple interest, £I, earned on a savings account is given by the formula I = PRT/100, where P is the amount invested in pounds, R is the interest rate per year and T is the time in years. Rearrange the formula to make P the subject.
- 9.A map's scale is given as '1 cm represents 2 km'. Write this scale in the form 1 : n.
- 10.A raised garden bed is a prism whose cross-section is a triangle with a base of 1.2 m and a perpendicular height of 0.8 m. The bed is 3 m long. Work out the volume of soil needed to fill it, in m³.
- 11.A clinic recorded 300 booked appointments using a frequency tree. The first branch splits them into 210 adult appointments and the rest child appointments. Of the adult appointments, 189 were attended and the rest were missed. Of the child appointments, 81 were attended. Work out the probability that a booked appointment, chosen at random from the 300, was missed. Give your answer as a fraction in its simplest form.
- 12.Which of these statements about −0.7 and −0.25 is true?
- 13.A car passes the 15 km marker on a road and passes the 195 km marker 3 hours later. Work out the gradient of the distance-time graph, that is the rate of change of distance with time.
- 14.Paint costs £14.40 for every 20 m² of wall it covers. Assuming the same rate, work out the cost of the paint needed to cover 56 m² of wall.
- 15.In triangle ABC, AB = x cm, AC = (x + 2) cm, BC = 15 cm and angle BAC = 100°. Work out the value of x. Give your answer to 1 decimal place.
- 16.A photo printing service has two adverts for its price. Advert A: cost in pounds = 3(2n + 4) for n photos. Advert B: cost in pounds = 6n + 12. A customer says the two adverts always charge the same amount. Is the customer correct?
- 17.A trust fund contains £8000. Each year, 5% interest is added, and then £600 is paid out to a charity. Work out the amount remaining in the fund after 2 years.
- 18.A circular plate has a diameter of 20 cm. Work out the area of the plate. Use π = 3.14.
- 19.The perimeter of a rectangle is given by the formula P = 2(l + w), where l is the length and w is the width. A rectangular garden has a perimeter of 46 m and a length of 14 m. Rearrange the formula to make w the subject, then work out the width of the garden.
- 20.Priya has a budget of £50 for a school trip. The coach costs £14 and each student ticket costs £4. Using the inequality 14 + 4s ≤ 50, work out the greatest number of student tickets, s, she can buy.
Answer key
- (a) 71 — 2.9⁴ = (2.9²)². First, 2.9² = 8.41. Then square that: 8.41² = 70.7281, since 841² = 707281 and the decimal point moves four places. To 2 significant figures this rounds to 71, because the figure after the first two significant figures (7 and 0) is a 7, which rounds the 0 up to 1. Rounding the working down instead of up — taking 70.7281 to 70 — ignores that the next figure is 5 or more. Rounding 2.9 up to 3 before doing any working at all, then computing 3⁴ = 81, uses a much cruder approximation and overshoots the true value. Rounding 8.41 all the way down to 8 before squaring, 8² = 64, rounds far too aggressively and loses the accuracy needed for 2 significant figures.
- (d) V = lwh — V = lwh is a formula: it relates one quantity, the volume V, to others, the length, width and height, in a way that is true generally. A candidate who picks lwh has chosen the expression, not a full statement relating two quantities. A candidate who picks lwh = 60 has chosen an equation, since it is only true for particular values of l, w and h that multiply to 60. A candidate who picks 2(l + w) ≡ 2l + 2w has chosen an identity, mistaking the identity symbol ≡ for a sign that makes a statement a formula.
- (d) £8262 — A fall of 15% is a multiplier of 0.85 and a fall of 10% is a multiplier of 0.9, and each multiplier acts on the value at the start of its own year. After year 1: 12000 × 0.85 = 10200. After year 2: 10200 × 0.9 = 9180. After year 3: 9180 × 0.9 = 8262. The value 3 years after the car was bought is £8262. Adding the percentages to make a single fall of 35% would be wrong, because the later falls are taken from smaller values.
- (c) (1/3)b − (1/3)a — Method: PQ runs from P to Q, so PQ = OQ − OP. Working: PQ = (1/3)b − (1/3)a. Answer: PQ = (1/3)b − (1/3)a. Subtracting the other way round gives (1/3)a − (1/3)b, the same vector pointing back from Q to P instead of P to Q; using 2/3 instead of the 1/3 that OP and OQ were actually given as gives (2/3)b − (2/3)a; and using the full vectors a and b with no scaling at all gives b − a, which is AB, not PQ. Always subtract START from END, OQ − OP, and carry the fraction given in the question through to your final vector.
- (a) 0.2 — Method: for independent events, the probability that both happen is the product of the two probabilities. Working: the first set is green with probability 0.4 and the second with probability 0.5, so the calculation is 0.4 × 0.5. Since 4 × 5 = 20 and the two factors carry one decimal place each, the product carries two. Answer: the probability is 0.2. The distractors: 0.9 comes from adding 0.4 and 0.5 instead of multiplying them; 0.45 comes from averaging the two probabilities; 0.1 comes from subtracting 0.4 from 0.5, treating the question as a difference.
- (d) 3 — Method: the height of a bar is its frequency density, frequency ÷ class width, so work out both heights and divide one by the other. Working: the class 0 ≤ t < 4 is 4 minutes wide and holds 30 visits, so its frequency density is 30 ÷ 4 = 7.5 per minute; the class 4 ≤ t < 20 is 16 minutes wide and holds 40 visits, so its frequency density is 40 ÷ 16 = 2.5 per minute; dividing the heights, 7.5 ÷ 2.5 = 3. Answer: the first bar is 3 times as tall. The distractors: 0.75 comes from comparing the frequencies, 30 ÷ 40, as though the frequencies were the heights, which is the mistake the unequal widths are there to expose; 4 comes from comparing the class widths, 16 ÷ 4, instead of the heights; 5 comes from subtracting the two frequency densities, 7.5 − 2.5, which answers how much taller rather than how many times taller.
- (a) 37.5 — The error intervals are 45 ≤ c < 55 and 17.5 ≤ d < 18.5. The maximum possible value of a difference comes from the largest possible value being reduced by the smallest amount: use the upper bound of c together with the LOWER bound of d, since subtracting less gives a bigger result: 55 − 17.5 = 37.5. Using the upper bound for both quantities, 55 − 18.5 = 36.5, forgets that subtracting a bigger number gives a smaller answer, not a bigger one. Using the lower bounds for both, 45 − 17.5 = 27.5, gives the lower bound of the difference instead of the upper one. Using the lower bound of c with the upper bound of d, 45 − 18.5 = 26.5, combines the two bounds the wrong way round entirely.
- (a) P = 100I / (RT) — Method: undo the operations done to P in reverse order — multiply by 100, then divide by R and by T. Working: I = PRT/100, so 100I = PRT, so P = 100I / (RT). Answer: P = 100I / (RT). P = IRT/100 comes from leaving R and T in the numerator instead of moving them to the denominator. P = 100RT/I comes from swapping P and I when rearranging. P = 100I/R comes from dividing by R only and forgetting to also divide by T.
- (b) 1:200000 — '1 cm represents 2 km' means 1 cm on the map is 2 km in real life. Convert 2 km into centimetres, the same unit as the 1: 2 km = 2000 m = 200 000 cm. So the scale is 1 : 200 000. Converting only as far as metres gives 1 : 2000 — the conversion to centimetres was never finished. Losing a zero in the conversion gives 1 : 20 000, ten times too small. Writing 1 : 2 without converting units at all compares 1 cm to 2 km directly, which is not a valid ratio since the units do not match.
- (c) 1.44 m³ — The cross-section is a triangle, so its area = base × height ÷ 2. Base × height = 1.2 × 0.8 = 0.96 m², and half of that is 0.96 ÷ 2 = 0.48 m². The volume of the prism = cross-sectional area × length = 0.48 × 3 = 1.44 m³. A pupil who forgets to halve when finding the triangle's area gets 1.2 × 0.8 × 3 = 2.88 m³. A pupil who ignores the height altogether, treating the cross-section as base × length, gets 1.2 × 3 = 3.6 m³. A pupil who correctly finds the cross-sectional area but forgets to multiply by the length of the bed stops at 0.48 m³. The correct volume of soil is 1.44 m³.
- (c) 1/10 — On the adult branch, 210 − 189 = 21 appointments were missed. There are 300 − 210 = 90 child appointments, and 90 − 81 = 9 of those were missed. In total, 21 + 9 = 30 appointments were missed, out of 300: 30/300 = 1/10. Writing 7/100 is wrong because 21/300 simplifies to 7/100, and 21 only counts the adult branch, leaving out the 9 missed child appointments. Writing 3/100 is wrong because 9/300 simplifies to 3/100, and 9 only counts the child branch, leaving out the 21 missed adult appointments. Writing 1/9 is wrong because it divides the 30 missed appointments by the 270 that were attended (300 − 30) instead of by the whole 300 booked. The probability is 1/10.
- (b) −0.7 < −0.25 — Method: compare the two negative decimals by their distance from zero on a number line. Working: −0.7 is 0.7 away from zero and −0.25 is 0.25 away from zero, so −0.7 is further from zero in the negative direction, making it the smaller number. Answer: −0.7 < −0.25 is true. "−0.7 > −0.25" comes from comparing 0.7 and 0.25 as if both numbers were positive, ignoring the negative signs. "−0.7 = −0.25" comes from assuming the two numbers are equal because they are both negative decimals. "−0.7 ≥ −0.25" combines the false statement "−0.7 > −0.25" with the false statement "−0.7 = −0.25".
- (b) 60 km/h — Method: the gradient of a distance-time graph is the change in distance divided by the change in time, and for a journey at a steady rate that gradient is the speed. Working: the change in distance is 195 − 15 = 180 km and the change in time is 3 hours, so the gradient is 180 ÷ 3 = 60 km/h. Answer: 60 km/h. The distractors: 180 km/h comes from stopping at the change in distance and never dividing by the 3 hours; 195 km/h comes from reading the final marker as the rate instead of working with the change between the two markers; 3 km/h comes from quoting the time taken, which belongs on the bottom of the fraction, as though it were the value of the fraction itself.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (d) 8.8 — Method: substitute into the cosine rule BC² = AB² + AC² − 2 × AB × AC × cos(BAC) and solve the resulting quadratic in x, keeping only the positive root. Working: 15² = x² + (x + 2)² − 2x(x + 2) cos 100°, which expands to a quadratic with two roots, x = 8.8 and x = −10.8; since x is a length, x = 8.8. Expanding (x + 2)² as x² + 4 instead of x² + 4x + 4, missing the middle term, gives x = 9.6; using +2x(x + 2) cos 100° instead of −2x(x + 2) cos 100° (a sign error on the cosine term) gives x = 10.6; and reporting the size of the rejected negative root instead of discarding it gives x = 10.8. Always expand a squared bracket fully before collecting terms.
- (a) They always charge the same, since 3(2n + 4) = 6n + 12. — Expand Advert A's formula by multiplying both terms inside the bracket by 3: 3 × 2n = 6n, and 3 × 4 = 12, giving 3(2n + 4) = 6n + 12, which is identical to Advert B's formula — so the two adverts always charge the same amount, whatever n is. Getting 6n + 4 comes from multiplying the 2n by 3 but leaving the 4 unmultiplied. Getting 2n + 7 comes from adding 3 to the bracket instead of multiplying by it. Saying it depends on n avoids expanding the bracket at all — once expanded, both formulas are identical for every value of n, so the cost can be compared directly.
- (c) £7590 — Apply interest, then subtract the payment, once for each year. Year 1: 8000 × 1.05 = 8400, then 8400 − 600 = 7800. Year 2: 7800 × 1.05 = 8190, then 8190 − 600 = 7590, so £7590 remains after 2 years. Forgetting the payments altogether and only compounding the interest gives 8000 × 1.05 = 8400, then 8400 × 1.05 = 8820 — this ignores that £600 leaves the fund every year. Subtracting the £600 BEFORE adding interest each year, instead of after, gives (8000 − 600) × 1.05 = 7770, then (7770 − 600) × 1.05 = 7528.50, which changes the order the two operations happen in and so changes the amount that earns interest each year. Subtracting the two payments as one lump sum of £1200 at the very end, from the no-withdrawal total 8820 − 1200 = 7620, ignores that the first £600 withdrawal also stops earning interest during the second year. Always apply interest, then the withdrawal, in that order, once for every single year.
- (a) 314 cm² — Method: the area of a circle is πr², and the radius is half the diameter, so halve the 20 cm before squaring. Working: r = 20 ÷ 2 = 10 cm, so the area is 3.14 × 10² = 3.14 × 100 = 314. Answer: 314 cm². The distractors: 1256 cm² comes from putting the diameter straight into πr² without halving it, 3.14 × 20²; 628 cm² comes from halving correctly but then using 2πr², a mixture of the circumference and area formulae; 62.8 cm² comes from working out πd = 3.14 × 20, which is the circumference of the plate rather than its area.
- (a) 9 m — Undo the multiplication by the bracket first: dividing both sides by 2 gives P/2 = l + w. Subtracting the length from both sides gives w = P/2 − l. Substituting the measurements, 46 ÷ 2 = 23, and 23 − 14 = 9, so the width is 9 m. Taking the length off before halving gives (46 − 14) ÷ 2 = 16, which halves the length as well; expanding to P = 2l + 2w and then forgetting to divide by 2 gives 46 − 28 = 18; subtracting the length in the wrong direction gives 23 + 14 = 37.
- (b) 9 — Subtract 14 from both sides: 4s ≤ 36. Divide both sides by 4: s ≤ 9, so the greatest number of tickets is 9. A candidate who forgets the £14 coach cost solves 4s ≤ 50, getting s ≤ 12.5, rounded down to 12. A candidate who adds the £14 instead of subtracting it solves 4s ≤ 64, getting s = 16. A candidate who miscalculates 50 − 14 as 32 solves 4s ≤ 32, getting s = 8.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.