Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
CalculatorGCSE Higher
GCSE Higher sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- 1.Hannah works out 3.1 × 19.6 on her calculator and writes down 6.076. Work out an estimate for 3.1 × 19.6, by rounding each number to 1 significant figure.
- 2.Which expression is equivalent to 6x − (2x − 5)?
- 3.A market stall sells apples at a fixed price per kilogram. Priya buys 3 kg for £5.40. Write the ratio of the mass in kilograms to the cost in pounds, in its simplest form.
- 4.A scale drawing uses a scale of 1 : 60. A path on the drawing is measured as 9.8 cm long. What is the real length of the path, in metres, to 1 decimal place?
- 5.A basketball player takes two free throws, and the throws are independent. The probability of scoring on each throw is 0.6, and the probability of missing is 0.4. Work out the probability that she scores exactly one of the two throws.
- 6.A histogram shows the speeds, v mph, of 100 vehicles passing a checkpoint. The bar for 0 ≤ v < 20 has a frequency density of 1 vehicle per mph, the bar for 20 ≤ v < 30 has a frequency density of 3 vehicles per mph, the bar for 30 ≤ v < 50 has a frequency density of 2 vehicles per mph, and the bar for 50 ≤ v < 70 has a frequency density of 0.5 vehicles per mph. Estimate the mean speed of the vehicles.
- 7.A quantity surveyor calculates a length as 24.6851 m. Round this length to 2 decimal places.
- 8.Expand and simplify (x + 1)(x + 2)(x + 3).
- 9.The height of a ball, in metres, above the ground is plotted against time, in seconds, after it is thrown. The tangent to the graph at t = 1.5 seconds has gradient 2. Which of these four statements about the ball at t = 1.5 seconds is correct?
- 10.A shop stacks tins in a display block. The front elevation of the block is 4 tins wide and 3 tins high. The side elevation shows the block is 2 tins deep. Every position in the block is filled. How many tins are used in total?
- 11.A train company runs 25 trains a day, every day. The probability that any one train is late is 0.08. Work out how many late trains the company should expect over a period of 4 weeks.
- 12.A cinema has 250 seats. 12% of the seats are reserved. Work out how many of the seats are reserved.
- 13.The graph of y = f(x) has a minimum point at (4, −1). Write down the coordinates of the corresponding turning point on the graph of y = −f(x).
- 14.In a bag the ratio of red counters to blue counters is 7 : 4. Write the number of red counters as a fraction of the number of blue counters.
- 15.A cuboid-shaped shipping crate has a length of 12 m, a width of 5 m, and a volume of 360 m³. Work out the height of the crate, in metres.
- 16.A car's speed-time graph shows the following: its speed increases steadily from 0 m/s to 20 m/s over the first 10 seconds, then stays constant at 20 m/s for the next 15 seconds. Work out the total distance travelled in the first 25 seconds.
- 17.A worker is paid £13.20 per hour. Work out this rate of pay in pence per minute.
- 18.Point E is at (4, 2). It is rotated 180° about the point (1, 1). Work out the coordinates of the image of point E.
- 19.Solve 3x + 14 = 8x − 6
- 20.The formula for converting a temperature from degrees Celsius, C, to degrees Fahrenheit, F, is F = 1.8C + 32. Work out F when C = 20, and identify what kind of mathematical statement F = 1.8C + 32 is.
Answer key
- (d) 60 — Method: round each number to 1 significant figure and multiply; the estimate then shows whether the calculator answer is sensible. Working: 3.1 rounds to 3 and 19.6 rounds to 20, so the estimate is 3 × 20 = 60. Answer: 60. Hannah's 6.076 is about ten times too small, which is what happens when 19.6 is keyed in as 1.96. The distractors: 62 comes from rounding 19.6 only and leaving 3.1 as it stands, giving 3.1 × 20 = 62; 6 comes from trusting the calculator display rather than checking it against an estimate; 600 comes from rounding 19.6 to 200 instead of to 20, a place-value slip, giving 3 × 200 = 600.
- (d) 4x + 5 — A minus sign directly before a bracket changes the sign of both terms inside it: 6x − (2x − 5) = 6x − 2x + 5 = 4x + 5. The option 4x − 5 comes from only changing the sign of the 2x term and not the −5, giving 6x − 2x − 5. The option 8x − 5 comes from adding 2x instead of subtracting it, as if the minus sign did not apply to the bracket, giving 6x + 2x − 5. The option 8x + 5 repeats that same addition mistake and also changes the sign of the −5 term.
- (c) 5 : 9 — Write the ratio mass : cost = 3 : 5.4. Multiply both parts by 10 to clear the decimal: 30 : 54. Both numbers share a factor of 6, so 30 ÷ 6 = 5 and 54 ÷ 6 = 9, giving 5 : 9. 3 : 5 comes from ignoring the decimal point and treating £5.40 as £5. 9 : 5 comes from writing the ratio the wrong way round, cost to mass instead of mass to cost. 1 : 18 comes from multiplying only the cost by 10 instead of both parts, giving 3 : 54, and then cancelling that correctly to 1 : 18 — the cancelling is fine, but the ratio being cancelled is not the right one.
- (a) 5.9 — The real length is 9.8 × 60 = 588 cm. Converting to metres, by dividing by 100, gives 5.88 m, which rounds to 5.9 m to 1 decimal place. A candidate who rounds 5.88 down instead of up gets 5.8 m. A candidate who forgets to convert from centimetres to metres gets 58.8. A candidate who divides by 60 instead of multiplying gets 0.16, to 2 decimal places. The real length, to 1 decimal place, is 5.9 m.
- (a) 0.48 — There are two ways to score exactly one throw: scoring on the first and missing the second, 0.6 × 0.4 = 0.24, or missing the first and scoring the second, 0.4 × 0.6 = 0.24. Adding these gives 0.24 + 0.24 = 0.48. Choosing 0.24 comes from working out only one of the two paths and forgetting the other one also gives exactly one score. Choosing 0.36 comes from working out the probability of scoring BOTH throws, 0.6 × 0.6 = 0.36, instead of exactly one. Choosing 0.84 comes from working out the probability of scoring AT LEAST one throw, 1 − 0.4 × 0.4 = 0.84, instead of exactly one.
- (a) 31.5 — Method: to estimate the mean from a histogram, first turn each bar into a frequency (frequency density × class width), then use mean = Σ(frequency × midpoint) ÷ Σfrequency, with the midpoint standing in for every value in that class. Working: the four classes have widths 20, 10, 20 and 20, so their frequencies are 1 × 20 = 20, 3 × 10 = 30, 2 × 20 = 40 and 0.5 × 20 = 10, which do add to the 100 vehicles stated. Their midpoints are 10, 25, 40 and 60, so Σfx = 20 × 10 + 30 × 25 + 40 × 40 + 10 × 60 = 200 + 750 + 1600 + 600 = 3150, and the mean is 3150 ÷ 100 = 31.5. Answer: the estimated mean speed is 31.5 mph. Watch which numbers you treat as the frequencies and which as the values: using the frequency densities themselves as the frequencies, without multiplying by the class widths first, gives 1 × 10 + 3 × 25 + 2 × 40 + 0.5 × 60 = 195 spread over 1 + 3 + 2 + 0.5 = 6.5, and 195 ÷ 6.5 = 30, a mean built from the wrong 'frequencies' altogether; averaging the four midpoints on their own, (10 + 25 + 40 + 60) ÷ 4 = 33.75, ignores how many vehicles are actually in each class; and using each class's lower boundary in place of its midpoint, 20 × 0 + 30 × 20 + 40 × 30 + 10 × 50 = 2300 and 2300 ÷ 100 = 23, systematically underestimates every class by roughly half its width.
- (d) 24.69 — To round to 2 decimal places, look only at the third decimal digit to decide whether the second decimal digit rounds up. In 24.6851 the third decimal digit is 5, and since 5 is 5 or more, the second decimal digit rounds up from 8 to 9, giving 24.69. Rounding to 1 decimal place instead of 2 gives 24.7, one place value too coarse. Keeping the third decimal digit rather than dropping it gives 24.685, which is 3 decimal places. Looking at the fourth decimal digit, 1, instead of the third one, and wrongly deciding that no rounding is needed, leaves the length unrounded at 24.68.
- (d) x³ + 6x² + 11x + 6 — (x + 1)(x + 2) = x² + 3x + 2. Multiplying by (x + 3): (x² + 3x + 2)(x + 3) = x³ + 3x² + 2x + 3x² + 9x + 6, which simplifies to x³ + 6x² + 11x + 6. Choosing x³ + 6x² + 6x + 6 has the right x² and constant terms but adds 1 + 2 + 3 = 6 for the x-coefficient instead of the correct sum of pairwise products 1×2 + 1×3 + 2×3 = 11. Choosing x³ + 5x² + 11x + 6 sums only two of the three constants (2 + 3 = 5) for the x² coefficient, leaving out the 1. Choosing x³ + 6x² + 11x + 5 adds the last two constants (2 + 3 = 5) instead of multiplying all three (1 × 2 × 3 = 6) for the constant term.
- (c) Height rising at 2 m/s at t = 1.5 s — A tangent's gradient on a height-time graph is the instantaneous rate of change of height, in metres per second, so gradient 2 means the ball's height is increasing at 2 m/s at t = 1.5 s. Saying the height 'is 2 m' confuses the gradient, a rate, with the y-value on the graph, which is the ball's height itself. Saying the ball 'travelled 2 m from t = 1 to t = 2' treats the instantaneous gradient at one instant as if it were the total distance risen over a whole one-second interval, which is a different quantity found from two height readings, not from one tangent. Saying the speed 'is 2 m/s²' uses the wrong units — m/s² measures acceleration, the rate of change of speed, not speed itself. Always check that the units quoted match what a height-time graph's gradient can actually give you: metres per second.
- (a) 24 — The display is 4 tins wide, 3 tins high and 2 tins deep, and every position in that block is filled, so the total number of tins is the product of all three measurements: 4 × 3 × 2 = 24. "12" comes from multiplying only the width and height shown in the front elevation (4 × 3), forgetting the depth entirely. "9" comes from adding the three measurements (4 + 3 + 2) instead of multiplying them. "6" comes from multiplying only the height and depth (3 × 2), forgetting the width shown by the front elevation.
- (d) 56 — Method: count the trials over the whole period first, then multiply the number of trials by the probability. Working: 4 weeks is 4 × 7 = 28 days, and at 25 trains a day that is 25 × 28 = 700 trains. The expected number of late trains is 700 × 0.08 = 56. Answer: about 56 late trains over the 4 weeks. The distractors: 2 is the expected number for a single day, 25 × 0.08 = 2, with the 28 days never brought in; 14 uses one week instead of four, 25 × 7 × 0.08 = 14; 644 is 700 − 56 and counts the trains expected to be on time.
- (b) 30 — Method: 12% of an amount is 12/100 of it, so find 1% by dividing by 100 and then multiply by 12. Working: 1% of 250 is 250 ÷ 100 = 2.5, and 12% is 2.5 × 12 = 30. Answer: 30 seats. The distractors: 3 comes from writing 12% as 0.012 instead of 0.12, giving 0.012 × 250 = 3; 25 comes from finding 10% of the seats and stopping there; 24 comes from counting 12 seats for each whole hundred, 12 + 12 = 24, and ignoring the remaining 50 seats.
- (a) (4, 1) — y = −f(x) reflects the graph of y = f(x) in the x-axis: every point (x, y) maps to (x, −y). Applying this to (4, −1): the x-coordinate stays 4, and the y-coordinate −1 becomes its negative, 1. Leaving the y-coordinate unchanged skips the reflection entirely, giving (4, −1); reflecting the x-coordinate instead, or reflecting both, mixes this up with a reflection in the y-axis or a rotation, giving (−4, −1) or (−4, 1).
- (d) 7/4 — A part-to-part ratio a : b gives the fraction a/b when the first quantity is written as a fraction of the second, so 7 : 4 gives 7/4. Writing 4/7 puts the parts the wrong way round — blue as a fraction of red, not red as a fraction of blue. Writing 7/11 uses the total number of counters, 7 + 4 = 11, as the denominator instead of the number of blue counters — that is red as a fraction of the whole bag, not red as a fraction of blue. Writing 11/7 has both the wrong denominator and the parts inverted.
- (b) 6 m — Volume of a cuboid = length × width × height, so height = volume ÷ (length × width) = 360 ÷ (12 × 5) = 360 ÷ 60 = 6 m. A pupil who divides the volume by the length only gets 360 ÷ 12 = 30 m. A pupil who divides the volume by the width only gets 360 ÷ 5 = 72 m. A pupil who subtracts length × width from the volume instead of dividing gets 360 − 60 = 300 m. The correct height is 6 m.
- (d) 400 m — The distance travelled equals the area under the speed-time graph. The first 10 seconds form a triangle with base 10 and height 20, giving an area of 0.5 × 10 × 20 = 100 m. The next 15 seconds form a rectangle with base 15 and height 20, giving an area of 15 × 20 = 300 m. The total distance is 100 + 300 = 400 m. The option 500 m treats the whole 25 seconds as travelled at the constant 20 m/s, ignoring that the speed was building up during the first 10 seconds: 25 × 20 = 500. The option 300 m only counts the constant-speed section and forgets the triangle section entirely. The option 200 m comes from working out the triangle's area without halving it (10 × 20 = 200) and forgetting the rectangle altogether.
- (a) 22p — First convert the hourly rate to pence: £13.20 = 1320p. Then convert from per hour to per minute by dividing by 60, since there are 60 minutes in an hour: 1320 ÷ 60 = 22p per minute. Working out 1320 × 60 = 79200p multiplies by 60 instead of dividing, going the wrong way between per hour and per minute. Working out 13.20 × 10 = 132p converts pounds to pence using the wrong power of ten, and dividing that by 60 carries the error through to give 2.2p. Working out 13.20 × 100 = 1320p converts the currency correctly but stops there, leaving the rate as pence per hour rather than completing the second conversion to pence per minute. The rate of pay is 22p per minute.
- (d) (−2, 0) — A 180° rotation about a centre (a, b) maps (x, y) to (2a − x, 2b − y). Here that gives (2 × 1 − 4, 2 × 1 − 2) = (−2, 0). A pupil who rotates about the origin instead of (1, 1) gets (−4, −2). A pupil who adds the centre's coordinates instead of applying the rotation formula gets (4 + 1, 2 + 1) = (5, 3). A pupil who just subtracts the centre's coordinates from E's, without doubling and reversing, gets (4 − 1, 2 − 1) = (3, 1). The correct image is (−2, 0).
- (c) x = 4 — Method: with an unknown on both sides, subtract the smaller x term from both sides so that all the x is on one side, then collect the numbers on the other. Working: subtracting 3x from both sides gives 14 = 5x − 6; adding 6 to both sides gives 20 = 5x; dividing both sides by 5 gives x = 4. Checking: 3 × 4 + 14 = 26 and 8 × 4 − 6 = 26. Answer: x = 4. The distractors: x = 2.5 comes from taking 3x off the left-hand side only, leaving 14 = 8x − 6 and so 8x = 20; x = −1.6 comes from changing the sign of the 8x when it is moved across but leaving the sign of the 14 unchanged, giving 3x − 8x = −6 + 14 and so −5x = 8; x = 15 comes from reaching 5x = 20 correctly and then subtracting 5 instead of dividing by 5.
- (d) 68, and it is a formula — Substituting C = 20 gives F = 1.8 × 20 + 32 = 36 + 32 = 68. The statement F = 1.8C + 32 is a formula because it expresses a general relationship between F and C that holds for any value of C, not just C = 20. A candidate who gets the correct value but calls it an equation is confusing "has an equals sign" with "is an equation" — an equation is only true for particular value(s) of the unknown, whereas this relationship is used to calculate rather than to be solved. A candidate who forgets to multiply C by 1.8 and just adds 32 to 20 gets 52. A candidate who multiplies correctly but forgets to add 32 gets 36.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.