The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
CalculatorGCSE Higher
GCSE Higher sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- 1.Work out ⁴√81
- 2.Write down the gradient of the line with equation y = −x + 3.y = −x + 3
- 3.A car travels at a constant speed. It travels 150 miles in 3 hours. At the same speed, work out how far it travels in 5 hours.
- 4.Point B is at (3, 5). It is reflected in the line y = 2. Work out the coordinates of the image of point B.
- 5.A two-way table records 150 customers at a café. 90 of the customers bought a hot drink and the rest did not. 54 of the hot-drink customers also bought a cake. 21 of the customers who did not buy a hot drink bought a cake. Work out the percentage of all 150 customers who bought a cake.
- 6.A scatter graph shows the number of days, x, that each of 16 tomato plants was watered and its height, y cm. The line of best fit has equation y = 1.5x + 4. Write down what the 1.5 in this equation tells you about the plants.y = 1.5x + 4
- 7.A cyclist travels 40 km, correct to the nearest 10 km, in a time of 3 hours, correct to the nearest hour. Work out the maximum possible average speed, in km/h.
- 8.A runner's journey is shown on a distance-time graph: she runs 8 km in the first hour, rests for 30 minutes with no distance gained, then runs a further 4 km in the next 30 minutes. Work out her average speed for the whole journey, in kilometres per hour.
- 9.A factory machine produces bottles at a constant rate. In 45 minutes it produces 810 bottles. The factory needs 2,160 bottles for an order. Working at the same rate, work out how many minutes it will take to produce the order.
- 10.A cable supporting a flagpole is anchored to the ground 5 m from the base of the pole. The cable makes an angle of 60° with the ground. Using the exact value of tan 60°, work out the exact height of the flagpole.
- 11.Two fair six-sided dice are rolled and the two scores are added together. Given that at least one of the dice shows a 5, work out the probability that the total is 8.
- 12.Work out (4 × 10⁻³) × (2 × 10⁵). Give your answer in standard form.
- 13.The iterative formula xₙ₊₁ = 12 ÷ (xₙ + 2) is used repeatedly, starting from x₀ = 1. Work out the value that xₙ approaches, correct to 2 decimal places.
- 14.A post 2 metres tall casts a shadow 3 metres long. At the same time a nearby tree casts a shadow 12 metres long. Work out the height of the tree.
- 15.A right-angled triangle has a hypotenuse of 8 cm, and one of its shorter sides is 4 cm. Work out the size of the angle between that 4 cm side and the hypotenuse.
- 16.f(x) = x² − 1 and g(x) = 3x. Work out fg(4).y = x² − 1
- 17.A company's turnover was £128 000 in 2023 and £176 000 in 2024. Work out the multiplier that changes the 2023 turnover into the 2024 turnover.
- 18.A rhombus has all four sides equal in length. Which statement about a rhombus is correct?
- 19.The diagram shows the graph of the cost, in pounds, of a taxi journey plotted against the distance travelled, in miles, for journeys of up to 4 miles. The same fixed charge and the same cost per mile apply to longer journeys. Work out the cost of a 6-mile journey.
- 20.Describe a sequence of two transformations that maps the graph of y = cos x onto the graph of y = cos(x + 90°) − 2.y = cos(x)
Answer key
- (a) 3 — Method: the fourth root of a number is the positive value that gives that number when it is multiplied by itself four times. Working: 2 × 2 × 2 × 2 = 16, which is too small, and 3 × 3 × 3 × 3 = 9 × 9 = 81. Answer: 3. The distractors: 9 comes from taking the square root of 81 instead of its fourth root; 4.5 comes from taking the square root and then halving it, as though a fourth root were half a square root; 20.25 comes from dividing 81 by 4, treating the root's index as a divisor.
- (b) −1 — Method: in the form y = mx + c the gradient m is the number multiplying x, and an x term written with no number in front of it has a coefficient of 1. Working: y = −x + 3 is the same equation as y = (−1)x + 3, so comparing it with y = mx + c gives m = −1 and c = 3. Answer: −1. The distractors: 1 comes from taking the coefficient as 1 and leaving the minus sign out of the answer; 3 comes from reading the constant as the gradient, confusing m with c; −3 comes from moving the minus sign across to the constant term and then reading the gradient off that term instead of the x term.
- (c) 250 miles — Find the distance travelled in 1 hour: 150 ÷ 3 = 50 miles. Multiply by 5 hours: 50 × 5 = 250 miles. Giving 300 miles doubles the original distance (150 × 2 = 300) using a scale factor of 2 instead of the correct 5 ÷ 3. Giving 200 miles adds only one extra hour's distance, 50, instead of the two extra hours actually needed (150 + 50 = 200, rather than 150 + 100). Giving 90 miles divides by the scale factor instead of multiplying (150 × 3 ÷ 5 = 90).
- (b) (3, −1) — Method: find the distance from the point to the mirror line, then place the image the same distance on the other side of the line. Working: B is 5 − 2 = 3 units above the line y = 2, so its image is 3 units below the line, at y = 2 − 3 = −1, giving (3, −1); the x-coordinate does not change, since the mirror line is horizontal. Options: (3, −5) comes from reflecting in the x-axis (y = 0) instead of the line y = 2; (−3, 5) comes from reflecting in the y-axis instead of a horizontal line; (3, −4) comes from doubling the distance from the line instead of reflecting it, giving 2 − 2×3 = −4. Answer: (3, −1).
- (b) 50% — The total number of customers who bought a cake is 54 + 21 = 75, combining both hot-drink and non-hot-drink customers. As a percentage of all 150 customers, this is (75 ÷ 150) × 100 = 50%. Choosing 36% comes from only counting the hot-drink customers who bought a cake, (54 ÷ 150) × 100 = 36%, and forgetting the 21 non-hot-drink customers who also bought a cake. Choosing 14% comes from only counting the non-hot-drink customers who bought a cake, (21 ÷ 150) × 100 = 14%, and forgetting the 54 hot-drink customers who also bought a cake. Choosing 60% comes from dividing by the hot-drink total of 90 instead of the grand total of 150, (54 ÷ 90) × 100 = 60%.
- (b) On average a plant grew 1.5 cm taller for each extra day — Method: in the equation of a line, the number multiplying x is the gradient, and a gradient states the change in y produced by an increase of 1 in x, read in the units of the two axes. Working: here x is measured in days and y in centimetres, so the gradient 1.5 carries the units centimetres per day. Testing it on the line, 5 days gives 1.5 × 5 + 4 = 11.5 cm and 6 days gives 1.5 × 6 + 4 = 13 cm, a rise of 1.5 cm for the one extra day. Answer: on average a plant grew 1.5 cm taller for each extra day of watering. The distractors: 1.5 cm as the height before any watering is the value of y when x is 0, which is the other number in the equation, 4 cm, so this swaps the gradient and the intercept; 1.5 cm as the gap between the tallest and the shortest plant reads the gradient as a range, when a range is a difference between two of the 16 plants and a gradient is a rate; 1.5 days for each extra centimetre inverts the rate, dividing days by centimetres instead of centimetres by days, and the line gives 1 cm of growth in two thirds of a day.
- (c) 18 — The error intervals are 35 ≤ distance < 45 and 2.5 ≤ time < 3.5. Average speed is distance ÷ time, and to make a quotient as large as possible you divide the largest possible numerator by the SMALLEST possible denominator: 45 ÷ 2.5 = 18 km/h. Using the upper bound of time as well as the upper bound of distance, 45 ÷ 3.5, gives roughly 12.9 km/h — dividing by a bigger number produces a smaller result, so this actually finds a value smaller than the true maximum. Using the lower bound of distance with the lower bound of time, 35 ÷ 2.5 = 14, mixes up which bound belongs to a maximum calculation. Using the lower bound of distance with the upper bound of time, 35 ÷ 3.5 = 10, is in fact the correct method for the MINIMUM speed, not the maximum.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (b) 120 minutes — Method: find the rate in bottles per minute, then divide the order size by the rate. Working: rate = 810 ÷ 45 = 18 bottles per minute. Time = 2,160 ÷ 18 = 120 minutes. Wrong options: 1,350 minutes comes from subtracting 810 from 2,160 instead of using the rate; 48 minutes comes from dividing the order size by the original time (2,160 ÷ 45) instead of the rate; 108 minutes comes from rounding the rate to 20 bottles per minute before dividing.
- (c) 5√3 m — The cable, the pole and the ground form a right-angled triangle: the ground distance (5 m) is adjacent to the 60° angle, and the height of the pole is opposite it, so height = 5 × tan 60° = 5 × √3 = 5√3 m. 5√3/2 m comes from using sin 60° = √3/2 instead of tan 60°. 5/√3 m comes from using tan 30° = 1/√3, the reciprocal-angle value, instead of tan 60°. 10√3 m comes from doubling the correct height by mistake.
- (b) 2/11 — Method: restrict the 36 equally likely outcomes to those where at least one die shows a 5, then find what fraction of THOSE give a total of 8. Working: outcomes with at least one 5: (5, 1), (5, 2), (5, 3), (5, 4), (5, 5), (5, 6), (1, 5), (2, 5), (3, 5), (4, 5), (6, 5) — 11 outcomes. Among these, the total is 8 for (5, 3) and (3, 5) — 2 outcomes. P(total 8 | at least one 5) = 2/11. Answer: 2/11. Watch out: 5/36 is P(total 8) over the full 36 outcomes — it ignores that you already know one die shows a 5. Treating the condition as 'the first die shows a 5' instead of 'at least one die shows a 5' restricts you to only 6 outcomes and misses the (3, 5) case, giving 1/6. And counting only (5, 3) but not its reverse (3, 5) inside the correct 11-outcome list gives 1/11 instead of 2/11.
- (a) 8 × 10² — Method: to multiply numbers written in standard form, multiply the coefficients and add the indices. Working: 4 × 2 = 8 for the coefficients, and −3 + 5 = 2 for the indices; 8 already lies between 1 and 10, so no adjustment is needed. Answer: 8 × 10². The distractors: 6 × 10² comes from adding the coefficients, 4 + 2, instead of multiplying them; 8 × 10⁸ comes from ignoring the minus sign and adding 3 + 5; 8 × 10⁻¹⁵ comes from multiplying the indices, −3 × 5, instead of adding them.
- (c) 2.61 — The limit L satisfies L = 12 ÷ (L + 2), so L(L + 2) = 12, giving L² + 2L − 12 = 0 and L = (−2 + √52) ÷ 2 = 2.6056, which is 2.61 to 2 decimal places (the early iterates 4, 2, 3, 2.4, 2.73, ... oscillate around this value before settling). Choosing 3.00 reads off x₃, one of the early oscillating values, before the sequence has settled close to the limit. Choosing 4.00 reads off x₁, the very first iterate, not the value the sequence approaches. Choosing 6.00 comes from writing the limit equation as L = 12 ÷ 2, leaving L itself out of the denominator.
- (c) 8 m — Method: in the same sunlight every object has its height and its shadow in the same ratio, so write 2:3 = h:12, find the multiplier that takes 3 to 12 and apply it to the height. Working: 12 ÷ 3 = 4, so the tree's shadow is 4 times the post's shadow; the height must be scaled by the same 4, giving 4 × 2 = 8 m. Answer: 8 m. The distractors: 18 m comes from setting up the proportion upside down, 12 ÷ 2 × 3, which scales by shadow over height instead of height over shadow; 24 m comes from multiplying the 12 m shadow by the post's height of 2 m and never dividing by the post's shadow of 3 m; 4 m is the scale factor 12 ÷ 3, given as a length instead of being used to scale the 2 m post.
- (d) 60° — Method: the 4 cm side is next to the angle wanted and the 8 cm side is the hypotenuse, so the ratio built from them is cos θ = adjacent ÷ hypotenuse, and the angle comes from the inverse cosine. Working: cos θ = 4 ÷ 8 = 0.5, so θ = cos⁻¹(0.5). Answer: 60°. The distractors: 30° comes from using sin⁻¹(0.5), which treats the 4 cm side as the side opposite the angle when it is the side next to it; 45° comes from assuming the two acute angles of the triangle must be equal; 90° comes from writing down the right angle the question already gives instead of the angle it asks for.
- (b) 143 — fg(4) means f(g(4)): work out g(4) first, then substitute the result into f. g(4) = 3 × 4 = 12, then f(12) = 12² − 1 = 144 − 1 = 143. Working out gf(4) instead swaps the order: f(4) = 4² − 1 = 15, then g(15) = 3 × 15 = 45 — that is the wrong composition. Treating f(x) as x − 1 (forgetting to square the input) gives f(12) = 12 − 1 = 11. Applying g twice instead of applying g then f gives g(g(4)) = g(12) = 3 × 12 = 36, which mixes up which function should be applied second.
- (a) 1.375 — The multiplier is the new value divided by the original value: 176 000 ÷ 128 000 = 1.375. Choosing 0.375 comes from working out the increase as a fraction of the original (48 000 ÷ 128 000 = 0.375) and stopping there, without adding on the 1 whole that represents the original turnover. Choosing 0.727 comes from dividing the 2023 turnover by the 2024 turnover, the wrong way round (128 000 ÷ 176 000, rounded to 3 decimal places). Choosing 137.5 comes from writing the multiplier as a percentage — the 2024 turnover is 137.5% of the 2023 turnover — instead of converting it to the decimal multiplier 1.375.
- (b) Its diagonals cross at right angles — In a rhombus, the diagonals always bisect each other at right angles, because a rhombus is a parallelogram with all four sides equal. Its diagonals are not always equal in length — that is a property of a rectangle, and only holds for a rhombus in the special case where it is also a square. It does not always have four right angles — again, that is only true when the rhombus is also a square. Its order of rotational symmetry is generally 2, not 4; order 4 only happens when the rhombus is a square.
- (b) £14 — Method: read the fixed charge (the cost at 0 miles) and the rate (the cost per extra mile) from the graph, then use them to work out the cost for a distance beyond the part that is plotted. Working: the graph shows a fixed charge of £2 at 0 miles, and the cost rises by £2 for every extra mile, so for 6 miles the cost is £2 + (£2 × 6) = £2 + £12 = £14. Answer: £14. Distractor refutation: £12 comes from multiplying the rate by the distance and leaving out the £2 fixed charge. £8 comes from misreading the rate as £1 per mile instead of £2 per mile. £24 comes from adding the fixed charge to the rate first and then multiplying the total by the distance, instead of multiplying the rate by the distance and then adding the fixed charge.
- (b) Translate −90° in x, then translate −2 in y. — cos(x + 90°) translates the graph 90° in the NEGATIVE x-direction, since a positive shift inside the bracket moves a graph left, not right, and subtracting 2 afterwards translates it 2 units in the negative y-direction (down). So the sequence is: translate −90° in x, then translate −2 in y. Using +90° in x reverses the direction of the horizontal shift — the sign inside the bracket moves the graph the opposite way to what it looks like. Using +2 in y reverses the direction of the vertical shift; subtracting 2 outside the function moves the graph down, not up. Describing the −2 as a reflection in the x-axis is wrong because a reflection turns positive y-values negative and vice versa, whereas here every y-value is simply reduced by the fixed amount 2, which is what a translation does, not a reflection.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.