Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
CalculatorGCSE Higher
GCSE Higher sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- 1.Tickets for a fairground ride are sold in packs of 6. Tokens for the dodgems are sold in packs of 10. Yusuf wants to buy the smallest number of packs of each so that he ends up with the same number of ride tickets as dodgem tokens. Work out how many ride tickets that is.
- 2.A company's profit is £500 in its first year. Each year after that, the profit is £300 more than the year before. Work out the profit in the company's 6th year.
- 3.A tank is filled at a rate of 3 litres every 2 minutes. Given that 1 litre = 1000 cm³, work out the flow rate in cm³ per minute.
- 4.In triangle ABC, AB = 6 cm, angle ABC = 40° and AC = 9 cm. Using the sine rule, sin(ACB) = AB × sin(ABC) ÷ AC, which gives two possible values for angle ACB: 25.4° or 154.6° (each to 1 decimal place). By considering the angle sum of the triangle, decide which of these two values angle ACB can actually take, and hence work out angle BAC. Give your answer to 1 decimal place.
- 5.Two fair five-sided dice, numbered 1 to 5, are rolled. Work out the probability that the two scores differ by at least 2.
- 6.A council wants to find out what all residents of a town think about a new cycle lane. It posts a survey only on its website and asks people to fill it in online. Give a reason why this sample is likely to be biased.
- 7.A circle has a circumference of 8π cm. Work out the exact area of the circle in terms of π.
- 8.A car's speed increases steadily while it accelerates. Its speed v m/s after t seconds is given by v = u + at, where u is the starting speed in m/s and a is the acceleration in m/s². A car starts at u = 4 m/s and accelerates at a = 2 m/s² until it reaches v = 20 m/s. Work out t, the time taken in seconds.
- 9.A candidate wants to estimate the instantaneous rate of change of a reservoir's water level, in metres, at t = 5 days after heavy rain began. The reservoir's water level is plotted against time, in days, since the rain began. The candidate uses the chord joining the points at t = 0 days and t = 20 days to estimate the rate of change at t = 5 days. Give a reason why this is likely to be a poor estimate.
- 10.A patio plan states: 'Side AB of the patio is parallel to side DC, and AB is longer than DC. Sides BC and AD are not parallel to each other and are not equal in length.' The four sides measure AB = 5.1 m, BC = 3.2 m, DC = 2.8 m and AD = 4.5 m. The tiler needs to order edging strip only for the sides that are not parallel to any other side. What total length of edging strip, in metres, should the tiler order?
- 11.A quality inspector tests 145 light bulbs and finds that 33 are faulty. Work out the relative frequency of a bulb being faulty, as a percentage correct to 1 decimal place.
- 12.Simplify (y³)⁴, giving your answer as a single power of y.
- 13.The simple interest, £I, earned on a savings account is given by the formula I = PRT/100, where P is the amount invested in pounds, R is the interest rate per year and T is the time in years. Rearrange the formula to make P the subject.
- 14.Order these three values from smallest to largest: 3/8, 0.43, 41%.
- 15.A quadrilateral has both pairs of opposite sides parallel and equal in length, but none of its angles are right angles. Which statement about this quadrilateral is correct?
- 16.An arithmetic sequence has first term 40 and common difference −6. Work out the 9th term of the sequence.
- 17.y is directly proportional to x. When x = 8, y = 20. Work out the value of y when x = 12.
- 18.A ladder of length 7 m leans against a vertical wall. The foot of the ladder is 3 m from the base of the wall. Work out how high up the wall the ladder reaches. Give your answer correct to 1 decimal place.
- 19.A straight line has equation y = 4x + 3. A second line is parallel to the first line and passes through the point (0, −5). Work out the equation of the second line.y = 4x + 3
- 20.The nth term of a sequence is n² + 4n. Work out the term number, n, for which the term equals 45.
Answer key
- (b) 30 — Method: the smallest matching total is the lowest common multiple of the two pack sizes. Working: multiples of 6 are 6, 12, 18, 24, 30 …; multiples of 10 are 10, 20, 30 …. The lowest common multiple is 30. 60 comes from working out 6 × 10 = 60, the product of the pack sizes rather than their lowest common multiple. 16 comes from working out 6 + 10 = 16, which is not a common multiple at all. 2 is the highest common factor of 6 and 10, not a total of tickets. Answer: 30.
- (d) £2000 — This is an arithmetic sequence with first term £500 and common difference £300. The 6th term is 500 + 5 × 300 = 2000. A candidate who uses 6 lots of the increase instead of 5 gets 500 + 6 × 300 = 2300. A candidate who forgets to add the first year's profit at all gets 5 × 300 = 1500. A candidate who miscounts the number of increases as 4 instead of 5 gets 500 + 4 × 300 = 1700.
- (b) 1500 — The rate is 3 ÷ 2 = 1.5 litres per minute. Converting to cm³: 1.5 × 1000 = 1500 cm³ per minute. Getting 3000 comes from converting 3 litres to cm³ first (3000 cm³) and forgetting to divide by the 2 minutes. Getting 750 comes from dividing by the 2 minutes a second time after converting (1500 ÷ 2). Getting 2000 comes from converting the 2 minutes as if it were litres (2 × 1000) instead of using the correct rate of 1.5 litres per minute.
- (a) 114.6° — Using the sine rule, sin(ACB) = AB × sin(ABC) ÷ AC = 6 × sin(40°) ÷ 9. Since sin(40°) ≈ 0.64279, this gives sin(ACB) ≈ 3.8567 ÷ 9 ≈ 0.42852, so angle ACB ≈ 25.4° or its supplement, 154.6°. Testing the obtuse candidate: 40° + 154.6° = 194.6°, which already exceeds 180°, so angle BAC would have to be negative — impossible, so 154.6° is rejected. With angle ACB ≈ 25.4°, angle BAC = 180° − 40° − 25.4° = 114.6°. 25.4° is angle ACB, not angle BAC that the question asks for. 14.6° comes from using the invalid 154.6° candidate anyway and then wrongly turning the resulting negative angle sum (−14.6°) positive instead of rejecting it. 65.4° comes from inverting the sine rule ratio — dividing AC × sin(ABC) by AB instead of AB × sin(ABC) by AC — which gives a different, incorrect candidate for angle ACB entirely.
- (b) 12/25 — List every outcome as an ordered pair (first dice, second dice) out of the 25 equally likely outcomes. The pairs with a difference of exactly 2 are (1, 3), (3, 1), (2, 4), (4, 2), (3, 5) and (5, 3), the pairs with a difference of 3 are (1, 4), (4, 1), (2, 5) and (5, 2), and the pairs with a difference of 4 are (1, 5) and (5, 1), giving 6 + 4 + 2 = 12 outcomes with a difference of at least 2, so the probability is 12/25. Choosing 13/25 comes from finding the probability that the two scores differ by LESS than 2 instead, using the remaining 13 outcomes, the opposite of what was asked. Choosing 10/25 comes from forgetting the two outcomes where the difference is 4, (1, 5) and (5, 1), and adding only the difference-2 and difference-3 outcomes, 6 + 4 = 10 out of 25. Choosing 6/25 comes from counting only the pairs with a difference of exactly 2, forgetting that differences of 3 and 4 also count as at least 2.
- (d) Only internet users reach the website; others are excluded. — Method: a sample is biased when it systematically leaves out part of the population, or systematically over-represents another part. Working: anyone without internet access, or who does not visit the council's website, has NO chance of being included — the sample is drawn only from internet-using residents, which is not the whole town. Saying too many people might respond because the survey is free confuses bias with sample size — bias is about who CAN be reached, not how many respond. Saying people might lie describes a different problem, response honesty, not who was sampled in the first place. Saying online surveys cannot be anonymous is not a reason connected to bias at all. A sample is biased when part of the population has no chance of being included, whatever the reason for that.
- (b) 16π — Use the circumference formula C = 2πr to find the radius: 8π = 2πr, so r = 8π ÷ 2π = 4 cm. Then use the area formula A = πr²: A = π × 4² = 16π cm². Using C = πr instead of C = 2πr gives r = 8, and squaring that gives 64π. Finding r = 4 correctly but then substituting it back into the circumference formula instead of the area formula gives 2π × 4 = 8π. Finding r = 4 correctly but forgetting to square it in the area formula, using A = πr instead of A = πr², gives 4π.
- (b) 8 s — Rearranging v = u + at for t: subtract u from both sides to get v − u = at, then divide by a: t = (v − u)/a. Substituting u = 4, a = 2, v = 20: t = (20 − 4)/2 = 16/2 = 8 s. Answering 12 s comes from adding u instead of subtracting it: (20 + 4)/2 = 12. Answering 32 s comes from multiplying (v − u) by a instead of dividing by it: 16 × 2 = 32. Answering 6 s divides v by a first and then subtracts u, in the wrong order: 20/2 − 4 = 10 − 4 = 6. The time taken is 8 s.
- (a) It's an average over 20 days, which may miss the day-5 rate. — Method: a chord's gradient is the AVERAGE rate of change across the whole interval it spans; it only closely approximates the INSTANTANEOUS rate of change at a point inside that interval when the rate of change is roughly constant across the interval, which usually means the interval needs to be short. Working: here the chord spans 20 days while the point of interest, t = 5, is only a quarter of the way along it, so if the reservoir's level rose or fell at different rates over that time, the chord's gradient will not be close to the true gradient of the curve at t = 5 — this is the correct reason. Claiming the chord's gradient needs the water level at every day in between is wrong: a chord's gradient needs only the two endpoint values, at t = 0 and t = 20. Claiming a chord can only estimate the rate at its own endpoints is wrong: a chord between two points can be used to estimate the instantaneous rate of change at any point inside the interval, including one that is not an endpoint — that is exactly the technique being used here, and it is the SIZE of the interval that makes the estimate poor, not the fact that t = 5 is an interior point. Claiming the units do not match is wrong: the chord's gradient and the instantaneous rate of change are both measured in metres per day, so the units are the same. A chord is only a good estimate of an instantaneous rate when the interval it spans is short enough that the rate does not change much within it — always check how long the interval is compared with how far it is to the point you actually want.
- (a) 7.7 m — AB is parallel to DC, so those two sides are each parallel to another side. BC and AD are stated to be not parallel to each other, so neither one is parallel to any other side — these are the two sides that need edging. Adding these: 3.2 + 4.5 = 7.7 m, so 7.7 m is correct. 7.6 m comes from an arithmetic slip when adding 3.2 and 4.5. 15.4 m comes from doubling the correct total, mistakenly assuming edging strip is needed along both faces of each side. 4.5 m comes from using only the longer of the two non-parallel sides and forgetting to add the shorter one.
- (b) 22.8% — Relative frequency as a percentage is the faulty count divided by the total, then multiplied by 100: 33 ÷ 145 × 100 = 22.76, which rounds to 22.8%. Giving 33.0% as the answer uses the frequency, 33, directly as a percentage without dividing by the total 145 at all. Rounding 22.76 down to 22.7% instead of up applies the wrong rounding direction at the first decimal place. Finding the relative frequency of the bulbs that were NOT faulty first: 145 − 33 = 112, and 112 ÷ 145 × 100 = 77.24, answers the opposite question and rounds to 77.2%.
- (a) y¹² — Method: when a power is raised to another power, multiply the two indices. Working: (y³)⁴ means y³ × y³ × y³ × y³, which is four lots of three y's multiplied together, so the index is 3 × 4 = 12 and (y³)⁴ = y¹². y⁷ comes from adding the indices, 3 + 4 = 7, which is the rule for multiplying two separate powers, not for raising a power to a power. y⁸¹ comes from working out 3⁴ = 81 and using that as the index, raising the inner index to the outer power instead of multiplying the two indices. 12y comes from multiplying the indices to make 12 but then treating y as a coefficient instead of a power. Answer: y¹².
- (a) P = 100I / (RT) — Method: undo the operations done to P in reverse order — multiply by 100, then divide by R and by T. Working: I = PRT/100, so 100I = PRT, so P = 100I / (RT). Answer: P = 100I / (RT). P = IRT/100 comes from leaving R and T in the numerator instead of moving them to the denominator. P = 100RT/I comes from swapping P and I when rearranging. P = 100I/R comes from dividing by R only and forgetting to also divide by T.
- (a) 3/8, 41%, 0.43 — Method: convert every value to a decimal so they can be compared on the same scale, then order them. Working: 3/8 = 0.375, 41% = 0.41, and 0.43 stays as 0.43, so from smallest to largest the decimals are 0.375, 0.41, 0.43, giving the order 3/8, 41%, 0.43. Answer: 3/8, 41%, 0.43. The order 3/8, 0.43, 41% comes from comparing 0.43 and 41% as raw digits (43 versus 41) without converting 41% into the decimal 0.41 first, wrongly placing 0.43 before 41%. The order 0.43, 41%, 3/8 comes from placing the values in completely reversed order, from largest to smallest instead of smallest to largest. The order 41%, 0.43, 3/8 comes from ordering the values by their TYPE (percentage, then decimal, then fraction) rather than by their actual size.
- (c) It is a parallelogram but not a rectangle — Method: match the given properties to the definition of each named quadrilateral. Working: having both pairs of opposite sides parallel and equal in length is exactly the definition of a parallelogram; since none of the angles are right angles, it cannot also be a rectangle, which needs four right angles. Options: 'must be a rectangle' wrongly assumes every parallelogram has right angles; 'must be a rhombus' wrongly assumes equal opposite sides means all four sides are equal, but only the opposite pairs are stated as equal here; 'trapezium' is wrong because a trapezium has exactly one pair of parallel sides, while this shape has two pairs, so it is a parallelogram and not a trapezium. Answer: it is a parallelogram but not a rectangle.
- (c) −8 — The nth term is the first term plus (n − 1) lots of the common difference: 40 + 8 × (−6) = 40 − 48 = −8. A candidate who uses 9 lots of the common difference instead of 8 gets 40 + 9 × (−6) = −14. A candidate who treats the common difference as +6 instead of −6 gets 40 + 8 × 6 = 88. A candidate who uses only 7 lots of the common difference gets 40 + 7 × (−6) = −2.
- (c) 30 — Method: use y = kx and find k from the given pair of values, then substitute x = 12. Working: k = 20 ÷ 8 = 2.5, so y = 2.5 × 12 = 30. Answer: 30. 24 comes from treating the relationship as additive, adding the increase in x (12 − 8 = 4) straight onto y (20 + 4 = 24), instead of multiplying by k. 14.5 comes from finding k correctly (2.5) but then adding it to x instead of multiplying (12 + 2.5 = 14.5). 4.8 comes from finding k upside down, 8 ÷ 20 = 0.4, and multiplying by x: 12 × 0.4 = 4.8.
- (c) 6.3 m — By Pythagoras' theorem, the height = √(7² − 3²) = √(49 − 9) = √40 = 6.32...≈ 6.3 m. "6.4 m" rounds 6.32...m up to 6.4 instead of correctly rounding it down to 6.3. "4.0 m" comes from subtracting the two given lengths directly, 7 − 3 = 4, instead of subtracting their squares. "10.0 m" comes from adding the two given lengths, 7 + 3 = 10, instead of using Pythagoras' theorem at all.
- (c) y = 4x − 5 — Parallel lines have the same gradient, so the new line has gradient 4; since it passes through (0, −5), its y-intercept is −5, giving y = 4x − 5. A candidate who drops the negative sign on the y-intercept would write y = 4x + 5. A candidate who changes the sign of the gradient, instead of keeping it the same for a parallel line, would write y = −4x − 5. A candidate who confuses m and c, using the y-intercept of the first line (3) as the gradient of the second, would write y = 3x − 5.
- (b) 5 — Set n² + 4n = 45, so n² + 4n − 45 = 0. This factorises as (n + 9)(n − 5) = 0, giving n = −9 or n = 5. Since a term number must be positive, n = 5. Taking the magnitude of the rejected negative solution, 9, instead of discarding it, gives 9. Dividing 45 by the coefficient of n and ignoring the n² term entirely, 45 ÷ 4 = 11.25, rounded to the nearest whole number, gives 11. Dropping the linear term 4n and solving n² = 45 instead, the nearest whole number to √45 = 6.708 is 7.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.