Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
CalculatorGCSE Higher
Answer key: GCSE Higher sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- (c) (12 + 3π) cm — The perimeter of a quarter-circle is made up of two straight radii plus a quarter of the circumference. The two radii give 2 × 6 = 12 cm, and a quarter of the circumference is (1/4) × 2 × π × 6 = 3π cm, so the total perimeter is (12 + 3π) cm. Giving only the curved part, 3π cm, forgets the two straight edges entirely. Using the full circumference, 2 × π × 6 = 12π, instead of a quarter of it gives (12 + 12π) cm. Including only one radius instead of two gives (6 + 3π) cm.
- (b) 4 — Method: form the equation 30 + 25h = 130, where h is the number of hours, then solve for h. Working: subtract the call-out fee from the total bill: 25h = 130 − 30 = 100. Divide by the hourly rate: h = 100 ÷ 25 = 4. Answer: 4 hours. 5.2 comes from dividing the whole bill by the hourly rate without subtracting the fixed fee first, 130 ÷ 25. 3.5 comes from swapping the fee and the rate, subtracting the rate from the bill and dividing by the fee, (130 − 25) ÷ 30. 6.4 comes from adding the call-out fee to the bill instead of subtracting it, before dividing by the rate, (130 + 30) ÷ 25.
- (c) They are in direct proportion, because y ÷ x = 2.5 for both pairs. — Testing direct proportion means checking that y ÷ x is the same for every pair: 15 ÷ 6 = 2.5 and 25 ÷ 10 = 2.5, so the quantities are in direct proportion. Saying they are not in proportion because x + y differs uses addition, which is not the correct test for proportion. Saying they are not in proportion because y − x differs also uses the wrong test — subtraction, not division. Saying they are in proportion because x × y is 90 and 250 uses multiplication, which is the test for inverse proportion, and the two products are not even equal to each other, so this option also contradicts itself.
- (c) a + (1/2)c — Method: OABC is a parallelogram, so OB = OA + AB, and since AB is equal and parallel to OC, AB = c; this gives OB = a + c. M is the midpoint of AB, so AM = (1/2)AB = (1/2)c. Working: OM = OA + AM = a + (1/2)c. Answer: OM = a + (1/2)c. Adding the whole of AB instead of half of it gives a + c, which is OB, not OM; halving the whole diagonal OB instead of just AB gives (1/2)a + (1/2)c, the midpoint of OB rather than of AB; and flipping the sign on the c-term gives a − (1/2)c, which points back the wrong way along AB. Halve only the side you are told to halve, and check the sign before you commit to an answer.
- (d) 1/15 — The probability that the first bead is red is 3/10. Since the first bead is not put back, there are now only 2 red beads left out of 9 beads in total, so the probability that the second bead is also red is 2/9. Multiplying these, 3/10 × 2/9 = 6/90 = 1/15. A candidate who answers 9/100 has treated the beads as replaced, using 3/10 twice. A candidate who answers 3/50 has correctly reduced the red count to 2 for the second pick but forgotten that the total also falls to 9, using 2/10 instead. A candidate who answers 5/19 has added the numerators and added the denominators, (3+2)/(10+9), instead of multiplying.
- (d) 3 — Method: the height of a bar is its frequency density, frequency ÷ class width, so work out both heights and divide one by the other. Working: the class 0 ≤ t < 4 is 4 minutes wide and holds 30 visits, so its frequency density is 30 ÷ 4 = 7.5 per minute; the class 4 ≤ t < 20 is 16 minutes wide and holds 40 visits, so its frequency density is 40 ÷ 16 = 2.5 per minute; dividing the heights, 7.5 ÷ 2.5 = 3. Answer: the first bar is 3 times as tall. The distractors: 0.75 comes from comparing the frequencies, 30 ÷ 40, as though the frequencies were the heights, which is the mistake the unequal widths are there to expose; 4 comes from comparing the class widths, 16 ÷ 4, instead of the heights; 5 comes from subtracting the two frequency densities, 7.5 − 2.5, which answers how much taller rather than how many times taller.
- (a) 25 — Method: squaring a square root removes the root, so a square root raised to the power 4 can be squared in two stages. Working: (√5)⁴ = ((√5)²)² = 5² = 5 × 5 = 25. Answer: 25. The distractors: 5 comes from squaring once and stopping, treating the fourth power as a square; 625 comes from raising 5 to the power 4 and ignoring the root sign altogether; 20 comes from multiplying 5 by the index 4 instead of raising 5 to that power.
- (c) 2.61 — The limit L satisfies L = 12 ÷ (L + 2), so L(L + 2) = 12, giving L² + 2L − 12 = 0 and L = (−2 + √52) ÷ 2 = 2.6056, which is 2.61 to 2 decimal places (the early iterates 4, 2, 3, 2.4, 2.73, ... oscillate around this value before settling). Choosing 3.00 reads off x₃, one of the early oscillating values, before the sequence has settled close to the limit. Choosing 4.00 reads off x₁, the very first iterate, not the value the sequence approaches. Choosing 6.00 comes from writing the limit equation as L = 12 ÷ 2, leaving L itself out of the denominator.
- (b) −1% — Method: write each change as a multiplier and multiply them. A 10% fall is × 0.9 and a 10% rise is × 1.1. Working: 0.9 × 1.1 = 0.99, so the final price is 99% of the original, which is 1% less. Answer: an overall change of −1%. The distractors: 0% comes from assuming a 10% fall and a 10% rise cancel — they do not, because the rise is 10% of a smaller amount; +1% has the size right but the sign wrong, from reading the multiplier 0.99 as 1% above 1 instead of 1% below it; −2% comes from finding the 1% fall and then counting it once for each of the two changes.
- (c) AB means the segment or its length, shown by context — Method: recall the standard convention for a two-letter label such as AB. Working: AB names the segment AND its length; the sentence around it shows which is meant — 'draw AB' means the segment, 'AB = 5 cm' means the length. Options: 'a different symbol is needed' and 'must be written as |AB|' both describe stricter rules than the convention GCSE actually uses; 'AB can only mean the segment' ignores that the same label is also used for the length. Answer: AB means the segment or its length, shown by context.
- (c) 0.2 — Let P(green) = x, so P(blue) = 2x. Red, blue, green and yellow are exhaustive: 0.05 + 0.35 + x + 2x = 1, so 0.4 + 3x = 1, giving 3x = 0.6 and x = 0.2. So P(green) = 0.2. Splitting the remaining 0.6 evenly between blue and green, ignoring the 2:1 ratio, gives 0.3. Working out x correctly but then reporting 2x, the probability of blue, gives 0.4. Stopping after finding that blue and green together account for 0.6, without dividing by the three equal shares of x, gives 0.6.
- (a) 7 — Dividing by 0.1 is the same as multiplying by 10, so 0.7 ÷ 0.1 = 7. Meera's answer of 0.07 comes from dividing 0.7 by 10 instead of by 0.1, the wrong way round. A candidate who confuses 0.1 with 0.01 multiplies by 100 instead of 10 and gets 70. A candidate who thinks dividing by a number less than 1 does not change the value gets 0.7.
- (c) x = 2 or x = 3 — Method: factorise into two brackets whose numbers multiply to the constant term and add to the coefficient of x, then set each bracket equal to zero. Working: two numbers that multiply to 6 and add to −5 are −2 and −3, so x² − 5x + 6 = (x − 2)(x − 3) = 0; then x − 2 = 0 gives x = 2 and x − 3 = 0 gives x = 3. Answer: x = 2 or x = 3. The distractors: x = −2 or x = −3 comes from reading the numbers inside the brackets as the solutions instead of changing their signs; x = 1 or x = 6 comes from taking the first factor pair of 6 without checking that the pair adds to −5; x = 5 or x = 6 comes from reading the solutions straight off the 5 and the 6 in the equation.
- (c) 2 : 5 — The point (4, 10) gives x = 4, y = 10, so x : y = 4 : 10. Dividing both parts by their highest common factor, 2, gives 2 : 5 in simplest form. Inverting the whole ratio gives 5 : 2, which is y : x instead of x : y. Dividing only the x-part by 2 and leaving the y-part as 10 gives 2 : 10, but scaling one part on its own changes the ratio: 2 : 10 is the same as 1 : 5, not 4 : 10. Dividing only the y-part by 2 and leaving the x-part as 4 gives 4 : 5, the same one-sided mistake made on the other part of the ratio.
- (c) (−3, 1) — Method: for an enlargement about a centre, first find the vector from the centre to the point, multiply it by the scale factor, INCLUDING its sign, then add the result back onto the centre. Working: the vector from the centre (1, 1) to A(3, 1) is (3 − 1, 1 − 1) = (2, 0). Multiplying by the scale factor −2 gives −2 × 2 = −4 and −2 × 0 = 0, so the scaled vector is (−4, 0). Adding this to the centre gives 1 + (−4) = −3 and 1 + 0 = 1, so the image is (−3, 1). Answer: (−3, 1). A NEGATIVE scale factor keeps its sign all the way through the calculation: do not treat −2 as +2, and do not treat it as a fraction like 1/2, which is the rule for a scale factor between 0 and 1, not a negative one. Always measure the vector from the CENTRE of enlargement, never from the origin, unless the two happen to coincide.
- (b) 3n + 1 — Method: find how many more tiles each pattern uses, then find the constant by adjusting pattern 1's total. Working: each pattern uses 3 more tiles than the last, so the coefficient of n is 3. The constant is pattern 1's total minus the common difference: 4 − 3 = 1. Answer: the nth term is 3n + 1. 3n + 4 comes from using pattern 1's total, 4, as the constant without subtracting the common difference. 3n − 2 comes from a slip in working out the constant, subtracting the common difference twice (4 − 3 − 3 = −2) instead of once. n + 3 comes from swapping the common difference and the constant.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (c) 13 — Area of the trapezium = 1/2 × (8 + 12) × 5 = 1/2 × 100 = 50 m². Number of bags = 50 ÷ 4 = 12.5, which rounds up to 13 bags since seed is sold only in whole bags. A student who mistakenly uses 2 m² of coverage per bag instead of 4 m² finds 50 ÷ 2 = 25 bags.
- (d) line 2 — Line 1 correctly represents three consecutive integers using n. Line 2 adds them: n + (n + 1) + (n + 2). Collecting terms: the n-terms give 3n, and the constants give 1 + 2 = 3, so the correct sum is 3n + 3, not 3n + 2 as Line 2 states — this is the first error, an arithmetic slip in collecting the constant terms. Lines 3 and 4 both follow correctly from Line 2's incorrect result, but that result itself is wrong: the true sum, 3n + 3 = 3(n + 1), is a multiple of 3 for every whole number n. Check the working of each line against what came before it, in order, rather than judging whether the final conclusion feels right — an error that flips the conclusion can sit several lines before the line that states it.
- (a) x + 14 — Expand each bracket separately: 3(x + 4) = 3x + 12, and −2(x − 1) = −2x + 2 (multiply −2 by both x and −1). Combine: 3x + 12 − 2x + 2 = x + 14. Writing x + 10 comes from taking −2(x − 1) as −2x − 2, not flipping the sign of the −1 inside the bracket. Writing 5x + 10 comes from treating the second bracket as +2(x − 1) instead of subtracting it, so the x-terms are added rather than subtracted. Writing x + 13 comes from only multiplying the 2 by the x, and carrying the −1 across unmultiplied.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.