Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
CalculatorGCSE Higher
Answer key: GCSE Higher sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- (a) 7/8, 17/20, 0.8, 78% — Method: convert every value to a decimal, then order the decimals from largest to smallest. Working: 7/8 = 0.875, 17/20 = 0.85, 0.8 = 0.8, 78% = 0.78. Ordering from largest to smallest gives 7/8, 17/20, 0.8, 78%. Answer: 7/8, 17/20, 0.8, 78%. '78%, 0.8, 17/20, 7/8' comes from ordering the converted decimals from smallest to largest instead of largest to smallest. '17/20, 7/8, 0.8, 78%' comes from converting 17/20 incorrectly as larger than 7/8, for example treating 17/20 as 0.87 instead of 0.85, swapping the top two. '7/8, 0.8, 17/20, 78%' comes from converting 17/20 incorrectly as equal to 0.8, swapping the middle two.
- (b) 5 — Set n² + 4n = 45, so n² + 4n − 45 = 0. This factorises as (n + 9)(n − 5) = 0, giving n = −9 or n = 5. Since a term number must be positive, n = 5. Taking the magnitude of the rejected negative solution, 9, instead of discarding it, gives 9. Dividing 45 by the coefficient of n and ignoring the n² term entirely, 45 ÷ 4 = 11.25, rounded to the nearest whole number, gives 11. Dropping the linear term 4n and solving n² = 45 instead, the nearest whole number to √45 = 6.708 is 7.
- (a) 20% — Method: percentage increase = increase ÷ original amount × 100. Working: the increase is 84 − 70 = 14 marks, and 14 ÷ 70 = 0.2, so 0.2 × 100 = 20. Answer: an increase of 20%. The distractors: 14% comes from quoting the 14 mark increase as though marks and per cent were the same thing; 17% comes from dividing the 14 by the new mean 84 instead of by the original 70, which gives 17% to the nearest per cent; 120% is the new mean written as a percentage of the old one, which is the whole of the new mean rather than the increase.
- (c) 68° — Since PA and PB are both tangents from the external point P, PA = PB, so triangle PAB is isosceles with equal base angles at A and B. The angles of triangle PAB sum to 180°, so angle PAB + angle PBA = 180° − 44° = 136°, and since the two base angles are equal, angle PAB = 136° ÷ 2 = 68°. Angle PAB is the angle between the tangent at A and the chord AB, so by the alternate segment theorem it equals the angle in the alternate segment, angle ACB = 68°. Using angle APB directly as angle ACB, without using the isosceles triangle to find angle PAB first, gives 44°. Halving angle APB directly, rather than subtracting it from 180° before halving, gives 22°. Finding 180° − 44° = 136° correctly but forgetting to divide by 2 for one base angle leaves 136°.
- (b) 24/125 — On the fiction branch, 160 − 112 = 48 books were returned late. None of the non-fiction books were late, so the total number of late books is 48, out of 250 books altogether: 48/250 = 24/125. Writing 3/10 is wrong because it divides the 48 late fiction books by the fiction total (160) instead of the whole library total (250). Writing 56/125 is wrong because 112/250 simplifies to 56/125, and 112 is the number of fiction books returned ON TIME, not late. Writing 9/25 is wrong because 90/250 simplifies to 9/25, and 90 is simply the number of non-fiction books, which has nothing to do with late returns. The probability is 24/125.
- (d) 300 pupils — Method: an estimate for a whole population is made by finding the proportion in the sample and applying that same proportion to the population. Working: in the sample 30 of the 50 pupils prefer sport, a proportion of 30 ÷ 50 = 0.6, and applying that proportion to the school gives 0.6 × 500 = 300 pupils. Answer: 300 pupils, and it is only an estimate, because a different random sample of 50 would give a slightly different figure. The distractors: 200 pupils comes from scaling up the 20 pupils in the sample who did not prefer sport, 20 × 10, which answers the opposite question; 150 pupils comes from reading 30 out of 50 as 30% and taking 30% of 500; 60 pupils comes from working out the proportion correctly as 60% and then writing the 60 down as a number of pupils instead of applying it to the 500.
- (b) 8π cm² — A diameter of 8 cm gives a radius of 4 cm. The area of a full circle would be π × r² = π × 4² = 16π cm², and a semicircle is exactly half of this, giving 16π ÷ 2 = 8π cm². Forgetting to halve the area for the semicircle gives 16π cm², the area of the whole circle. Halving the diameter twice, using a radius of 2 instead of 4, gives π × 2² = 4π cm². Using the diameter itself as the radius, so π × 8² = 64π, and then halving that for the semicircle gives 32π cm².
- (a) Yes — the gradients multiply to −2 × 1/2 = −1. — Rearrange Q into the form y = mx + c: 2y = x + 6 gives y = (1/2)x + 3, so Q has gradient 1/2. P has gradient −2. Two lines are perpendicular exactly when the product of their gradients is −1: −2 × 1/2 = −1. Since this holds, P and Q are perpendicular. Distractor routes: "the product is −1, but perpendicular needs 1" works out the product correctly but misremembers the condition — the perpendicular test is a product of exactly −1, and parallel lines are spotted by their gradients being equal, not by a product of 1. "Q's gradient is 2, and −2 × 2 = −4" comes from reading the 2 in front of y in 2y = x + 6 as the gradient, instead of dividing the whole equation by 2 first to reach y = (1/2)x + 3, where the gradient is 1/2. "Both equations have a negative x-term" is not a valid test at all — P's equation does have a negative x-term, but Q's, once rearranged, does not, and matching signs say nothing about the actual gradients.
- (a) 3.375 — Method: the volume scale factor between similar shapes is the length scale factor cubed, not the length scale factor itself. Working: the length scale factor is 12 ÷ 8 = 1.5, and 1.5³ = 3.375. Answer: 3.375. Jayden's answer, 1.5, is only the LENGTH scale factor — he never cubed it to get the volume scale factor. 2.25 comes from squaring the length scale factor instead of cubing it, which would give the area scale factor. 4.5 comes from multiplying the length scale factor by 3 (the number of dimensions) instead of cubing it.
- (d) Triangle 2, by 3.6 cm² — Method: find both areas with 1/2ab sin C, then compare them. Working: area of triangle 1 = 1/2 × 10 × 13 × sin 64° = 58.4 cm²; area of triangle 2 = 1/2 × 11 × 12 × sin 70° = 62.0 cm²; triangle 2 is larger, by 62.0 − 58.4 = 3.6 cm². Getting the right difference but naming triangle 1 as the larger one, the subtraction done the wrong way round, gives 'Triangle 1, by 3.6 cm²'; leaving out the 1/2 when finding triangle 1's area (giving 116.8 cm² instead of 58.4 cm²) and then subtracting gives 'Triangle 1, by 54.8 cm²'; and using cos 64° instead of sin 64° for triangle 1 (giving 28.5 cm² instead of 58.4 cm²) gives 'Triangle 2, by 33.5 cm²'. Work out both areas fully and correctly before comparing which is bigger.
- (b) 60 — Method: independence means the proportion of part timers among the cyclists is the same as the proportion among all the employees, so find that proportion and apply it to the cyclists. Working: 150 of the 400 employees work part time, which is a proportion of 0.375. Applying it to the 160 cyclists gives 0.375 × 160 = 60 employees. Answer: you would expect 60 employees. The distractors: 310 adds 150 and 160, treating the group who do both as everyone who does one thing or the other; 10 subtracts 150 from 160, reading 'both' as the difference between the two counts; 75 halves the 150 part timers, assuming that independence means they split evenly between cyclists and non cyclists, which would need exactly half the workforce to cycle.
- (b) £220 — Method: round each ticket price to the nearest £5, multiply each rounded price by the number of tickets, then add the two totals. Working: the adult price £38.50 rounds to £40, and 4 × £40 = £160; the child price £19.75 rounds to £20, and 3 × £20 = £60; £160 + £60 = £220. Answer: £220. £213.25 is the exact total cost, found without rounding the prices first, so it is not an estimate. £160 comes from including the cost of the adult tickets only and forgetting the three children's tickets. £200 comes from swapping the two ticket quantities, using 3 adults and 4 children instead of 4 adults and 3 children.
- (d) 10 — The right angle is at (1, 1). The vertical side has length 5 − 1 = 4 and the horizontal side has length 6 − 1 = 5, so the area is (4 × 5) ÷ 2 = 20 ÷ 2 = 10. A candidate who forgets to halve the product of the two sides gets 4 × 5 = 20. A candidate who forgets to subtract the shared vertex's coordinate and uses the raw coordinates 6 and 5 as the side lengths gets (6 × 5) ÷ 2 = 30 ÷ 2 = 15. A candidate who uses only one side length as the area gets 5.
- (d) 90 cm — Method: scale each dimension by the scale factor, then find the perimeter. Working: model height = 240 ÷ 8 = 30 cm; model width = 120 ÷ 8 = 15 cm. Perimeter = 2 × (30 + 15) = 90 cm. Wrong options: 11.25 cm comes from squaring the scale factor as if finding an area (720 ÷ 64); 510 cm comes from scaling only one dimension and leaving the other at full size; 720 cm comes from finding the real perimeter (2 × (240 + 120)) but forgetting to scale it down at all.
- (d) 14.9 cm — By the sine rule, sin(BAC) ÷ BC = sin(ACB) ÷ AB, so sin(BAC) = 7 × sin35° ÷ 10 = 0.4015. This gives angle BAC = 23.7° or angle BAC = 156.3°; since angle BAC is acute, angle BAC = 23.7°. Angle ABC = 180° − 35° − 23.7° = 121.3°. By the sine rule again, AC ÷ sin(ABC) = AB ÷ sin(ACB), so AC = 10 × sin121.3° ÷ sin35° = 14.9 cm. Using angle BAC in the final step instead of angle ABC gives AC = 10 × sin23.7° ÷ sin35° = 7.0 cm — this just recomputes the given side BC. Using angle ACB again in the final step, instead of the newly found angle ABC, gives AC = 10 × sin35° ÷ sin35° = 10.0 cm — this just returns AB unchanged. Making a sign slip when finding angle ABC, computing 180° − 35° + 23.7° = 168.7° instead of subtracting it, and carrying that through gives AC = 10 × sin168.7° ÷ sin35° = 3.4 cm. Find angle BAC, then angle ABC, then apply the sine rule once more, and AC comes to 14.9 cm.
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
- (c) m = 6c — Method: the whole is the sum of the parts in the ratio, and the cement is 1 part, so one part weighs c kg. Working: the mix has 5 + 1 = 6 parts, each of mass c kg, so the total mass is 6 × c, giving m = 6c. Answer: m = 6c. The distractors: m = 5c uses the 5 gravel parts as the multiplier and forgets that the cement is in the mix too, so it gives the mass of the gravel and not the total; m = c + 5 comes from reading the ratio as '5 more than' and adding, which treats a number of parts as a mass in kilograms; m = c/6 turns the relationship upside down, as though the total were shared into the cement rather than the cement multiplied up to the total.
- (d) 4 m — The sloping slide is the hypotenuse of a right-angled triangle with the other two sides 2.4 m and 3.2 m. By Pythagoras' Theorem, hypotenuse² = 2.4² + 3.2² = 5.76 + 10.24 = 16. Square root: √16 = 4 m. Adding the two sides instead of squaring them gives 2.4 + 3.2 = 5.6 m. Truncating each squared side to a whole number before adding (5.76 to 5 and 10.24 to 10) gives √15 ≈ 3.87 m. Forgetting to take the square root and leaving the sum of the squares as the answer gives 5.76 + 10.24 = 16, written as 16 m.
- (d) 45 — v = s ÷ t = 180 ÷ 4 = 45 km/h. 720 comes from multiplying s and t instead of dividing, 180 × 4. 184 comes from adding s and t instead of dividing, 180 + 4. 176 comes from subtracting t from s instead of dividing, 180 − 4.
- (c) x = 0 or x = −7 — Factorising: x² + 7x = x(x + 7) = 0, so x = 0 or x + 7 = 0, giving x = 0 or x = −7. A candidate who divides both sides of the original equation by x, which loses the solution x = 0, gets only x = −7. A candidate who makes a sign error solving x + 7 = 0 gets x = 0 or x = 7. A candidate who misreads the coefficient and doubles it gets x = 0 or x = −14.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.