Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
CalculatorGCSE Higher
Answer key: GCSE Higher sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- (c) 4.1 × 10³, 3.2 × 10⁴, 2.9 × 10⁵ — The exponent decides the size first: 10³ is smaller than 10⁴, which is smaller than 10⁵, so the order is 4.1 × 10³, then 3.2 × 10⁴, then 2.9 × 10⁵. Reversing the whole list gives largest to smallest instead of smallest to largest. Comparing 3.2 × 10⁴ and 4.1 × 10³ by their coefficients alone, 3.2 against 4.1, and swapping them ignores that 10⁴ is bigger than 10³ regardless of the coefficient. Comparing 2.9 × 10⁵ and 3.2 × 10⁴ by their coefficients alone and swapping them makes the same mistake at the top of the list.
- (c) y = 200 − 8x — Method: in a linear model the amount present at the start is the constant term and the steady rate of change is the gradient, which is negative because the amount is falling. Working: at x = 0 minutes there are 200 litres, so the constant term is 200; 8 litres are lost every minute, so after x minutes 8x litres have gone and the amount left is y = 200 − 8x. Answer: y = 200 − 8x. The distractors: y = 8x + 200 treats the draining as filling, so the butt would gain 8 litres a minute; y = 200x − 8 swaps the two numbers over, using the starting 200 litres as the rate per minute and the 8 litres per minute as the starting amount; y = −8x − 200 makes the starting amount negative as well as the rate, so the butt would begin 200 litres in deficit.
- (a) 40 m² — A scale of 1 : 10 is a length scale factor of 10 from model to real. Areas scale with the square of the length scale factor: 10² = 100. 0.4 × 100 = 40, so the real staircase covers 40 m². Giving 4 m² uses the length scale factor, 10, without squaring it (0.4 × 10 = 4). Giving 0.04 m² divides by the scale factor instead of multiplying by its square (0.4 ÷ 10 = 0.04). Giving 400 m² cubes the scale factor, 10³ = 1000, as if area scaled like a volume (0.4 × 1000 = 400).
- (b) (6, 2) — The overall journey from house to park is the sum of the two vectors: top = 2 + 4 = 6, bottom = 5 + (−3) = 2, giving (6, 2). A candidate who subtracts the second vector from the first instead of adding gets (2 − 4, 5 − (−3)) = (−2, 8). A candidate who subtracts the other way round gets (4 − 2, −3 − 5) = (2, −8). A candidate who forgets the negative sign on the second vector's bottom number and adds 3 instead of −3 gets (6, 8). Because the journeys join end to end, the correct resultant vector is (6, 2).
- (c) 0.15 — Method: for two independent events, multiply along the branches of the tree to find the probability of both outcomes happening together. Working: P(red and heads) = P(red) × P(heads) = 0.3 × 0.5 = 0.15. Answer: 0.15. Watch out: adding the two probabilities, 0.3 + 0.5 = 0.8, does not give the probability of both — probabilities along one path of a tree are multiplied, not added. Writing down 0.5 ignores the spinner altogether and gives only the coin's probability. And writing down 0.65 is the probability of red OR heads, which is 0.3 + 0.5 − 0.15 = 0.65, a different question from the one asked here.
- (a) 1.5 — Method: with an even number of values the median is the mean of the two middle values, which for 12 values are the 6th and the 7th once the data are in order. Working: the results are already in order, and 12 ÷ 2 = 6, so the middle pair are the 6th value, 1, and the 7th value, 2; the median is (1 + 2) ÷ 2 = 1.5. Answer: 1.5 brothers and sisters. The distractors: 1 comes from reading the 6th value and stopping there instead of averaging the middle pair; 2 comes from working out the mean, 24 ÷ 12, instead of the median; 6 comes from working out the range, 6 − 0, which measures spread rather than centre.
- (c) 9/5 — Method: the area of a rectangle is its length multiplied by its width; the decimal product is then written over a power of ten and cancelled. Working: 24 × 75 = 1800, and 2.4 and 0.75 have three decimal places between them, so 2.4 × 0.75 = 1.8; the area of the panel is 1.8 square metres, which is eighteen tenths, so it can be written as 18/10, and dividing the numerator and the denominator by 2 gives 9 over 5. Answer: 9/5. The distractors: 4/5 comes from converting only the digits after the decimal point and losing the whole one, turning 1.8 into eight tenths; 63/20 comes from adding the two sides instead of multiplying them, giving 3.15; 9/50 comes from misplacing the decimal point in the product and writing 0.18, which cancels to 9 over 50.
- (a) y = 2ˣ + 3 — A translation of 3 units in the positive y-direction shifts the whole graph up, which means adding to the output: y = f(x) + k with k = 3, so the image is y = 2ˣ + 3. Adding the 3 inside the power instead of outside it, which translates the graph horizontally instead of vertically, gives y = 2ˣ⁺³. Using a negative 3, which moves the graph down instead of up, gives y = 2ˣ − 3. Mistaking 2ˣ for the linear expression 2x and adding 3 inside brackets gives y = 2(x + 3).
- (c) They are in direct proportion, because y ÷ x = 2.5 for both pairs. — Testing direct proportion means checking that y ÷ x is the same for every pair: 15 ÷ 6 = 2.5 and 25 ÷ 10 = 2.5, so the quantities are in direct proportion. Saying they are not in proportion because x + y differs uses addition, which is not the correct test for proportion. Saying they are not in proportion because y − x differs also uses the wrong test — subtraction, not division. Saying they are in proportion because x × y is 90 and 250 uses multiplication, which is the test for inverse proportion, and the two products are not even equal to each other, so this option also contradicts itself.
- (c) 62.9 cm² — Method: no two sides are given, so first find AC with the sine rule, then find the area using BC, AC and the angle between them, angle ACB. Working: angle BAC = 180° − 58° − 47° = 75°; by the sine rule, AC = 14 × sin 58° / sin 75° = 12.2915 cm; then area = 1/2 × 14 × 12.2915 × sin 47° = 62.9 cm² — keep the unrounded AC, since rounding it to 12.3 cm shifts the area to 63.0 cm². Pairing 14 with sin 75° and dividing by sin 58° instead (the ratio the wrong way round) gives AC = 15.9 cm and an area of 81.6 cm²; using angle BAC = 75° as the included angle instead of angle ACB gives 83.1 cm²; and assuming the triangle is isosceles with AC = BC = 14 cm, skipping the sine rule step entirely, gives 71.7 cm². The angle used in the area formula must be the one between the two sides being multiplied — here that is angle ACB, between BC and AC.
- (c) 1/36 — Method: the two dice do not affect each other, so the probability that both results happen is the product of the two separate probabilities. Working: a 1 on the red dice has probability 1/6 and a 2 on the blue dice has probability 1/6. Multiplying gives 1 × 1 = 1 on the top and 6 × 6 = 36 on the bottom. Answer: the probability is 1/36. The distractors: 1/18 comes from allowing either order, counting a 2 on the red dice with a 1 on the blue dice as well, although the stem names which dice shows which score; 1/3 comes from adding 1/6 and 1/6 instead of multiplying; 1/6 comes from giving the probability for one dice only and treating the other as making no difference.
- (d) 12 — Method: if the bracelets are identical and no beads are left over, the number of bracelets must divide exactly into both totals, so it is the highest common factor of 24 and 36. Working: 24 = 2³ × 3 and 36 = 2² × 3²; taking the lower index of each shared prime gives 2² × 3 = 4 × 3 = 12. Each bracelet then has 2 red beads and 3 blue beads. Answer: 12. The distractors: 6 comes from taking each shared prime once rather than at its lower index, giving 2 × 3, which is a common factor but not the highest; 72 is the lowest common multiple of 24 and 36, from taking the higher index of each prime instead of the lower; 60 comes from adding the two bead totals instead of looking for a common factor.
- (d) 12 m — Method: give the width a letter, write the length in terms of it and use length × width = area to form a quadratic. Working: with a width of x metres the length is x + 4, so x(x + 4) = 96, which rearranges to x² + 4x − 96 = 0; factorising gives (x + 12)(x − 8) = 0, and a width must be positive, so x = 8 and the length is 8 + 4 = 12. Answer: 12 m, and 12 × 8 = 96 as the area requires. The distractors: 8 m is the width rather than the length asked for; 16 m comes from taking the other root as 12 and adding 4 to it, ignoring that the root −12 cannot be a width; 24 m comes from dividing the area by the 4 in the question instead of forming an equation.
- (d) £117.60 — Add the hours worked over the two days: 6 + 4.5 = 10.5 hours. Multiply by the rate of pay: 10.5 × £11.20 = £117.60. (£67.20 is Monday's pay only. £50.40 is Tuesday's pay only. £106.40 comes from mistakenly adding the hours as 6 + 3.5 = 9.5 — misreading Tuesday's 4.5 hours as 3.5 — and then multiplying by £11.20.)
- (b) RHS - right angle, hypotenuse and one side equal — A right angle, the hypotenuse (13 cm) and one other side (5 cm) are equal in both triangles, so this is RHS. SAS would need the equal angle to be the one INCLUDED between the two equal sides, but the right angle at B is not between AB and the hypotenuse AC — it is opposite the hypotenuse instead, so SAS does not apply directly here. SSS needs all three sides, but only two sides are stated. ASA needs two angles, but only one angle (the right angle) is given.
- (d) 7n − 2 — Method: find how much the total cost rises each month, then find the constant that fits the cost for one month. Working: the cost rises by £7 for each extra month (12 − 5 = 7, 19 − 12 = 7, 26 − 19 = 7), so the cost has the form 7n + c. Substituting n = 1: 7(1) + c = 5, so c = −2. Answer: the total cost in pounds is 7n − 2. The value 7n comes from leaving out the constant. The value 7n + 5 comes from using the cost of one month as the constant directly, without subtracting the monthly rise first. The value 5n + 7 comes from swapping the roles of the cost of one month, £5, and the monthly rise, £7 — using the cost of one month as the coefficient of n and the rise as the constant.
- (c) 3 — Method: for a tangent written in the form y = mx + c, the coefficient m is the gradient of the line, and the gradient of the tangent at its point of contact equals the curve's instantaneous rate of change there. Working: y = 3x − 2 has gradient 3, so the instantaneous rate of change of y with respect to x at x = 4 is 3. Reading the constant term as the rate instead of the coefficient of x gives −2, but −2 is only where the tangent crosses the y-axis, not a rate. Reading the x-coordinate of the point of contact as the rate gives 4, but 4 only tells you where on the curve the tangent touches, not how fast y is changing there. Substituting x = 4 into the tangent equation, 3 × 4 − 2 = 10, gives the y-coordinate of the point of contact, not the rate; a candidate who works out the height of the point instead of the gradient gives 10. Whenever a tangent is given as an equation, the rate of change is always the coefficient of x — do not let the constant term, the x-value or a substituted y-value stand in for it.
- (a) 12π + 16 cm — A three-quarter sector's perimeter is the curved arc plus the two straight radii that close the shape. The full circumference is 2 × π × 8 = 16π cm, and three-quarters of that is 12π cm. Adding the two straight radii, 8 cm each, gives 12π + 16 cm. Leaving out the straight edges gives just 12π cm. Using one-quarter of the circumference, the piece left over rather than the piece asked for, gives 4π + 16 cm. Adding only one radius instead of two gives 12π + 8 cm.
- (c) x² − 2x − 15 ≥ 0 — The critical values are x = −3 and x = 5, so the quadratic factorises as (x + 3)(x − 5). Expanding: (x + 3)(x − 5) = x² − 2x − 15. Since the solution set is OUTSIDE the roots (x ≤ −3 or x ≥ 5), the quadratic must be ≥ 0 there, since a positive U-shape sits above the axis outside its roots. So the inequality is x² − 2x − 15 ≥ 0. Distractor routes: x² + 2x − 15 ≥ 0 comes from factorising as (x − 3)(x + 5), swapping the sign of each root when forming the brackets. x² − 2x − 15 ≤ 0 keeps the correct expansion but uses ≤ 0, which gives the region between the roots instead of outside them. x² − 8x + 15 ≥ 0 comes from using roots x = 3 and x = 5, dropping the negative sign on −3 before expanding.
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.