Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
CalculatorGCSE Higher
Answer key: GCSE Higher sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- (c) −5 ≤ −5 — The symbol ≤ means 'less than or equal to', and −5 is equal to −5, so this statement is true. −3 ≥ −1 is false: a candidate who ignores the negative signs and compares 3 with 1 would wrongly think −3 is the bigger number, but on the number line −3 is smaller than −1. 0.4 < 2/5 is false because 2/5 converts to exactly 0.4, so the two values are equal, not one strictly less than the other — a candidate who assumes a fraction is automatically bigger than a similar-looking decimal without converting it would miss this. 7/10 ≤ 0.6 is false because 7/10 converts to 0.7, which is bigger than 0.6; a candidate who misplaces the decimal point and converts 7/10 as 0.07 would wrongly believe this statement is true.
- (c) 14.1 — Method: in x² + y² = r² the right-hand side is the square of the radius, so take its square root to find the radius, then double the radius because the diameter is twice the radius. Working: r² = 50, so r = √50 = 7.07106…, and the diameter is 2 × 7.07106… = 14.14213…, which is 14.1 correct to 1 decimal place. Answer: 14.1. The distractors: 7.1 is the radius, worked out correctly but never doubled, so it answers a question about the radius rather than the diameter; 100.0 comes from doubling the 50 on the right-hand side, treating r² as though it were already the radius; 25.0 comes from halving the 50, treating r² as though it were already the diameter.
- (c) 250 miles — Find the distance travelled in 1 hour: 150 ÷ 3 = 50 miles. Multiply by 5 hours: 50 × 5 = 250 miles. Giving 300 miles doubles the original distance (150 × 2 = 300) using a scale factor of 2 instead of the correct 5 ÷ 3. Giving 200 miles adds only one extra hour's distance, 50, instead of the two extra hours actually needed (150 + 50 = 200, rather than 150 + 100). Giving 90 miles divides by the scale factor instead of multiplying (150 × 3 ÷ 5 = 90).
- (d) 4 — Method: a plane of symmetry must pass through the apex and cut the base along one of the base's own lines of symmetry. Working: a square has 4 lines of symmetry (2 through opposite edge midpoints, 2 through opposite corners), and each of these, combined with the apex, gives one plane of symmetry of the pyramid. A student who answers 2 has only found the planes through the edge midpoints, or only the ones through the corners, and missed the other pair. A student who answers 8 has doubled the correct count, perhaps confusing it with a different solid. A student who answers 1 has only spotted the one obvious front-to-back plane. Answer: 4.
- (b) 5/12 — There are 36 equally likely ordered pairs. Listing the pairs where the red score is smaller than the blue score gives 15 outcomes, so the probability is 15/36 = 5/12. Choosing 1/2 comes from assuming the 36 outcomes split evenly between 'red smaller' and 'red bigger', which ignores the 6 outcomes where the two dice show the same score. Choosing 7/12 comes from including the outcomes where the two scores are equal, 15 + 6 = 21, giving 21/36 = 7/12, instead of using 'less than' strictly. Choosing 5/36 comes from counting only the outcomes where the two scores differ by exactly 1, such as (1, 2) and (2, 3), which is 5 outcomes, and missing the pairs that differ by more than 1.
- (c) The median, £160,000, as one very high price lifts the mean — Method: find both averages, then choose the one that sits closer to the bulk of the data. Working: in order the prices are 140,000, 150,000, 160,000, 170,000 and 580,000, so the median is the third of the five, £160,000. For the mean, 140,000 + 150,000 + 160,000 + 170,000 + 580,000 = 1,200,000 and 1,200,000 ÷ 5 = 240,000, so the mean is £240,000. Four of the five houses sold for £170,000 or less, so a reader told that a typical price is £240,000 would expect to pay at least £70,000 more than any of those four cost. Answer: the median, £160,000, as one very high price lifts the mean. The distractors: £580,000 is the middle value of the list as it is printed, which is the median only when the values have first been put in order; £240,000 is the mean, chosen on the ground that a median ignores three of the five prices, but a median uses all five to find which one is central and is then untroubled by how extreme the outer values are; £155,000 comes from deleting the £580,000 house and taking the mean of what is left, since 140,000 + 150,000 + 160,000 + 170,000 = 620,000 and 620,000 ÷ 4 = 155,000, but a real sale may not be thrown away merely for being large.
- (b) 5.1 — ∛130 lies between 5 and 6, since 125 < 130 < 216, and closer to 5 because 130 is much nearer 125 than 216. To pin down the first decimal place, test the midpoint of the tenth, 5.05: 5.05³ = 5.05 × 5.05 × 5.05 ≈ 128.79. Since 130 is greater than 128.79, ∛130 lies above 5.05, so it rounds to 5.1 rather than 5.0. Rounding down to 5.0, on the assumption that a value close to the lower bound 125 must round down, ignores that 5.05³ is already less than 130. Estimating 5.2 overshoots the true root: 5.2³ = 140.608, which is well above 130, so ∛130 cannot round to 5.2. Taking 6.0, the upper of the two whole numbers the root lies between, ignores that 130 is far nearer to 5³ = 125 than to 6³ = 216, so the root sits just above 5, not just below 6.
- (d) x = 3 or x = −3 — Method: get x² on its own with a coefficient of 1, then take the square root of both sides and keep both the positive and the negative root. Working: dividing 2x² = 18 by 2 gives x² = 9, and the square root of 9 is 3, so x = 3 or x = −3; both check, because 2 × 9 = 18 either way. Answer: x = 3 or x = −3. The distractors: x = 9 or x = −9 comes from dividing by 2 and then forgetting to take the square root; x = 4 or x = −4 comes from subtracting 2 from 18 instead of dividing by it, giving x² = 16; x = 6 or x = −6 comes from multiplying by 2 instead of dividing, giving x² = 36.
- (d) £7060 — A 6% decrease each year means the value becomes 100% − 6% = 94% of the previous year's value, and 94% = 0.94, so the multiplier is 0.94. Apply it once for each of the 3 years: £8500 × 0.94 = £7990 after 1 year, £7990 × 0.94 = £7510.60 after 2 years, £7510.60 × 0.94 = £7059.96 after 3 years, which rounds to £7060 to the nearest pound. (£6970 comes from using simple depreciation instead of compound, taking 6% of the original £8500 three times: £8500 − 3 × £510 = £6970. £7990 is the value after only 1 year, forgetting the remaining 2 years. £7511 is the value after only 2 years, £8500 × 0.94² = £7510.60, forgetting the third year.)
- (d) 20 cm — The scale factor from P to Q is 15 ÷ 6 = 2.5. Apply the same scale factor to the other side: 8 × 2.5 = 20 cm. A pupil who divides instead of multiplying by the scale factor gets 8 ÷ 2.5 = 3.2 cm. A pupil who adds the difference between the two known sides, 15 − 6 = 9, to 8 instead of scaling gets 8 + 9 = 17 cm. A pupil who rounds the scale factor 2.5 down to 2 gets 8 × 2 = 16 cm. The correct length is 20 cm.
- (d) 136 — 15% of 160 = 0.15 × 160 = 24 patients reported side effects, so 160 − 24 = 136 did not. Stopping after finding the number who reported side effects, 24, answers the wrong question — it is not the number who did NOT report them. Misreading '15%' as a raw count of 15 patients, rather than a percentage, gives 160 − 15 = 145. Subtracting 15% of 160 twice, 160 − 24 − 24 = 112, double-counts the side-effect group.
- (a) 8 — To undo 'multiply by 4, then add 8', reverse the operations in reverse order: subtract 8 first, then divide by 4. 40 − 8 = 32, and 32 ÷ 4 = 8, so the number is 8. A candidate who added 8 again instead of subtracting worked out 40 + 8 = 48, then 48 ÷ 4 = 12. A candidate who divided before subtracting, doing the inverse operations in the wrong order, worked out 40 ÷ 4 = 10, then 10 − 8 = 2. A candidate who multiplied instead of dividing at the last step worked out (40 − 8) × 4 = 32 × 4 = 128.
- (d) x² − 6x + 9 — Method: squaring a bracket means multiplying that bracket by itself, so expand (x − 3)(x − 3) term by term and then collect like terms. Working: x × x = x², x × (−3) = −3x, (−3) × x = −3x and (−3) × (−3) = 9, giving x² − 3x − 3x + 9, and the two middle terms collect to −6x. Answer: x² − 6x + 9. The distractors: x² − 3x + 9 comes from writing down only one of the two middle products instead of both; x² + 6x + 9 comes from treating (−3) × x as +3x, so the middle terms are added rather than subtracted; x² − 9 comes from treating the square as the difference of two squares (x − 3)(x + 3).
- (c) £7617.60 — To decrease by 8% each year, multiply by 0.92 (100% − 8%) twice. £9000 × 0.92 × 0.92 = £7617.60. £7560.00 comes from treating the two 8% decreases as a single flat 16% decrease applied once instead of compounding: £9000 × 0.84 = £7560.00. £8280.00 comes from applying the 8% decrease only once, for 1 year instead of 2: £9000 × 0.92 = £8280.00. £10497.60 comes from multiplying by 1.08 twice, increasing the value instead of decreasing it: £9000 × 1.08 × 1.08 = £10497.60.
- (b) 2 500 000 cm³ — Method: a volume conversion uses the length factor three times, once for each dimension. Working: 1 m = 100 cm, so a cube of side 1 m is a cube of side 100 cm, and 100 × 100 × 100 = 1 000 000, giving 1 m³ = 1 000 000 cm³. Then 2.5 × 1 000 000 = 2 500 000. Answer: 2 500 000 cm³. Using the plain length factor 100 gives 250 cm³. Using 1000, which is the factor that turns cubic metres into litres, gives 2500 cm³. Using 10 000, which is the factor that belongs to square metres and square centimetres, gives 25 000 cm³.
- (d) Overestimate — the curve bends upward (convex). — The first differences of the speeds are 3, 5, 7 and 9, so the second differences are 2, 2 and 2 — constant and positive, which means the speed-time graph curves upwards (is convex). On a convex curve, each straight chord used by the trapezium rule lies above the curve, so the trapezium rule overestimates the true distance. 'Underestimate — the curve bends upward' states the same correct geometry but gets the conclusion backwards — a chord above the curve means too much area is counted, not too little. 'Overestimate — the speed values are increasing' uses the wrong evidence: increasing speed alone doesn't tell you whether the curve bends up or down, only the second differences do. 'Underestimate — second differences are constant' confuses a constant second difference with a steady rate of change in speed, which isn't what the second difference of a speed-time table measures.
- (a) 0.6 litres — The ratio 1 : 9 means the solution has 1 + 9 = 10 equal parts in total. Each part is 6 ÷ 10 = 0.6 litres, and disinfectant is 1 part, so Priti needs 0.6 litres of disinfectant. Giving 0.667 litres divides by 9, the number of parts of water, instead of the total number of parts, 10 (6 ÷ 9 ≈ 0.667). Giving 6 litres is the total amount of solution, not just the disinfectant's share of it. Giving 5.4 litres works out the water's share (6 × 9 ÷ 10 = 5.4), not the disinfectant's.
- (d) RHS, using AM as common side — Triangle ABM and triangle ACM both have a right angle at M, since AM is perpendicular to BC. AB and AC are the hypotenuses of the two triangles and are equal, and AM is a side common to both triangles, giving a right angle, equal hypotenuses and one further equal side, exactly RHS, so 'RHS, using AM as common side' is correct. 'SAS, right angle as included angle' wrongly treats the right angle at M as included between AB and AM, but AB is the hypotenuse, not one of the two sides forming that right angle. 'SSS, using BM = CM as a fact' wrongly assumes BM equals CM as a given fact, when this is only true because of the RHS congruence, not before it, so it cannot be used to prove that congruence. 'ASA, AB as the included side' again wrongly labels a side as if it could sit between two angles when only one angle, the right angle, is actually known.
- (d) Below y = x + 1, below x + y = 5, above y = 0 — For y ≤ x + 1, R lies on or below the line y = x + 1. For x + y ≤ 5 (that is, y ≤ 5 − x), R lies on or below that line too. For y ≥ 0, R lies on or above the x-axis. Combining all three: R is below y = x + 1, below x + y = 5, and above y = 0. Distractor routes: "Above y = x + 1" flips the first inequality, describing the wrong side of that line. "Above x + y = 5" flips the second inequality, describing the wrong side of that line. "Below y = 0" flips the third inequality, describing the wrong side of the x-axis.
- (c) xₙ₊₁ = ∛(9 − 4xₙ) — Method: a formula xₙ₊₁ = f(xₙ) is a correct rearrangement when the equation x = f(x) turns back into the equation you started with, so rearrange x³ + 4x − 9 = 0 by making the cube the subject. Working: x³ + 4x − 9 = 0 gives x³ = 9 − 4x, because the 4x and the 9 each change sign as they cross the equals sign; taking the cube root of both sides gives x = ∛(9 − 4x), which is the formula xₙ₊₁ = ∛(9 − 4xₙ). Answer: xₙ₊₁ = ∛(9 − 4xₙ). The distractors: ∛(9 + 4xₙ) comes from writing x³ = 9 + 4x, moving the 4x across the equals sign without changing its sign; (9 + xₙ³)/4 comes from making the linear term the subject but keeping the sign of the cube, writing 4x = 9 + x³ when the equation gives 4x = 9 − x³; ∛(9 − 4xₙ³) cubes the x in the linear term as well, changing a term the original equation never cubed.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.