Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
CalculatorGCSE Higher
Answer key: GCSE Higher sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- (b) £37 — One box costs £4 + £3 = £7. Five boxes cost 5 × £7 = £35. Adding the single £2 delivery fee gives £35 + £2 = £37. A candidate who added the £2 delivery fee to each box instead of once for the whole order worked out 5 × (£7 + £2) = 5 × £9 = £45. A candidate who forgot the £3 markup and used the shop's buying price worked out 5 × £4 + £2 = £22. A candidate who added the £3 markup only once, after multiplying the buying price by 5, worked out 5 × £4 + £3 + £2 = £25.
- (d) k < 4 — Method: the number of real solutions of ax² + bx + c = 0 is decided by the discriminant b² − 4ac, and two different real solutions need it to be greater than zero. Working: here a = 1, b = −4 and c = k, so b² − 4ac = 16 − 4k; the condition is 16 − 4k > 0, which gives 16 > 4k and then k < 4. Answer: k < 4; for example k = 3 gives x² − 4x + 3 = 0, whose solutions are 1 and 3. The distractors: k ≤ 4 comes from using b² − 4ac ≥ 0, which also allows the single repeated solution at k = 4; k > 4 comes from dividing −4k > −16 by −4 without reversing the inequality sign; k < 16 comes from leaving the factor 4 out of 4ac and solving 16 − k > 0.
- (b) 20 — The gradient is the change in p divided by the change in t: (90 − 30) ÷ (5 − 2) = 60 ÷ 3 = 20. Choosing 0.05 comes from dividing the change in t by the change in p, the wrong way round (3 ÷ 60). Choosing −20 comes from subtracting the coordinates in the wrong order for one part of the calculation, for example (30 − 90) ÷ (5 − 2), giving a negative value. Choosing 18 comes from dividing the second p-coordinate by the second t-coordinate directly (90 ÷ 5) instead of using the change between the two points.
- (c) 32 cm — Method: a perimeter is lengths added together, so it scales by the length scale factor itself, which is 4 ÷ 3 going from the smaller triangle to the larger one — not by its square. Working: 24 ÷ 3 = 8, and 8 × 4 = 32. Answer: 32 cm. The distractors: 18 cm comes from multiplying by 3 ÷ 4, scaling from the larger triangle down to the smaller one; 25 cm comes from adding the difference between the parts of the ratio, 4 − 3 = 1, to the perimeter; 8 cm comes from dividing by 3 and stopping there, before multiplying by 4.
- (b) 2/11 — Method: restrict the 36 equally likely outcomes to those where at least one die shows a 5, then find what fraction of THOSE give a total of 8. Working: outcomes with at least one 5: (5, 1), (5, 2), (5, 3), (5, 4), (5, 5), (5, 6), (1, 5), (2, 5), (3, 5), (4, 5), (6, 5) — 11 outcomes. Among these, the total is 8 for (5, 3) and (3, 5) — 2 outcomes. P(total 8 | at least one 5) = 2/11. Answer: 2/11. Watch out: 5/36 is P(total 8) over the full 36 outcomes — it ignores that you already know one die shows a 5. Treating the condition as 'the first die shows a 5' instead of 'at least one die shows a 5' restricts you to only 6 outcomes and misses the (3, 5) case, giving 1/6. And counting only (5, 3) but not its reverse (3, 5) inside the correct 11-outcome list gives 1/11 instead of 2/11.
- (c) 20 ≤ h < 40 — Method: with 80 values the lower quartile is the 80 ÷ 4 = 20th value in order, so build a running total until it first reaches 20. Working: the running totals are 14, then 14 + 22 = 36, then 52, then 80; the 20th plant is past 14 but not past 36, so it lies in the second class. Answer: the lower quartile lies in the class 20 ≤ h < 40. The distractors: 0 ≤ h < 20 comes from believing that the bottom quarter of the data must all sit in the first class, when that class holds only 14 of the 80 plants; 40 ≤ h < 50 comes from using the position 80 ÷ 2 = 40 and so locating the median rather than the lower quartile; 50 ≤ h < 80 comes from counting 20 plants down from the tallest instead of up from the shortest, which locates the upper quartile at the 60th plant.
- (a) 4,000 nanometres — Method: the number of nanometres is the diameter divided by the length of one nanometre, and dividing powers of ten means subtracting the indices. Working: −6 − (−9) = 3, so 10⁻⁶ ÷ 10⁻⁹ = 10³, and the diameter is 4 × 10³ nanometres. Answer: 4,000 nanometres. The distractors: 400 nanometres comes from taking the difference between the indices as 2 instead of 3; 4 nanometres comes from changing the name of the unit without converting, leaving the coefficient untouched; 0.004 nanometres comes from dividing by 10³ instead of multiplying by it, as though a nanometre were the larger of the two units.
- (d) 11 — f⁻¹(x) = 5 means x = f(5), since applying f to both sides undoes the inverse. f(5) = 2 × 5 + 1 = 11. Writing 2 comes from confusing f⁻¹(x) = 5 with f(x) = 5, and solving 2x + 1 = 5 instead: 2x = 4, x = 2. Writing 9 comes from finding f⁻¹(x) with a sign error, f⁻¹(x) = (x + 1)/2 instead of (x − 1)/2, then setting this equal to 5: x + 1 = 10, x = 9. Writing 6 comes from finding f⁻¹(x) without dividing by 2 at all, f⁻¹(x) = x − 1, then setting this equal to 5: x = 6.
- (c) £7590 — Apply interest, then subtract the payment, once for each year. Year 1: 8000 × 1.05 = 8400, then 8400 − 600 = 7800. Year 2: 7800 × 1.05 = 8190, then 8190 − 600 = 7590, so £7590 remains after 2 years. Forgetting the payments altogether and only compounding the interest gives 8000 × 1.05 = 8400, then 8400 × 1.05 = 8820 — this ignores that £600 leaves the fund every year. Subtracting the £600 BEFORE adding interest each year, instead of after, gives (8000 − 600) × 1.05 = 7770, then (7770 − 600) × 1.05 = 7528.50, which changes the order the two operations happen in and so changes the amount that earns interest each year. Subtracting the two payments as one lump sum of £1200 at the very end, from the no-withdrawal total 8820 − 1200 = 7620, ignores that the first £600 withdrawal also stops earning interest during the second year. Always apply interest, then the withdrawal, in that order, once for every single year.
- (b) 10.5 m² — The area of a trapezium is half of the sum of the parallel sides, multiplied by the width. Add the parallel sides: 2.5 + 4.5 = 7. Multiply by the width: 7 × 3 = 21. Half of 21 is 10.5 m². 21 m² forgets to halve, using the full (2.5+4.5)×3. 3.5 m² averages the two parallel sides, (2.5+4.5)÷2 = 3.5, but forgets to multiply by the width. 6.75 m² treats the bed as a triangle, using only the longer parallel side: half of 4.5 × 3.
- (a) 1/6 — Method: write the results of the two dice as ordered pairs, count the pairs whose scores add to the total asked for, divide by the number of ordered pairs there are, then cancel the fraction down. Working: there are 6 × 6 = 36 equally likely ordered pairs. The pairs whose scores add to 7 are (1, 6), (2, 5), (3, 4), (4, 3), (5, 2) and (6, 1), which is 6 pairs, so the probability is 6/36. Dividing the top and the bottom by 6 gives 1/6. Answer: the probability is 1/6. The distractors: 7/36 comes from taking the number of favourable pairs to be 7 because 7 is the total asked for, confusing the size of a total with the number of ways of making it; 1/7 comes from using the 21 different combinations of two scores as the equally likely results, finding the 3 combinations 1 and 6, 2 and 5, 3 and 4, and cancelling 3/21; 6/11 comes from counting the 6 favourable pairs correctly but dividing by the 11 possible totals from 2 to 12 rather than by the 36 pairs.
- (b) 14.5 ≤ l < 15.5 — A measurement given to the nearest metre could have been rounded from anywhere up to half a metre below or above it: 15 − 0.5 = 14.5 and 15 + 0.5 = 15.5. Every value from 14.5 up to (but not reaching) 15.5 rounds to 15, so the error interval is 14.5 ≤ l < 15.5, with the lower bound included and the upper bound excluded. Making both ends strict, 14.5 < l < 15.5, wrongly excludes 14.5 itself, even though 14.5 does round to 15. Making both ends inclusive, 14.5 ≤ l ≤ 15.5, wrongly includes 15.5, which actually rounds up to 16, not 15. Using a whole metre either side instead of half a metre, giving 14 ≤ l < 16, comes from forgetting that the error is only half the rounding unit.
- (d) 2n² − n − 2 — First differences: 5, 9, 13, 17. Second differences: 4, 4, 4, so a = 4 ÷ 2 = 2. Subtracting 2n² (2, 8, 18, 32, 50) from the terms (−1, 4, 13, 26, 43) leaves −3, −4, −5, −6, −7, which is the linear expression −n − 2. So the nth term is 2n² − n − 2. Using the second difference itself as a, without halving it, gives 4n² − n − 2. Finding a = 2 correctly but dropping the linear remainder −n − 2 entirely leaves 2n². Treating the first first difference (5) as a common difference and building a + (n − 1)d = −1 + 5(n − 1) gives 5n − 6, which only matches the first two terms.
- (a) 4 hours — This is inverse proportion: more pumps take less time. Multiply the original numbers to find the total pump-hours needed: 2 × 10 = 20 pump-hours. Divide by the new number of pumps: 20 ÷ 5 = 4 hours. Working out 10 × 5 ÷ 2 = 25 hours treats it as direct proportion, as if more pumps needed more time. Stopping at 20 gives the total pump-hours, not the number of hours. Working out 10 − (5 − 2) = 7 hours subtracts the extra number of pumps straight from the number of hours, treating pumps and hours as the same kind of quantity. 5 pumps take 4 hours.
- (d) 12 cm — Since DE is parallel to BC, triangle ADE is similar to triangle ABC (the two triangles share angle A, and the parallel lines make the angles at D and E equal to the angles at B and C). The whole side AB = AD + DB = 3 + 6 = 9 cm. The scale factor from the small triangle to the large triangle is AB ÷ AD = 9 ÷ 3 = 3, so BC = DE × 3 = 4 × 3 = 12 cm. Scaling by DB ÷ AD instead of AB ÷ AD gives 4 × (6 ÷ 3) = 8 cm. Adding DB directly onto DE, instead of scaling, gives 4 + 6 = 10 cm. Treating the triangles as congruent rather than similar, so assuming corresponding sides are simply equal, gives BC = DE = 4 cm.
- (b) y = 2x and y = −(1/2)x + 1 — Method: two lines are perpendicular when the product of their gradients is −1, so the gradient of each line is read from the number multiplying x and the two are multiplied together. Working: for y = 2x and y = −(1/2)x + 1 the gradients are 2 and −1/2, and 2 × (−1/2) = −1, so that pair is perpendicular. Answer: y = 2x and y = −(1/2)x + 1. The distractors: the pair y = 2x and y = 2x + 1 has equal gradients, whose product is 4, so those two lines are parallel and never meet, and they are chosen by a candidate applying the parallel condition; the pair y = 2x and y = −2x + 1 comes from changing the sign of the gradient without turning it upside down, and its product is −4; the pair y = 2x and y = (1/2)x + 1 comes from turning the gradient upside down without changing its sign, and its product is 1.
- (d) The 750 g box, at 36p per 100 g — Work out the cost per 100 g of each box. 750 g box: 270p ÷ 7.5 = 36p per 100 g. 500 g box: 195p ÷ 5 = 39p per 100 g. The lower cost per 100 g is the better value, so the 750 g box at 36p per 100 g is the answer. Choosing the 500 g box at 39p per 100 g gets the maths right but picks the higher unit price, not realising a smaller cost per 100 g is the better deal. Choosing the 500 g box because £1.95 is lower than £2.70 compares the total prices without allowing for the different pack sizes at all. Working out 270 ÷ 5 = 54p divides the 750 g box's price by the wrong number of hundred-grams (the 500 g box's), giving a rate that belongs to neither box. The 750 g box, at 36p per 100 g, is the better value.
- (b) 3 — Method: the scale factor is a length of the second triangle divided by the corresponding length of the first, and corresponding means shortest paired with shortest. Working: the shortest side of the first triangle is 3 cm and the shortest side of the second is 9 cm, so the scale factor is 9 ÷ 3 = 3. Answer: 3. The distractors: 1/3 comes from dividing 3 by 9, which is the scale factor from the second triangle back to the first; 6 comes from subtracting, 9 − 3, treating the scale factor as a difference rather than a multiplier; 1.8 comes from dividing 9 by 5, pairing the second triangle's shortest side with the first triangle's longest side.
- (d) 110 — Method: form the equation 15 + 0.08m = 23.80, where m is the number of minutes, then solve for m. Working: subtract the fixed fee: 0.08m = 23.80 − 15 = 8.80. Divide by the cost per minute: m = 8.80 ÷ 0.08 = 110. Answer: 110 minutes. 1.1 comes from using 8 instead of 0.08 as the cost per minute, forgetting to convert pence to pounds. 297.5 comes from dividing the whole bill by the cost per minute without subtracting the fixed fee first, 23.80 ÷ 0.08. 485 comes from adding the fixed fee to the bill instead of subtracting it, before dividing by the cost per minute, (23.80 + 15) ÷ 0.08.
- (d) x² − 49 — Area = length × width = (x + 7)(x − 7). Expanding: x × x = x², x × (−7) = −7x, 7 × x = 7x, 7 × (−7) = −49. The two middle terms −7x and 7x cancel, leaving x² − 49. A candidate who misremembers the difference-of-two-squares result as a sum gets x² + 49. A candidate who makes a sign error and treats both middle terms as −7x instead of cancelling gets x² − 14x − 49. A candidate who confuses area with perimeter and simply adds the length and width gets 2x.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.