Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
CalculatorGCSE Higher
Answer key: GCSE Higher sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- (c) 0.7, 0.72, 3/4 — Method: numbers written in different forms cannot be compared as they stand, so every fraction is turned into a decimal by dividing the numerator by the denominator, and the decimals are then compared place by place from the left. Working: 3/4 means 3 ÷ 4 = 0.75, so the three values to compare are 0.7, 0.75 and 0.72; written to two decimal places they are 0.70, 0.75 and 0.72, and the hundredths digits 0, 5 and 2 put 0.70 first, 0.72 next and 0.75 last; written again in the forms the question used, the order from smallest is 0.7, then 0.72, then 3/4. Answer: 0.7, 0.72, 3/4. The distractors: 3/4, 0.7, 0.72 comes from turning 3/4 into 0.34 by writing the numerator and the denominator as the two digits after the point, which makes the fraction the smallest of the three; 0.72, 3/4, 0.7 comes from the belief that the more digits a decimal has the smaller it must be, which puts both 0.72 and 0.75 below 0.7 and 0.72 below 0.75; 3/4, 0.72, 0.7 comes from comparing the three values correctly but listing them largest first, against an instruction to start with the smallest.
- (d) 6n + 3 — Method: find the price per passenger, then find the booking fee that fits a booking for 1 passenger. Working: the cost rises by £6 for each extra passenger (15 − 9 = 6, 21 − 15 = 6, 27 − 21 = 6), so the cost has the form 6n + c. Substituting n = 1: 6(1) + c = 9, so c = 3. Answer: the cost in pounds is 6n + 3. 6n ignores the booking fee altogether. 6n + 9 uses the cost of one passenger, £9, as the fee without first subtracting the £6 per-passenger price. 9n + 6 swaps the two numbers, using the first cost as the price per passenger and the difference as the fee.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (c) 18 — Method: divide the real length by 5 to find how many 'units' of 5 m it contains, then multiply by 2 cm for each unit. Working: 45 ÷ 5 = 9, so the real bridge is 9 lots of 5 m; each lot is represented by 2 cm on the model, so the model length is 9 × 2 = 18 cm. Options: 9 comes from stopping after the division, without multiplying by the 2 cm per unit; 90 comes from multiplying the real length by 2 directly, without dividing by 5 first; 4.5 comes from dividing by 5 and then dividing by 2 again, instead of multiplying by 2. Answer: 18.
- (b) 1/20 — Method: two draws with nothing put back are combined by multiplying, with the second probability worked out from the tickets still in the bag. Working: the first draw takes the wanted ticket with probability 1/5. That ticket is kept out, so 4 tickets remain and only one of them is the ticket wanted second, giving 1/4. Multiplying gives 1/20. Answer: the probability is 1/20. The distractors: 1/10 comes from ignoring the order and treating the draw as a choice of two tickets from five, of which there are ten; 1/25 comes from keeping the total at 5 for the second draw, which is what happens only if the first ticket is put back; 2/5 comes from counting the two wanted tickets over the five in the bag, as though one draw decided the whole question.
- (a) 1.6 — Method: on a histogram the height of a bar is the frequency density, and frequency density = frequency ÷ class width. Working: the class 15 ≤ t < 30 runs from 15 to 30, so its width is 30 − 15 = 15 minutes; the frequency is 24, so the frequency density is 24 ÷ 15 = 1.6. Answer: 1.6 people per minute. The distractors: 360 comes from multiplying the frequency by the class width, 24 × 15, which uses the area rule backwards — area gives the frequency, so the frequency must be divided by the width to give the height; 0.625 comes from dividing the class width by the frequency, 15 ÷ 24, reversing the formula; 0.8 comes from dividing by the upper class boundary, 24 ÷ 30, instead of by the width of the class.
- (c) 1,000 m² — Method: round each length to 1 significant figure, then use area of a rectangle = length × width on the rounded lengths. Working: 19.6 m rounds to 20 m and 48.3 m rounds to 50 m, so the estimate is 20 × 50 = 1,000 and the area is about 1,000 m². Answer: 1,000 m². The distractors: 800 m² comes from rounding 48.3 down to 40 when the digit after its first significant figure is 8 and sends it up to 50, giving 20 × 40 = 800; 140 m² is the perimeter of the rounded rectangle, 2 × 20 + 2 × 50 = 140, not its area; 70 m² comes from adding the rounded lengths, 20 + 50 = 70, instead of multiplying them.
- (a) 4 — Method: set up the equation 35 + 20h = 115, then subtract the fixed fee and divide by the hourly rate. Working: 20h = 115 − 35 = 80; h = 80 ÷ 20 = 4. Answer: 4 hours. 5.75 comes from dividing the whole £115 by £20 without first subtracting the fixed fee: 115 ÷ 20 = 5.75. 2.71 comes from swapping the fee and the rate round, subtracting £20 and dividing by £35: (115 − 20) ÷ 35 ≈ 2.71. 7.5 comes from adding the fixed fee instead of subtracting it: (115 + 35) ÷ 20 = 7.5.
- (a) 45% — Method: percentage increase = increase ÷ original amount × 100. Working: the increase is £116 − £80 = £36, and 36 ÷ 80 = 0.45, so 0.45 × 100 = 45%. Answer: 45%. The distractors: 36% comes from quoting the £36 increase as though pounds and per cent were the same thing; 31% comes from dividing the £36 increase by the new price £116 instead of by the original £80, which gives 31% to the nearest per cent; 145% is the new price written as a percentage of the original price, which is the whole of the new price rather than the increase.
- (a) isosceles trapezium — One pair of parallel sides, plus a separate pair of equal non-parallel sides, is exactly the definition of an isosceles trapezium — the shape the designer should draw. Parallelogram is wrong because a parallelogram needs BOTH pairs of opposite sides parallel, but only one pair is parallel here. Kite is wrong because a kite has two separate pairs of adjacent equal sides and no requirement for any sides to be parallel, a different combination of properties. Rhombus is wrong because a rhombus needs all four sides equal, but the description only makes two of the four sides equal to each other.
- (c) 9/25 — The frequency tree already shows the swim-and-cycle branch directly: 54 out of 150, which simplifies to 9/25. Adding both cycling branches together, 54 + 18 = 72, gives the total number of cyclists, so 72/150 = 12/25, not just those who also swim. Using the non-swimmers' cycling figure, 18, gives 18/150 = 3/25, the probability of cycling WITHOUT swimming. Using the swimmers' total of 90, before splitting by cycling, gives 90/150 = 3/5, the probability of swimming on its own.
- (c) 5/8 — Method: write the decimal over 1000 using its three decimal places, then simplify. Working: 0.625 = 625/1000 = 5/8 (dividing both numerator and denominator by 125). Answer: 5/8. 25/4 comes from writing the decimal over 100 instead of 1000, as if there were only two decimal places. 31/50 comes from rounding 0.625 to 0.62 before converting. 8/5 comes from simplifying correctly to 5/8 and then writing the fraction upside down.
- (d) 9 — Method: expand the brackets fully first, then collect the x-terms and constants before dividing. Working: 4(x − 3) = 4x − 12, so 4x − 12 = 2x + 6; 4x − 2x = 6 + 12; 2x = 18; x = 9. Answer: x = 9. 4.5 comes from expanding only the x-term in the bracket and forgetting to multiply the 3, giving 4x − 3 = 2x + 6, then 2x = 9, x = 4.5. −3 comes from a sign error when expanding, giving 4x + 12 = 2x + 6, then 2x = −6, x = −3. 3 comes from a sign error collecting the x-terms, adding instead of subtracting: 4x + 2x = 6 + 12, so 6x = 18, x = 3.
- (d) 60 km/h — Method: use the formula v = d ÷ t with the distance and time given. Working: 180 ÷ 3 = 60 km/h. So the average speed is 60 km/h. Distractor 540 km/h comes from multiplying the distance and time instead of dividing. Distractor 90 km/h comes from dividing by 2 instead of 3. Distractor 18 km/h comes from dividing by 10 instead of 3, a decimal-point slip.
- (a) 1/3 — Method: since OABC is a parallelogram, B = OA + OC = a + c. M = (1/2)c, since M is the midpoint of OC. Since AN is twice NC, N is 2/3 of the way along AC from A, so N = a + 2/3(c − a) = (1/3)a + (2/3)c. Working: MN = N − M = (1/3)a + (1/6)c, and MB = B − M = a + (1/2)c. Comparing term by term, 1/3 × (a + (1/2)c) = (1/3)a + (1/6)c, which matches MN exactly. Answer: k = 1/3, so M, N and B lie on a straight line. Giving 2/3 instead is the scalar linking N to B (NB = (2/3)MB), not M to N; giving 1/6 is just MN's c-coefficient read off on its own, without comparing it to MB's c-coefficient at all; and giving 3 is the scalar the wrong way up — it is MB that equals 3 × MN, not the other way round, since MN = k × MB was what was asked for. Always match the direction of the scalar to the vectors exactly as the question states them.
- (b) 3 and 4 — Method: the graph of f(x) is continuous, so where it crosses the x-axis the value of f(x) changes sign; substitute consecutive integers until one value is negative and the next is positive. Working: f(2) = 8 − 6 − 20 = −18, f(3) = 27 − 9 − 20 = −2 and f(4) = 64 − 12 − 20 = 32. The sign changes from negative to positive between x = 3 and x = 4, so the solution lies there. Answer: 3 and 4. The distractors: 2 and 3 comes from ignoring the −3x term and solving x³ = 20, whose root is 2.71, one interval to the left; 6 and 7 comes from reading x³ as x² and solving x² − 3x − 20 = 0, whose positive root is 6.22; 4 and 5 is the interval immediately after the change of sign, named by a candidate who finds f(4) positive and quotes the interval beginning there instead of the one across which the sign actually turned.
- (c) 40 cm — First find the real pitch length using Plan A's scale: 8 × 1000 = 8000 cm. Now find its length on Plan B using Plan B's scale: 8000 ÷ 200 = 40 cm. Assuming both plans use the same scale and leaving the length as 8 cm ignores that Plan B has a different scale. Using the ratio of the two scales upside down, 200 ÷ 1000 = 0.2, then 8 × 0.2 = 1.6, gives 1.6 cm — Plan B is drawn to a larger scale than Plan A, so lengths on it should be bigger, not smaller. Dividing by 2000 instead of 200 gives 4 cm, ten times too small.
- (a) (5, 7) — Method: a midpoint is the mean of the two end points, so for each coordinate (start + end) ÷ 2 = midpoint; rearranging that gives end = 2 × midpoint less the start. Working: for x, (1 + x) ÷ 2 = 3, so 1 + x = 6 and x = 5. For y, (3 + y) ÷ 2 = 5, so 3 + y = 10 and y = 7. B is therefore (5, 7). Answer: (5, 7). The distractors: (2, 2) comes from subtracting A from the midpoint, (3 − 1, 5 − 3), which gives the step from A to the midpoint and stops there instead of taking that same step a second time; (4, 8) comes from adding A to the midpoint, (3 + 1, 5 + 3), without doubling the midpoint first; (6, 10) comes from doubling the midpoint, (2 × 3, 2 × 5), and then forgetting to take A off.
- (b) 1215 — Method: generate the terms one at a time with the term-to-term rule and compare each with 1000 as you go, stopping at the first one that passes it. Working: the terms are 5, then 5 × 3 = 15, then 45, then 135, then 405, and 405 × 3 = 1215; 405 is still below 1000 while 1215 is above it. Answer: 1215. The distractors: 405 comes from stopping at the last term that is still below 1000 instead of giving the first one above it; 3645 comes from carrying on one term too far, past the first term that passes 1000; 2187 comes from using the multiplier 3 as the first term as well, generating 3, 9, 27, 81, 243, 729, 2187 instead of the sequence described.
- (d) 400 m — The distance travelled equals the area under the speed-time graph. The first 10 seconds form a triangle with base 10 and height 20, giving an area of 0.5 × 10 × 20 = 100 m. The next 15 seconds form a rectangle with base 15 and height 20, giving an area of 15 × 20 = 300 m. The total distance is 100 + 300 = 400 m. The option 500 m treats the whole 25 seconds as travelled at the constant 20 m/s, ignoring that the speed was building up during the first 10 seconds: 25 × 20 = 500. The option 300 m only counts the constant-speed section and forgets the triangle section entirely. The option 200 m comes from working out the triangle's area without halving it (10 × 20 = 200) and forgetting the rectangle altogether.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.