Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
CalculatorGCSE Higher
Answer key: GCSE Higher sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- (b) 14.5 ≤ l < 15.5 — A measurement given to the nearest metre could have been rounded from anywhere up to half a metre below or above it: 15 − 0.5 = 14.5 and 15 + 0.5 = 15.5. Every value from 14.5 up to (but not reaching) 15.5 rounds to 15, so the error interval is 14.5 ≤ l < 15.5, with the lower bound included and the upper bound excluded. Making both ends strict, 14.5 < l < 15.5, wrongly excludes 14.5 itself, even though 14.5 does round to 15. Making both ends inclusive, 14.5 ≤ l ≤ 15.5, wrongly includes 15.5, which actually rounds up to 16, not 15. Using a whole metre either side instead of half a metre, giving 14 ≤ l < 16, comes from forgetting that the error is only half the rounding unit.
- (c) 90° — The graph of y = tan x has a vertical asymptote at x = 90°, the smallest positive value for which it is undefined. tan 0° = 0, a defined value, not an undefined one — confusing where the graph equals zero with where it is undefined gives 0°. x = 270° is also a value where y = tan x is undefined, but it is not the smallest positive one, since 90° comes first. tan 45° = 1, a defined value — confusing the asymptote with the angle at which tan x = 1 gives 45°.
- (b) 12 days — This is inverse proportion: fewer painters take longer. Multiply the original numbers to find the total painter-days needed: 8 × 6 = 48 painter-days. Divide by the new number of painters: 48 ÷ 4 = 12 days. Working out 6 × 4 ÷ 8 = 3 days treats it as direct proportion, as if fewer painters needed less time. Stopping at 48 gives the total painter-days, not the number of days. Working out 6 + (8 − 4) = 10 days adds the change in the number of painters straight onto the number of days, treating painters and days as the same kind of quantity. 4 painters take 12 days.
- (d) 14.9 cm — By the sine rule, sin(BAC) ÷ BC = sin(ACB) ÷ AB, so sin(BAC) = 7 × sin35° ÷ 10 = 0.4015. This gives angle BAC = 23.7° or angle BAC = 156.3°; since angle BAC is acute, angle BAC = 23.7°. Angle ABC = 180° − 35° − 23.7° = 121.3°. By the sine rule again, AC ÷ sin(ABC) = AB ÷ sin(ACB), so AC = 10 × sin121.3° ÷ sin35° = 14.9 cm. Using angle BAC in the final step instead of angle ABC gives AC = 10 × sin23.7° ÷ sin35° = 7.0 cm — this just recomputes the given side BC. Using angle ACB again in the final step, instead of the newly found angle ABC, gives AC = 10 × sin35° ÷ sin35° = 10.0 cm — this just returns AB unchanged. Making a sign slip when finding angle ABC, computing 180° − 35° + 23.7° = 168.7° instead of subtracting it, and carrying that through gives AC = 10 × sin168.7° ÷ sin35° = 3.4 cm. Find angle BAC, then angle ABC, then apply the sine rule once more, and AC comes to 14.9 cm.
- (d) 5/12 — The possible totals are 2 to 12. The prime totals are 2, 3, 5, 7 and 11, with 1, 2, 4, 6 and 2 ways to make them, giving 1 + 2 + 4 + 6 + 2 = 15 outcomes out of 36, so the probability is 15/36 = 5/12. Choosing 7/18 comes from forgetting that a total of 2 counts as prime, giving 14/36 = 7/18 instead. Choosing 19/36 comes from wrongly including a total of 9 as a prime number, adding its 4 ways to the correct 15 to get 19/36. Choosing 13/36 comes from forgetting the 2 ways of making a total of 11, giving 13/36 instead of 15/36.
- (c) 40 minutes — Method: for grouped data, estimate the mean using the midpoint of each class — multiply each midpoint by its frequency, add the results, then divide by the total frequency. Working: the midpoints are 10, 30, 50 and 70 minutes. 10 × 5 = 50. 30 × 10 = 300. 50 × 10 = 500. 70 × 5 = 350. Σfx = 50 + 300 + 500 + 350 = 1200. Σf = 5 + 10 + 10 + 5 = 30. Estimated mean = 1200 ÷ 30 = 40 minutes. Using the upper boundary of each class instead of the midpoint — 20 × 5 = 100, 40 × 10 = 400, 60 × 10 = 600, 80 × 5 = 400 — gives a total of 1500 and an estimate of 1500 ÷ 30 = 50 minutes, too high because a boundary is not the middle of the class. Averaging the frequencies themselves, 5, 10, 10 and 5, ignores the times altogether and gives 7.5. Stopping after Σfx = 1200 without dividing by the total frequency gives a number far too large to be a time in minutes. Always find the midpoint of each class before multiplying by the frequency, and always divide by Σf at the end.
- (a) 30 cm — The tile's side length must be a common factor of 90 and 120. The factors of 90 include 1, 2, 3, 5, 6, 9, 10, 15, 18, 30, 45, 90; the factors of 120 include 1, 2, 3, 4, 5, 6, 8, 10, 12, 15, 20, 24, 30, 40, 60, 120. The highest number common to both lists is 30, so the largest square tile has a side length of 30 cm. Picking 15 cm, a common factor but not the largest, gives tiles that are smaller than necessary. Picking 10 cm, also a common factor but smaller still, wastes even more of the possible tile size. Working out the lowest common multiple instead of the highest common factor gives 360 cm, a length far bigger than either side of the patio. So the largest square tile Ben can use has a side length of 30 cm.
- (d) x = 5 — Method: expand the bracket by multiplying both terms inside it by 5, then undo the addition and the multiplication in turn. Working: expanding gives 5x + 15 = 40; subtracting 15 from both sides gives 5x = 25; dividing both sides by 5 gives x = 5. Answer: x = 5. The distractors: x = 8 comes from dividing both sides by 5 first, reaching x + 3 = 8 and writing 8 as the value of x without taking the 3 away; x = 11 comes from adding 15 to both sides instead of subtracting it, giving 5x = 55; x = 7.4 comes from expanding 5(x + 3) as 5x + 3, multiplying only the x by the 5, which leads to 5x = 37.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (b) No — the angle given is not the included angle — Method: check whether the given angle sits between the two given sides, since SAS requires the included angle. Working: sides AB and BC meet at vertex B, so the angle between them is angle B — but the angle given is angle A, which is not between the two given sides, and the same mismatch happens in triangle DEF. Options: 'two sides and one angle match' restates SAS's ingredients without checking their positions, which is exactly Meera's mistake; 'SSS needs three equal sides' is a true fact about a different condition, but it is not the reason Meera is wrong here; 'SAS allows any equal angle' states a rule that is not how SAS works, since the angle must be the included one. Answer: no, the angle given is not the included angle.
- (d) 15/64 — Method: because the first marble is put back, the second draw is made from the same 8 marbles, so the two draws are independent and their probabilities are multiplied. Working: the bag holds 8 marbles both times, so yellow first has probability 5/8 and blue second has probability 3/8. Multiplying fractions gives 5 × 3 = 15 on the top and 8 × 8 = 64 on the bottom. Answer: the probability is 15/64. The distractors: 9/64 comes from working out the probability that BOTH marbles are blue, 3/8 × 3/8, instead of one of each colour in the stated order; 15/16 comes from multiplying the numerators but adding the denominators; 5/8 comes from writing down the first draw only and never combining it with the second.
- (a) 13 °C — Method: subtract the lowest temperature from the highest temperature to find the difference. Working: the highest temperature is 6 °C and the lowest is −7 °C. Difference = 6 − (−7) = 6 + 7 = 13. Answer: 13 °C. 8 °C comes from using −2 °C as the lowest temperature instead of −7 °C: 6 − (−2) = 8. 5 °C comes from finding the difference between the two negative temperatures instead of the highest and lowest: −2 − (−7) = 5. −1 °C comes from adding the highest and lowest temperatures instead of subtracting: 6 + (−7) = −1.
- (d) 6.0 — Subtract 1.8 from both sides: 6.3x ≤ 38.2. Divide both sides by 6.3: x ≤ 6.0634… . The question asks for the greatest value to 1 decimal place that still satisfies the inequality. Testing 6.1: 6.3 × 6.1 + 1.8 = 40.23, which is more than 40, so 6.1 fails. Testing 6.0: 6.3 × 6.0 + 1.8 = 39.6, which is no more than 40, so 6.0 works and is the greatest such value. A candidate who simply rounds 6.0634… to 1 decimal place answers 6.1, without checking that it satisfies the inequality. A candidate who adds 1.8 instead of subtracting works out 41.8 ÷ 6.3 and answers 6.6. A candidate who forgets the 1.8 altogether divides 40 by 6.3 and answers 6.3.
- (d) 5:3:2 — German = 100% − 50% − 30% = 20%. The ratio 50 : 30 : 20 simplifies by dividing every part by 10 to give 5 : 3 : 2.
- (b) (1/2)b − (1/2)a — Method: MN runs from M to N, so MN = ON − OM, with OM = (1/2)a and ON = (1/2)b. Working: MN = (1/2)b − (1/2)a. Answer: MN = (1/2)b − (1/2)a. Subtracting the other way round gives (1/2)a − (1/2)b, the reverse vector from N to M; subtracting the wrong way round AND forgetting to halve gives a − b, which is BA, not MN; and adding the two halved vectors instead of subtracting them gives (1/2)a + (1/2)b, which is the position vector of the midpoint of AB. Always subtract the START point's vector from the END point's vector, and halve OA and OB before you combine them, not after.
- (b) One turning point. — Every quadratic graph, one with an x² term and no higher power of x, has exactly one turning point, since it is a single U-shaped or n-shaped curve. Saying two turning points describes a cubic graph, which can rise, turn, then turn again. Saying no turning points describes a straight line, which has none. Saying four turning points greatly overestimates how many times a simple quadratic curve changes direction — that would need a much higher power of x.
- (a) 15 cm — Take the square root of each part of the area ratio to find the length ratio: the square root of 4 is 2 and the square root of 25 is 5, giving a length ratio of 2 : 5. Multiply the smaller flag's height by the scale factor 5 ÷ 2 = 2.5: 6 × 2.5 = 15, so the larger flag is 15 cm tall. Giving 37.5 cm uses the area ratio, 25 ÷ 4 = 6.25, directly as the scale factor without square-rooting it first (6 × 6.25 = 37.5). Giving 2.4 cm applies the length ratio the wrong way round, scaling the smaller flag down by 2 ÷ 5 instead of up by 5 ÷ 2 (6 × 0.4 = 2.4). Giving 27 cm adds the difference between the two area-ratio numbers, 25 − 4 = 21, onto the smaller height instead of using it as a scale factor (6 + 21 = 27).
- (a) 225 — Method: find the interior angle of the regular octagon, then subtract it from 360° to find the reflex angle at the same vertex, since the interior angle and the reflex angle together make a full turn. Working: there are 8 − 2 = 6 triangles' worth of angle in the octagon, so the interior angle = 6 × 180 ÷ 8 = 135; reflex angle = 360 − 135 = 225. Answer: 225°. A candidate who stops after finding the interior angle gives 135. A candidate who works out the exterior angle instead, 360 ÷ 8 = 45, gives 45. A candidate who subtracts the exterior angle from 360° instead of the interior angle, working out 360 − 45, gets 315.
- (a) 23 — The number of logs increases by 4 for each layer down, starting from 3 in the top layer, so the nth layer has 3+(n−1)×4 logs. For the 6th layer: 3+5×4=3+20=23. A candidate who adds the difference of 4 six times instead of five, treating the top layer as needing an addition too, would compute 3+6×4=27. A candidate who uses 4n instead of 4n−1, omitting the adjustment for the first layer, would compute 4×6=24. A candidate who subtracts the common difference, 4, instead of 1 when adjusting the multiplier would compute 4×6−4=20.
- (c) 26.6 — h² = 1.6² = 2.56, so B = 68 ÷ 2.56 = 26.5625, which rounds to 26.6 (1 d.p.). A candidate who forgets to square the height gets 68 ÷ 1.6 = 42.5. A candidate who squares the mass instead of the height gets 68² ÷ 1.6 = 2890.0. A candidate who truncates 26.5625 instead of rounding it gets 26.5.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.