Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
CalculatorGCSE Higher
Answer key: GCSE Higher sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- (c) 1,000 m² — Method: round each length to 1 significant figure, then use area of a rectangle = length × width on the rounded lengths. Working: 19.6 m rounds to 20 m and 48.3 m rounds to 50 m, so the estimate is 20 × 50 = 1,000 and the area is about 1,000 m². Answer: 1,000 m². The distractors: 800 m² comes from rounding 48.3 down to 40 when the digit after its first significant figure is 8 and sends it up to 50, giving 20 × 40 = 800; 140 m² is the perimeter of the rounded rectangle, 2 × 20 + 2 × 50 = 140, not its area; 70 m² comes from adding the rounded lengths, 20 + 50 = 70, instead of multiplying them.
- (d) 110 — Method: form the equation 15 + 0.08m = 23.80, where m is the number of minutes, then solve for m. Working: subtract the fixed fee: 0.08m = 23.80 − 15 = 8.80. Divide by the cost per minute: m = 8.80 ÷ 0.08 = 110. Answer: 110 minutes. 1.1 comes from using 8 instead of 0.08 as the cost per minute, forgetting to convert pence to pounds. 297.5 comes from dividing the whole bill by the cost per minute without subtracting the fixed fee first, 23.80 ÷ 0.08. 485 comes from adding the fixed fee to the bill instead of subtracting it, before dividing by the cost per minute, (23.80 + 15) ÷ 0.08.
- (a) 8 cm — Method: a scale of 1 : n means the real distance is n times the distance on the map, so to go from the real distance back to the map distance, put both lengths in the same unit and then divide by the scale. Working: 1 km = 100 000 cm, so 8 km = 8 × 100 000 = 800 000 cm; 800 000 ÷ 100 000 = 8. Answer: 8 cm. The distractors: 800000 cm comes from converting the 8 km into centimetres and stopping there, so the division by the scale — the inverse operation the question asks for — is never done; 80 cm comes from taking a metre to be 1000 cm, which turns 8 km into 8 × 1000 × 1000 = 8 000 000 cm and gives 8 000 000 ÷ 100 000 = 80; 0.08 cm comes from taking a kilometre to be 1000 cm, which turns 8 km into 8000 cm and gives 8000 ÷ 100 000 = 0.08.
- (c) A↔N, B↔L, C↔M (ABC≅NLM) — Matching equal side lengths: AB (8 cm) equals NL (8 cm), BC (10 cm) equals LM (10 cm), and CA (6 cm) equals MN (6 cm). This gives the correspondence A with N, B with L, and C with M, so triangle ABC is congruent to triangle NLM, making 'A↔N, B↔L, C↔M (ABC≅NLM)' correct. 'A↔L, B↔M, C↔N (ABC≅LMN)' simply matches the vertices in the order they are written without checking the side lengths: AB (8 cm) would need to equal LM (10 cm), which is false. 'A↔M, B↔N, C↔L (ABC≅MNL)' also fails this check, since AB (8 cm) would need to equal MN (6 cm), which is false. 'A↔N, B↔M, C↔L (ABC≅NML)' gets A correct but swaps B and C, so AB (8 cm) would need to equal NM (6 cm), which is also false.
- (c) 0.04 — Method: 'made by machine B and faulty' is the second branch of a tree followed after the first, so multiply the probability of machine B by the probability of a fault given machine B. Working: machine B makes 0.4 of the bolts, and 0.1 of those bolts are faulty, so the probability is 0.4 × 0.1 = 0.04. Answer: the probability is 0.04. The distractors: 0.5 comes from adding 0.4 and 0.1 instead of multiplying, treating two stages of one journey as two separate outcomes; 0.1 gives the fault rate for machine B on its own, as though every bolt in the factory came from machine B, so the 40% share is never used; 0.07 is 0.6 × 0.05 added to 0.4 × 0.1, the probability that a bolt is faulty whichever machine made it, which answers a question about all the production rather than about machine B.
- (d) 45 — Method: a cumulative frequency is a running total — it counts everybody in every class up to and including the one that ends at the value given. Working: the classes that lie wholly below 30 minutes are 0 ≤ t < 10, 10 ≤ t < 20 and 20 ≤ t < 30, with frequencies 6, 14 and 25, so the running total is 6 + 14 = 20 and then 20 + 25 = 45. Answer: 45 people took less than 30 minutes. The distractors: 25 comes from quoting the frequency of the class 20 ≤ t < 30 on its own instead of the running total; 65 comes from accumulating one class too many and including 30 ≤ t < 40, which is 45 + 20; 35 comes from accumulating from the top downwards, 15 + 20, which counts the people who took 30 minutes or more rather than fewer.
- (b) 5.2 × 10⁶ — Method: write the digits as a coefficient that is at least 1 and less than 10, then count the places the decimal point moves to reach that position. Working: the digits give a coefficient of 5.2, and the decimal point travels from the end of 5,200,000 until it sits between the 5 and the 2, a move of 6 places. Answer: 5.2 × 10⁶. The distractors: 52 × 10⁵ is the same amount but not in standard form, because 52 is not less than 10; 5.2 × 10⁵ comes from counting the five zeros in 5,200,000 rather than the six places the decimal point moves; 5.2 × 10⁻⁶ comes from making the index negative because the decimal point was carried to the left.
- (d) 400 m — The distance travelled equals the area under the speed-time graph. The first 10 seconds form a triangle with base 10 and height 20, giving an area of 0.5 × 10 × 20 = 100 m. The next 15 seconds form a rectangle with base 15 and height 20, giving an area of 15 × 20 = 300 m. The total distance is 100 + 300 = 400 m. The option 500 m treats the whole 25 seconds as travelled at the constant 20 m/s, ignoring that the speed was building up during the first 10 seconds: 25 × 20 = 500. The option 300 m only counts the constant-speed section and forgets the triangle section entirely. The option 200 m comes from working out the triangle's area without halving it (10 × 20 = 200) and forgetting the rectangle altogether.
- (d) 13/10 — First find the selling price: £150 + £45 = £195. Put the selling price over the cost price: 195/150. Divide both numbers by their highest common factor, 15: 195÷15 = 13, 150÷15 = 10, giving 13/10. (10/13 comes from writing the prices the wrong way round. 3/10 is just the profit written as a fraction of the cost price, 45/150, not the selling price. 13/23 comes from comparing the selling price to the combined total of the cost price and the selling price, 195/345.)
- (c) 1.44 m³ — The cross-section is a triangle, so its area = base × height ÷ 2. Base × height = 1.2 × 0.8 = 0.96 m², and half of that is 0.96 ÷ 2 = 0.48 m². The volume of the prism = cross-sectional area × length = 0.48 × 3 = 1.44 m³. A pupil who forgets to halve when finding the triangle's area gets 1.2 × 0.8 × 3 = 2.88 m³. A pupil who ignores the height altogether, treating the cross-section as base × length, gets 1.2 × 3 = 3.6 m³. A pupil who correctly finds the cross-sectional area but forgets to multiply by the length of the bed stops at 0.48 m³. The correct volume of soil is 1.44 m³.
- (c) 3/20 — Method: the second fraction is quoted for the perennials only, so it is a conditional probability and the two fractions multiply. Working: the probability that a plant is a perennial is 3/5, and given that it is a perennial the probability that it is in flower is 1/4. Multiplying gives 3 × 1 over 5 × 4, which is 3/20. Answer: the probability is 3/20. The distractors: 17/20 comes from adding the fractions, 12/20 plus 5/20, instead of multiplying, which would be right only for two outcomes that cannot both happen; 4/9 comes from adding the numerators and the denominators separately, the classic 3 + 1 over 5 + 4; 1/4 quotes the flowering fraction on its own, as though every plant in the garden centre were a perennial, so the 3/5 is never used.
- (d) 3√5 — Split 45 into a perfect square times a factor: 45 = 9 × 5. Take the square root of each part separately: √45 = √9 × √5 = 3√5, since √9 = 3. Writing the perfect-square factor itself (9) as the coefficient instead of its root would give 9√5 — that trap comes from forgetting the last step, rooting 9. Multiplying 3 and 5 together instead of keeping them as coefficient and radicand gives 15, which throws away the surd entirely. Doubling the correct coefficient by mistake gives 6√5.
- (a) 1.36 — Method: put the starting value into the right-hand side to get x₁, feed that value back in to get x₂, and round only once the second value has been found. Working: x₁ = 5 ÷ (1 + 2) = 5 ÷ 3 = 1.66666…; x₂ = 5 ÷ (1.66666… + 2) = 5 ÷ 3.66666… = 1.36363…. The digit in the third decimal place is 3, so x₂ = 1.36 correct to 2 decimal places. Answer: 1.36. The distractors: 1.67 is x₁, the value after a single use of the formula, given by a candidate who counts the starting value itself as x₁; 1.49 is x₃ = 1.48648…, one use of the formula too many; 1.37 comes from writing x₁ down as 1.66, truncating the display instead of keeping it in full, and then working out 5 ÷ 3.66 = 1.36612…, which rounds up to 1.37.
- (b) 20 km — The scale 2 cm : 5 km means each 1 cm on the map represents 5 ÷ 2 = 2.5 km in real life. The footpath is 8 cm on the map, so its real length is 8 × 2.5 = 20 km. 40 km comes from multiplying 8 by 5 directly, ignoring that the scale's '2 cm' has to be divided out first: 8 × 5 = 40. 3.2 km comes from dividing 8 by 2.5 instead of multiplying: 8 ÷ 2.5 = 3.2. 5 km comes from multiplying 2.5 by the scale's '2' instead of by the footpath's 8 cm: 2.5 × 2 = 5.
- (c) Swapped the x and y components — The student's vector has the same two numbers, 5 and −2, but in swapped positions, so the error is swapping the x and y components rather than an error with signs or size. 'Reversed both signs' is wrong because the numbers 5 and −2 have not changed sign, only position. 'Reversed only the y sign' is wrong for the same reason — no sign has actually changed. 'Doubled the x component' is wrong because neither number has changed in size.
- (b) 4x − 4 = 20 — Method: subtract 2x from both sides of the equation, and simplify each side separately. Working: left side: 6x − 4 − 2x = 4x − 4. Right side: 2x + 20 − 2x = 20. Answer: 4x − 4 = 20. 4x = 20 drops the −4 from the left side, as though subtracting 2x also removes the constant term. 8x − 4 = 20 comes from moving the 2x across to the left without changing its sign: it is taken off the right side correctly, leaving 20, but added to the left side instead of subtracted, giving 6x + 2x = 8x. 4x − 4 = 2x + 20 comes from subtracting 2x from the left-hand side only and leaving the right-hand side unchanged; whatever is done to one side must be done to the other.
- (c) 3 — Method: find the height scale factor, cube it to find the volume (and coverage) scale factor, use it to find one large sack's coverage, then divide the total lawn area by this and round up to a whole number of sacks. Working: height scale factor = 40 ÷ 20 = 2, so coverage scale factor = 2³ = 8, and each large sack covers 30 × 8 = 240 m². 500 ÷ 240 = 2.08…, which rounds UP to 3 whole sacks. Answer: 3. 2 comes from correctly finding that each large sack covers 240 m², but then rounding 500 ÷ 240 down instead of up, which would leave part of the lawn untreated. 5 comes from squaring the height scale factor (2² = 4) instead of cubing it, giving a coverage of only 30 × 4 = 120 m² per sack. 17 comes from forgetting to scale the coverage at all and dividing 500 by the smaller sack's coverage of 30 m².
- (c) 9.9 cm — Method: the 7 cm side is opposite the 45° angle and the hypotenuse is wanted, so use sin θ = opposite ÷ hypotenuse and rearrange it for the hypotenuse. Working: sin 45° = 7 ÷ h, so h = 7 ÷ sin 45° = 9.899…, which is 9.9 to 1 decimal place. Answer: 9.9 cm. The distractors: 5.0 cm comes from multiplying by sin 45° instead of dividing by it; 14.0 cm comes from doubling the 7 cm side, which is the rule for a side opposite 30° and not one opposite 45°; 7.0 cm comes from reading the two equal sides of a 45° right-angled triangle as including the hypotenuse, when the equal pair is the two shorter sides.
- (c) 1 — At x = 0, f(0) = 4. Applying the transformations in order — reflect in the x-axis first, then translate up by 5 — gives −f(0) + 5 = −4 + 5 = 1. Applying the translation but forgetting the reflection gives f(0) + 5 = 9. Applying the reflection to the whole expression, including the +5, gives −f(0) − 5 = −9. Applying the reflection but forgetting the translation gives −f(0) = −4.
- (d) The roots of x² − 6x + 5 = 0 are x = 1 and x = 5 (since it factorises to (x − 1)(x − 5)), so by symmetry the turning point has x-coordinate 3, not 6. — Factorising, x² − 6x + 5 = (x − 1)(x − 5), so the roots are x = 1 and x = 5. The turning point lies midway between the roots by symmetry: (1 + 5) ÷ 2 = 3. The coefficient of x has no direct role in locating the turning point this way. The option giving −6 makes an arbitrary sign change with no mathematical basis. The option giving 5 wrongly takes just one of the two roots instead of their midpoint.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.