Sample paper · GCSE Higher · grades 4–9
GCSE Higher sample Paper 2 (calculator)
The real Paper 2 is 1.5 hour 30 minutes and 80 marks, calculator, and all three papers carry equal weight. This sample is 20 original questions in the same content proportions as the Higher qualification — number 15%, algebra 30%, ratio, proportion and rates of change 20%, geometry and measures 20%, probability 7.5%, statistics 7.5% — with a calculator allowed. AO1 / AO2 / AO3 at this tier: 40% / 30% / 30%.
CalculatorGCSE Higher
Answer key: GCSE Higher sample Paper 2 (calculator)
MathsUKwww.geekhero.co.uk
- (d) 4 13/15 — Convert to fifteenths: 1/5 is equivalent to 3/15 (multiply by 3/3), and 2/3 is equivalent to 10/15 (multiply by 5/5), so 3 1/5 is equivalent to 3 3/15 and 1 2/3 is equivalent to 1 10/15. Add the whole numbers (3 + 1 = 4) and the fractions (3/15 + 10/15 = 13/15), giving 4 13/15. A candidate who adds the numerators and denominators straight across, treating 1/5 + 2/3 as (1+2)/(5+3), gets a fraction part of 3/8, giving 4 3/8. A candidate who adds the fraction parts correctly but forgets to add the second whole number gets 3 13/15. A candidate who adds the whole numbers but copies the first fraction across without ever adding 2/3 to it gets 4 1/5.
- (a) 33 — Substitute n=4 into 2n²+1: 2×4²+1=2×16+1=33. A candidate who computes n² as 2×n instead of n×n would compute 2×(2×4)+1=2×8+1=17. A candidate who correctly finds 2×16 but forgets to add the constant 1 would stop at 32. A candidate who squares the whole term 2n, rather than squaring n before multiplying by 2, would compute (2×4)²+1=64+1=65.
- (b) Provider Y — £21.00 against Provider X's £23.00 — Provider X's gradient is (35 − 15) ÷ 100 = 0.2, so cost = 15 + 0.2 × 40 = 15 + 8 = £23.00. Provider Y's gradient is (45 − 5) ÷ 100 = 0.4, so cost = 5 + 0.4 × 40 = 5 + 16 = £21.00. £21.00 is less than £23.00, so Provider Y is cheaper: 'Provider Y — £21.00 against Provider X's £23.00'. Getting both costs right but naming Provider X as cheaper compares the two numbers the wrong way round — £23.00 is more than £21.00, not less. Comparing only the fixed fees, £15.00 and £5.00, ignores the cost of the 40 gigabytes actually used. Reading off the costs at 100 gigabytes, £35.00 and £45.00, directly from the graph answers a different usage from the 40 gigabytes the question asks about.
- (d) 15 cm² — Method: identify the length that is common to both views, since it is the box's length; then read off the width from the plan view and the height from the front elevation, and multiply those two measurements to find the area of the side elevation. Working: both rectangles share a side of 8 cm, which is the box's length; the plan view's other side gives a width of 5 cm, and the front elevation's other side gives a height of 3 cm. The side elevation is bounded by the width and the height: 5 cm × 3 cm = 15 cm². Answer: 15 cm². The distractors: 24 cm² comes from giving the area of the front elevation shown (8 cm × 3 cm) instead of working out a new rectangle for the side elevation. 40 cm² comes from giving the area of the plan view shown (8 cm × 5 cm) instead of working out the side elevation. 120 cm² comes from multiplying all three measurements together (8 cm × 5 cm × 3 cm), finding the volume of the box instead of the area of one face.
- (b) 50% — The total number of customers who bought a cake is 54 + 21 = 75, combining both hot-drink and non-hot-drink customers. As a percentage of all 150 customers, this is (75 ÷ 150) × 100 = 50%. Choosing 36% comes from only counting the hot-drink customers who bought a cake, (54 ÷ 150) × 100 = 36%, and forgetting the 21 non-hot-drink customers who also bought a cake. Choosing 14% comes from only counting the non-hot-drink customers who bought a cake, (21 ÷ 150) × 100 = 14%, and forgetting the 54 hot-drink customers who also bought a cake. Choosing 60% comes from dividing by the hot-drink total of 90 instead of the grand total of 150, (54 ÷ 90) × 100 = 60%.
- (d) 45 — Method: convert the angle into a fraction of the full circle, 360°, then apply that fraction to the total number of shoppers. Working: the card sector is 90° out of 360°, a fraction of 90 ÷ 360 = 0.25. Applying that fraction to the 180 shoppers gives 0.25 × 180 = 45 shoppers. Giving 90 states the angle itself, not a number of shoppers — the angle first has to be converted into a fraction. Using the remaining angle, 360 − 90 = 270°, and scaling that, 270 ÷ 360 × 180 = 135, finds the number who did NOT pay by card, not the number who did. Dividing 360 by 90, 360 ÷ 90 = 4, finds how many equal 90° sectors fit in the circle, a fact about the pie chart's shape, not about the shoppers at all. Always convert the angle to a fraction of 360° first, and apply that same fraction to the total number of people.
- (b) 1 — Method: BIDMAS deals with the index before the subtraction, and a negative number multiplied by itself gives a positive result. Working: (−2)² = (−2) × (−2) = 4, so the calculation becomes 4 − 3 = 1. Answer: 1. The distractors: −7 comes from squaring only the 2 and leaving the minus sign outside the index, giving −(2²) − 3 = −4 − 3 = −7; −1 comes from subtracting the square from 3 instead of 3 from the square, giving 3 − 4 = −1; 25 comes from carrying out the subtraction before the index, giving (−2 − 3)² = (−5)² = 25.
- (c) 26.6 — h² = 1.6² = 2.56, so B = 68 ÷ 2.56 = 26.5625, which rounds to 26.6 (1 d.p.). A candidate who forgets to square the height gets 68 ÷ 1.6 = 42.5. A candidate who squares the mass instead of the height gets 68² ÷ 1.6 = 2890.0. A candidate who truncates 26.5625 instead of rounding it gets 26.5.
- (a) 18/25 — First find the new number of rose bushes: 90 × 1.2 = 108 (a 20% increase multiplies by 1.2). Then write 108 over 150 and divide top and bottom by 6 to get 18/25. Choosing 3/5 comes from using the original 90 rose bushes without applying the 20% increase (90/150 = 3/5). Choosing 25/18 comes from writing the number of lavender bushes over the new number of rose bushes, the wrong way round. Choosing 3/25 comes from multiplying 90 by 0.2 instead of 1.2, finding only the increase (18) rather than the new total, then writing 18/150 = 3/25.
- (d) 12 cm — Since DE is parallel to BC, triangle ADE is similar to triangle ABC (the two triangles share angle A, and the parallel lines make the angles at D and E equal to the angles at B and C). The whole side AB = AD + DB = 3 + 6 = 9 cm. The scale factor from the small triangle to the large triangle is AB ÷ AD = 9 ÷ 3 = 3, so BC = DE × 3 = 4 × 3 = 12 cm. Scaling by DB ÷ AD instead of AB ÷ AD gives 4 × (6 ÷ 3) = 8 cm. Adding DB directly onto DE, instead of scaling, gives 4 + 6 = 10 cm. Treating the triangles as congruent rather than similar, so assuming corresponding sides are simply equal, gives BC = DE = 4 cm.
- (a) 70 — Method: two linked steps. Find the expected number of billing calls first, then take the 35% of those, because the 35% is quoted for billing calls only. Working: 40% of 500 is 200 billing calls. 35% of 200 is 70 calls. Answer: you would expect 70 calls. The distractors: 200 stops after the first step and gives the billing calls, forgetting that only some of them are dealt with quickly; 175 is 35% of 500, applying the quick response rate to every call the centre takes rather than to the billing calls only; 375 comes from adding 40% and 35% to get 75% and taking 75% of 500, which treats two stages of one journey as separate outcomes to be added.
- (a) 300 N/m² — Pressure is force ÷ area, and the unit N/m² says so: newtons divided by square metres. The calculation is 240 ÷ 0.8. Multiplying both numbers by 10 clears the decimal: 2400 ÷ 8 = 300 N/m². 192 N/m² multiplies the force by the area instead of dividing, 30 N/m² divides by 8 and so loses the decimal point, and 3000 N/m² multiplies only the force by 10 when clearing the decimal.
- (c) The sequence diverges, moving away from x = 3 — Starting from x₀ = 2.9: x₁ = 2.9² − 6 = 2.41, x₂ = 2.41² − 6 = −0.19, x₃ = (−0.19)² − 6 = −5.96, x₄ = (−5.96)² − 6 = 29.56 — the values swing away from 3 and grow rapidly, so the sequence diverges rather than settling anywhere. Choosing 'settles towards x = 3' assumes that starting close to a root is enough for a rearrangement to converge to it, which is not always true — this rearrangement changes values too steeply near x = 3 to stay there. Choosing 'settles towards x = −2' assumes a diverging sequence must eventually land on the other root; instead it runs away to increasingly large values. Choosing 'stays constant at 2.9' ignores that applying the formula changes the value at every step.
- (d) 25% — Method: percentage decrease = decrease ÷ original amount × 100. Working: the reduction is £60 − £45 = £15, and 15 ÷ 60 = 0.25, so 0.25 × 100 = 25%. Answer: 25%. The distractors: 15% comes from quoting the £15 reduction as though pounds and per cent were the same thing; 33% comes from dividing the £15 by the new price £45 instead of by the original £60, which gives 33% to the nearest per cent; 75% is the new price written as a percentage of the old one, which is what is still paid rather than what has been taken off.
- (d) 8.8 — Method: substitute into the cosine rule BC² = AB² + AC² − 2 × AB × AC × cos(BAC) and solve the resulting quadratic in x, keeping only the positive root. Working: 15² = x² + (x + 2)² − 2x(x + 2) cos 100°, which expands to a quadratic with two roots, x = 8.8 and x = −10.8; since x is a length, x = 8.8. Expanding (x + 2)² as x² + 4 instead of x² + 4x + 4, missing the middle term, gives x = 9.6; using +2x(x + 2) cos 100° instead of −2x(x + 2) cos 100° (a sign error on the cosine term) gives x = 10.6; and reporting the size of the rejected negative root instead of discarding it gives x = 10.8. Always expand a squared bracket fully before collecting terms.
- (c) 4(n + 3) — 'Add 3 to n' must happen before 'multiply the result by 4', so the addition needs brackets to show it happens first: 4(n + 3). Writing 4n + 3 multiplies n by 4 immediately and only adds the 3 afterwards, which reverses the order the words describe. Writing n + 3 × 4 only multiplies the 3 by 4, and adds n as a separate, unmultiplied term — it treats 'the result' as just the 3, not the whole of n + 3. Writing 3(n + 4) keeps the correct structure but swaps which number is added and which is multiplied. The expression for 'add 3 to n, then multiply the result by 4' is 4(n + 3).
- (b) 900 N/m² — Pressure = force ÷ area, so 45 ÷ 0.05 = 900 N/m². Working out 45 ÷ 5 = 9 misplaces the decimal point in the area, treating 0.05 m² as 5 m². Working out 45 × 0.05 = 2.25 multiplies force and area together instead of dividing. Working out 45 + 0.05 = 45.05 simply adds the two given numbers, which does not give a pressure at all. The pressure on the ground is 900 N/m².
- (a) £94.58 — Method: find the area with 1/2ab sin C, then multiply by the cost per square metre. Working: area = 1/2 × 1.8 × 1.3 × sin 72° = 1.11274 m², so cost = 1.11274 × £85 = £94.58. Leaving out the 1/2 gives an area of 2.22547 m² and a cost of £189.17; using cos 72° instead of sin 72° gives a cost of £30.73; and rounding the area to 1 decimal place (1.1 m²) before multiplying by the cost per square metre gives £93.50, which loses accuracy that the final answer needs. Even rounding to 1.113 m² is enough to shift the cost to £94.61 — keep the unrounded area in your calculator until the very last step.
- (c) x = 5, y = 5 — x² − 10x + 30 = (x − 5)² − 5² + 30 = (x − 5)² + 5. Substituting x = 5: 5² = 25, 10 × 5 = 50, so 25 − 50 + 30 = 5, confirming the minimum value 5 at x = 5: turning point (5, 5). Using −10 instead of half of it inside the bracket gives (x − 10)² − 70, turning point (10, −70) — wrong, because only half the coefficient of x belongs inside the bracket. Reading the bracket's sign directly as the turning point's x-coordinate gives (−5, 5) — wrong, because (x − 5)² is zero at x = 5, not x = −5. Computing 25 − 30 = −5 instead of 30 − 25 = 5 flips the sign of the constant, giving (5, −5) — wrong, since the completed square's constant must be evaluated as 30 minus 25, not 25 minus 30. Always check a turning point by substituting its x-value back into the original equation.
- (b) 2 < x < 6 — Factorise: x² − 8x + 12 = (x − 2)(x − 6), giving roots at x = 2 and x = 6. Since the coefficient of x² is positive, the graph is a U-shape that is negative, below the axis, between its roots. So P < 0 for 2 < x < 6. Distractor routes: x < 2 or x > 6 takes the region outside the roots, which is where P is positive, a profit, the opposite of a loss. 2 ≤ x ≤ 6 includes the endpoints, where P = 0 exactly, break-even rather than a loss, since the inequality is strict. −6 < x < −2 comes from factorising as (x + 2)(x + 6), reversing the sign of both roots.
How the 20 questions are shared out
- Number — 3 questions (15% of the qualification)
- Algebra — 6 questions (30% of the qualification)
- Ratio, proportion and rates of change — 4 questions (20% of the qualification)
- Geometry and measures — 4 questions (20% of the qualification)
- Probability — 2 questions (7.5% of the qualification)
- Statistics — 1 question (7.5% of the qualification)
Where an area has fewer printable questions than its share, the shortfall is filled from the other areas. These are original questions, not past papers.