Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.Solve the inequality 4x + 1 > 2x + 9.
- 2.Which of these points lies in the first quadrant?
- 3.In a sequence, each term is half the term before it. The sequence begins 100, 50, 25. Write down the next term.
- 4.Solve (3x + 2)/5 = (x + 4)/3
- 5.A straight line has equation 4y = 12x + 20. Work out the gradient of the line.y = 12x + 20
- 6.A charity's fundraising total, T pounds, over d days follows T = (d − 3)(30 − d) for 3 ≤ d ≤ 30, where T = 0 marks the start and end of the campaign. Work out how many days the campaign runs for, from start to end.
- 7.The formula for the profit, £P, made on an item is P = S − C, where S is the selling price and C is the cost price. Make S the subject of the formula.
- 8.A ferry's distance-time graph is a straight line from (0 minutes, 0 km) to (25 minutes, 15 km). Work out the ferry's speed in kilometres per hour.
- 9.Yusuf has £40 saved and adds £6 each week. His sister Aisha has £10 saved and adds £11 each week. After how many weeks will they have saved the same amount?
- 10.A number, n, is tripled and then 4.5 is added. The result is 22.5. Form an equation and solve it to find n.
- 11.The solution set of an inequality is x ≥ 7. Write down the value that does NOT satisfy this inequality.
- 12.A triangle has vertices at (1, 1), (1, 5) and (6, 1). Work out the area of the triangle.
- 13.A point lies on the y-axis. What can be said about the x-coordinate of that point?
- 14.A geometric sequence has first term 5, and each term after that is 3 times the term before it. Work out the first term of the sequence that is greater than 1000.
- 15.A plumber charges a £40 call-out fee plus £25 for each hour worked. The total charge, £C, for a job lasting h hours is given by C = 40 + 25h. Work out the charge for a job lasting 3 hours, and name what kind of statement C = 40 + 25h is.
Build your own mix at the worksheet builder.