Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.Work out the gradient of the straight line that passes through the points (−1, 5) and (3, −7).
- 2.A graph has equation y = x² − 6x + 5. A student says its turning point has x-coordinate 6, because that's the coefficient of x. Which statement corrects the student's mistake?y = x² − 6x + 5
- 3.A distance-time graph shows a car travelling at a constant speed, covering 90 km in 2 hours. Work out the car's speed in km/h.
- 4.Here are the first five terms of an arithmetic sequence: 2, 5, 8, 11, 14. Work out the 8th term.
- 5.The first five terms of a sequence are 2, 5, 8, 11, 14. Work out an expression, in terms of n, for the nth term.
- 6.A sequence has nth term 3n + 4. Two terms are missing from the list of its first five terms: 7, 10, _, 16, _. Work out the missing 3rd and 5th terms added together.
- 7.The first five terms of a quadratic sequence are 2, 5, 10, 17, 26. Work out the next term in the sequence.
- 8.An arithmetic sequence has first term 40 and common difference −6. Work out the 9th term of the sequence.
- 9.A straight line has equation y = 4x + 3. A second line is parallel to the first line and passes through the point (0, −5). Work out the equation of the second line.y = 4x + 3
- 10.A candle is 30 cm tall and burns down at a steady rate of 1 cm per hour. Write down the function for the height of the candle y, in centimetres, after x hours.
- 11.A tank already contains some water and is then filled at a constant rate. After 2 minutes it contains 50 litres in total; after 7 minutes it contains 150 litres in total. Work out the rate at which water is added, in litres per minute.
- 12.A plumber charges a call-out fee plus an hourly rate. The total cost, y in pounds, of a job lasting x hours is given by y = 45x + 60. Work out the total cost of a job that lasts 3 hours.y = 45x + 60
- 13.The nth term of a sequence is 3n + 2. Work out the 4th term of the sequence.
- 14.The line y = 3x + 6 meets the x-axis at one point. Work out the coordinates of that point.y = 3x + 6
- 15.Work out the equation of the straight line that passes through (−2, 3) and (4, −9).
Build your own mix at the worksheet builder.