Printable · GCSE Foundation · ages 14-16
Number worksheet — GCSE Foundation
Fifteen questions across the number statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Number worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (d) 60 mph — Average speed = distance ÷ time, with the time measured in hours. 45 minutes is 45/60 of an hour, which is 0.75 of an hour, so the journey takes 1.75 hours. Speed = 105 ÷ 1.75 = 60 mph. 52.5 mph rounds the time up to 2 hours, 72.4 mph writes 1 hour 45 minutes as 1.45 hours, and 183.75 mph multiplies the distance by the time instead of dividing.
- (a) £4.80 — The total cost of the melons is 8 × £1.35 = £10.80. Profit is the selling total minus the cost, so £15.60 − £10.80 = £4.80. Subtracting the price of just one melon from the selling total instead of the total cost of all eight, £15.60 − £1.35, gives £14.25. Miscalculating the cost of the melons as 8 × £1.30 = £10.40, dropping the 5p from each price, gives a profit of £15.60 − £10.40 = £5.20. Adding the selling total and the cost together instead of subtracting them, £15.60 + £10.80, gives £26.40.
- (a) 33.5 mph — Method: the smallest possible actual value is half the rounding unit below the given value. Working: half of 1 mph is 0.5 mph, so the smallest possible speed is 34 − 0.5 = 33.5 mph. Answer: 33.5 mph. (33 mph comes from subtracting the whole rounding unit, 1, instead of half of it. 34 mph comes from giving the rounded value itself rather than the lower bound. 34.5 mph comes from adding the half unit instead of subtracting it, giving the upper bound.)
- (b) 30 — Method: 12% of an amount is 12/100 of it, so find 1% by dividing by 100 and then multiply by 12. Working: 1% of 250 is 250 ÷ 100 = 2.5, and 12% is 2.5 × 12 = 30. Answer: 30 seats. The distractors: 3 comes from writing 12% as 0.012 instead of 0.12, giving 0.012 × 250 = 3; 25 comes from finding 10% of the seats and stopping there; 24 comes from counting 12 seats for each whole hundred, 12 + 12 = 24, and ignoring the remaining 50 seats.
- (d) 10 — Method: picking 3 flowers from 5 leaves 2 flowers behind, so counting the different pairs that could be left out counts the bunches, and those pairs can be listed systematically. Working: number the flowers 1 to 5; the first flower can be left out alongside any of the 4 flowers after it, the second alongside any of the 3 after it, the third alongside any of the 2 after it and the fourth alongside the last one, so the number of pairs left out is 4 + 3 + 2 + 1 = 10. Answer: 10. The distractors: 60 comes from working out 5 × 4 × 3 and treating the three picks as an ordered selection when the order does not matter; 30 comes from dividing that product by 2 instead of by the 6 orders in which three chosen flowers could have been picked; 15 comes from multiplying the 5 flowers by the 3 flowers picked instead of counting the selections.
- (a) 4,000 nanometres — Method: the number of nanometres is the diameter divided by the length of one nanometre, and dividing powers of ten means subtracting the indices. Working: −6 − (−9) = 3, so 10⁻⁶ ÷ 10⁻⁹ = 10³, and the diameter is 4 × 10³ nanometres. Answer: 4,000 nanometres. The distractors: 400 nanometres comes from taking the difference between the indices as 2 instead of 3; 4 nanometres comes from changing the name of the unit without converting, leaving the coefficient untouched; 0.004 nanometres comes from dividing by 10³ instead of multiplying by it, as though a nanometre were the larger of the two units.
- (b) 23 kg — Method: the rounded value sits exactly in the middle of the error interval. Working: the interval 22.5 ≤ m < 23.5 stretches 0.5 either side of the rounded value, so the rounded value is 23. Answer: 23 kg. (22 kg comes from rounding the lower bound down instead of finding the middle of the interval. 22.5 kg comes from giving the lower bound itself rather than the rounded value. 23.5 kg comes from giving the upper bound itself rather than the rounded value.)
- (c) 62.35 ≤ r < 62.45 — Method: with a value rounded to 1 decimal place, the error interval reaches half of 0.1 either side. Working: half of 0.1 is 0.05, so the interval runs from 62.4 − 0.05 to 62.4 + 0.05. Answer: 62.35 ≤ r < 62.45. (62 ≤ r < 63 comes from rounding to the nearest whole number instead of 1 decimal place. 62.35 ≤ r ≤ 62.45 comes from including the upper bound with ≤ instead of excluding it with <. 62.3 ≤ r < 62.5 comes from using 0.1 either side instead of half of it.)
- (b) £96.90 — Method: multiply the number of units by the cost per unit, then convert the result from pence to pounds. Working: 340 × 28.5p = 9690p; converting to pounds, 9690p ÷ 100 = £96.90. Answer: £96.90. £969.00 comes from misplacing the decimal point when converting pence to pounds, dividing by 10 instead of 100. £9.69 comes from misplacing the decimal point the other way, dividing by 1000 instead of 100. £102.00 comes from rounding the rate to 30p per unit before multiplying.
- (a) 7.2 × 10⁻⁴ — 0.00072 = 7.2 × 10⁻⁴, moving the decimal point 4 places to the right to reach 7.2, so the exponent is negative. Writing 7.2 × 10⁴ uses a positive exponent, which would give a number far larger than 1, not a small decimal. Writing 7.2 × 10⁻⁵ moves the point one place too many. Writing 0.72 × 10⁻³ leaves the coefficient below 1, which standard form does not allow.
- (b) £45.90 — The cost is 18 × £3.45 = £62.10. Profit = £108 − £62.10 = £45.90. A candidate who does not borrow in the tenths column, doing 1 − 0 = 1 instead of borrowing to make 10 − 1 = 9 and so leaving the units as 8 − 2 = 6, gets £46.10. A candidate who adds the cost to the selling price instead of subtracting gets £108 + £62.10 = £170.10. A candidate who gives the cost instead of the profit gets £62.10.
- (a) The tape can only give the length to the nearest centimetre — Method: a measurement should never be written to a finer degree of accuracy than the instrument used can read. Working: the tape is marked in centimetres, so the smallest division Leah can read is 1 cm, which is 0.01 m and two decimal places in metres; writing 7.3157 m claims the length to the nearest tenth of a millimetre, four decimal places, which the markings cannot support. A record of 7.32 m, to the nearest centimetre, is what this tape justifies. Answer: The tape can only give the length to the nearest centimetre. The distractors: the nearest millimetre contradicts the markings described in the question, which are centimetres, and would still claim more accuracy than the tape offers; the rule that a length in metres must be written to 2 decimal places borrows the habit of writing money to the penny, when the accuracy of a length depends on the instrument; rounding to the nearest metre would throw away accuracy the tape genuinely provides.
- (c) 3.05 kg — There are 1000 g in 1 kg, so 450 g = 450 ÷ 1000 = 0.45 kg. The total mass is 0.45 + 2.6 = 3.05 kg. 7.1 kg divides the grams by 100 instead of 1000, 2.645 kg divides them by 10 000, and 452.6 kg adds the two numbers without converting the grams at all.
- (c) 9π cm² — The area of a circle is π × r². With a radius of 3 cm this is π × 3² = 9π cm², and this is exact because π has not been replaced by any approximation. Writing 28.3 cm² replaces π with a rounded decimal value, 3.14, and then rounds the result again, so it is only an approximation. Writing 28.26 cm² uses π ≈ 3.14 without a final rounding step, but this is still only an approximation of 9π, not the exact value. Writing 27 cm² comes from replacing π with the rough approximation 3, which is even further from the true value.
- (b) 78 hours — From 10:00 on Monday to 10:00 on Thursday is exactly 3 complete days, which is 3 × 24 = 72 hours. From 10:00 to 16:00 on the Thursday is a further 6 hours, giving a total of 72 + 6 = 78 hours. Counting Monday to Thursday as 4 full calendar days instead of 3 complete 24-hour periods gives 4 × 24 = 96 hours. Undercounting the number of complete days as 2 instead of 3 gives 2 × 24 + 6 = 54 hours. Subtracting the extra 6 hours instead of adding them to the 3 complete days gives 72 − 6 = 66 hours.
Build your own mix at the worksheet builder.