Printable · GCSE Foundation · ages 14-16
Number worksheet — GCSE Foundation
Fifteen questions across the number statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Number worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) 8 litres per minute — Method: write the time as a decimal number of minutes, then divide the volume by the time. Working: 30 seconds = 30/60 minute = 0.5 minute, so 2 minutes 30 seconds = 2.5 minutes. Rate = 20 ÷ 2.5 = 8 litres per minute. Answer: 8 litres per minute. (10 litres per minute comes from ignoring the extra 30 seconds and dividing by 2 minutes only. 8.7 litres per minute comes from misreading 2 minutes 30 seconds as 2.3 minutes instead of 2.5 minutes. 0.125 litres per minute comes from dividing the time by the volume instead of the volume by the time.)
- (b) 3/5 — Method: add all three parts for the total, add together the parts that are not green, then write this over the total. Working: total parts = 4 + 5 + 6 = 15. Not green = 4 + 5 = 9. Fraction = 9/15 = 3/5. Answer: 3/5. 2/5 comes from finding the fraction that IS green (6/15 = 2/5) instead of not green. 4/15 comes from only counting the red baubles as 'not green' and forgetting the gold ones. 9/10 comes from adding only two of the three ratio parts to find the total (4+6=10), missing out the gold part, while still using 9 for the numerator.
- (d) 1 × 10⁷ seconds — Method: the time for a journey is the distance divided by the speed, so round each number to 1 significant figure and then divide; dividing numbers in standard form means dividing the coefficients and subtracting the indices. Working: 3.1 × 10¹⁵ rounds to 3 × 10¹⁵ and 2.998 × 10⁸ rounds to 3 × 10⁸; 3 ÷ 3 = 1 for the coefficients, and 15 − 8 = 7 for the indices. Answer: about 1 × 10⁷ seconds. The distractors: 3 × 10⁷ seconds comes from subtracting the indices correctly but leaving the coefficient as 3 instead of dividing 3 by 3; 1 × 10⁻⁷ seconds comes from dividing the speed by the distance instead of the distance by the speed; 9 × 10²³ seconds comes from multiplying the two quantities instead of dividing them, since 3 × 3 = 9 and 15 + 8 = 23.
- (a) 35 — Method: 25% is 25/100, which cancels to 1/4, so finding 25% of an amount means dividing it by 4. Working: 25% = 25/100 = 1/4, and 140 ÷ 4 = 35. Answer: 35 pens. The distractors: 70 comes from halving instead of quartering, confusing 25% with 50%; 105 comes from working out the pens that are not red, which is 75% of 140, instead of the pens that are; 25 comes from ignoring the percent sign and reading the 25% as a count of 25 pens.
- (c) 6 — Listing systematically: red-black, red-grey, blue-black, blue-grey, green-black, green-grey gives 6 different outfits, matching 3 × 2 = 6. 5 comes from adding the number of T-shirts and shorts instead of multiplying them. 3 comes from counting only the T-shirts. 2 comes from counting only the pairs of shorts.
- (a) 0.625 — Method: convert the fraction to a decimal so it can be compared properly with 0.6. Working: 5/8 = 0.625, and since 0.625 > 0.6, the larger value is 0.625. Answer: 0.625. 0.6 repeats Sam's incorrect claim, made by comparing single digits rather than full place value. 0.58 comes from converting 5/8 incorrectly, treating it as if it read 5 tenths and 8 hundredths. 0.85 comes from turning the fraction upside down and writing its digits straight after the decimal point, 8 then 5, instead of dividing.
- (b) 4 — Method: list the factors of each number and compare them; the highest common factor is the largest number that appears in both lists. Working: the factors of 20 are 1, 2, 4, 5, 10, 20; the factors of 32 are 1, 2, 4, 8, 16, 32. The numbers that appear in both lists are 1, 2 and 4, and the largest of these is 4. 2 is a common factor of 20 and 32 but not the largest one. 8 is a factor of 32 but not of 20, since 20 ÷ 8 is not a whole number. 160 is the lowest common multiple of 20 and 32, not their highest common factor. Answer: 4.
- (d) £4.80 — Method: find the error interval, then check which value falls outside it. Working: half of 20p is 10p, so the actual cost, c, satisfies £4.50 ≤ c < £4.70. £4.80 is above £4.70, so it could not be the actual cost. Answer: £4.80. (£4.50 is a genuine possible cost — it sits at the included lower boundary. £4.65 is a genuine possible cost, below the £4.70 upper boundary. £4.55 is a genuine possible cost, well inside the interval.)
- (c) 5 — Method: work out the volume of one box, divide the total volume by it, then round down since a partial box cannot fit. Working: volume of one box = 7³ = 343 cm³. 2000 ÷ 343 = 5.83 (2 d.p.). Since only whole boxes fit, the greatest number is 5. Answer: 5. (6 comes from rounding 5.83 up to the nearest whole number instead of rounding down to the number of boxes that actually fit. 343 comes from giving the volume of one box instead of the number of boxes. 5.8 comes from leaving the division as a decimal instead of rounding down to a whole number of boxes.)
- (d) 12 — Method: if the bracelets are identical and no beads are left over, the number of bracelets must divide exactly into both totals, so it is the highest common factor of 24 and 36. Working: 24 = 2³ × 3 and 36 = 2² × 3²; taking the lower index of each shared prime gives 2² × 3 = 4 × 3 = 12. Each bracelet then has 2 red beads and 3 blue beads. Answer: 12. The distractors: 6 comes from taking each shared prime once rather than at its lower index, giving 2 × 3, which is a common factor but not the highest; 72 is the lowest common multiple of 24 and 36, from taking the higher index of each prime instead of the lower; 60 comes from adding the two bead totals instead of looking for a common factor.
- (c) £47.00 — First apply the 20% reduction: £65 × 0.8 = £52.00. Then take off the further £5: £52.00 − £5 = £47.00. Treating the 20% as a flat £20 rather than a percentage of the price, £65 − £20 − £5, gives £40.00. Applying the 20% reduction correctly but forgetting to take off the extra £5 leaves £52.00. Taking off the £5 first and then applying the 20% reduction to the smaller amount, (£65 − £5) × 0.8, gives £48.00.
- (b) 78 hours — From 10:00 on Monday to 10:00 on Thursday is exactly 3 complete days, which is 3 × 24 = 72 hours. From 10:00 to 16:00 on the Thursday is a further 6 hours, giving a total of 72 + 6 = 78 hours. Counting Monday to Thursday as 4 full calendar days instead of 3 complete 24-hour periods gives 4 × 24 = 96 hours. Undercounting the number of complete days as 2 instead of 3 gives 2 × 24 + 6 = 54 hours. Subtracting the extra 6 hours instead of adding them to the 3 complete days gives 72 − 6 = 66 hours.
- (d) 17 — 8 ÷ 2 = 4, then 20 − 4 = 16, then 16 + 1 = 17. Stopping after the subtraction and forgetting to add the final 1 leaves 16. Adding the 4 and the 1 together before subtracting gives 4 + 1 = 5, then 20 − 5 = 15 — the subtraction should use the 4 from the division, not a combined total. Working strictly left to right without giving division priority gives 20 − 8 = 12, then 12 ÷ 2 = 6, then 6 + 1 = 7.
- (a) 2/5 — The ratio 2:3 has 2 + 3 = 5 parts in total, and the larger plot is 3 of those parts. Since the larger plot is 18 m², each part is 18 ÷ 3 = 6 m², so the total area is 5 × 6 = 30 m² and the smaller plot is 2 × 6 = 12 m². The fraction of the total area taken up by the smaller plot is 12/30, which simplifies to 2/5. Giving the fraction for the larger plot instead of the smaller one gives 3/5. Comparing the smaller plot to the larger plot instead of to the total area gives 2/3. Assuming the two plots split the area evenly, ignoring the given ratio altogether, gives 1/2.
- (c) £4.05 — The total cost is 7 × 85p = £5.95. Josh's change is £10.00 − £5.95 = £4.05. Taking off the pounds and then only the 5p digit, £10.00 − £5.00 = £5.00 followed by £5.00 − £0.05, ignoring the 90p altogether, gives £4.95. Rounding the cost up to £6.00 and never accounting for the extra 5p at all gives £4.00. Multiplying 7 × 85 incorrectly as 605 (a slip in 7 × 5) gives a total cost of £6.05, and correctly subtracting that from £10.00 gives £3.95.
Build your own mix at the worksheet builder.