Printable · GCSE Foundation · ages 14-16
Number worksheet — GCSE Foundation
Fifteen questions across the number statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Number worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.To estimate the cost of buying 38.7 m of rope at £21.40 per metre, both numbers are first rounded to 1 significant figure. Work out the estimate.
- 2.Sam rounds 0.070268 to 3 significant figures and writes 0.0703. Which of these statements is correct?
- 3.Write these three numbers in order, starting with the smallest: 3/5, 0.55, 58%
- 4.Work out the value of .
- 5.In a science experiment, the temperature of a liquid is recorded as 18.6 °C, correct to the nearest 0.2 °C. Write down the error interval for the actual temperature, T °C.
- 6.Work out (8 × 10⁻⁵) × (5 × 10³). Give your answer in standard form.
- 7.A pair of trainers is priced at £80 online. The shop takes 25% off the price and then adds £10 for next-day delivery. Work out the total cost.
- 8.A jumper is reduced by 15% in a sale to a price of £42.50. Work out the original price.
- 9.A machine fills bags of sugar and shows the mass of each bag to the nearest 10 g. A checker rejects any bag whose actual mass is less than 996 g. One bag shows a mass of 1,000 g on the machine. Decide whether this bag could be rejected, and give a reason for your answer.
- 10.The distance from the Earth to the Moon is 384,000 km. Write this distance in standard form, in kilometres.
- 11.Postage on a parcel is calculated as £4.60, correct to the nearest 20p. Which of these could not be the actual cost of the postage?
- 12.A tin of soup has a mass of 450 g. A bag of potatoes has a mass of 2.6 kg. Work out the total mass, in kilograms.
- 13.A café buys 18 boxes of teabags at £3.45 each, and sells all the teabags for £108 in total. Work out the café's profit.
- 14.Write these fractions in order, starting with the smallest: 2/3, 3/5, 5/6, 1/2
- 15.A car is hired from 10:00 on Monday until 16:00 on Thursday. Work out the total length of the hire, in hours.
Build your own mix at the worksheet builder.